Loading...
HomeMy WebLinkAboutNotice of Award for 11th & College Roundabout to Knife River of Belgrade.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian Heaston, Project Engineer Richard Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: Authorize the City Manager to Sign a Notice of Award for Construction of the 11th/College Roundabout to Knife River of Belgrade at a Cost of $652,747.35. MEETING DATE: May 2, 2011 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to Sign a Notice of Award for Construction of the 11th/College Roundabout to Knife River of Belgrade at a Cost of $652,747.35. BACKGROUND: Construction bids for the 11th/College roundabout project were opened on March 29, 2011. Two bids were received, with Knife River of Belgrade being the low bidder at a cost of $652,747.35, which was 4% under the consulting engineers estimate for the project. The consultant’s certified bid tabulation and award recommendation letter are attached to this memorandum. The city Engineering Division has reviewed the low bidder’s proposal along with the consultant’s recommendation and concurs that award of a construction contract be made to Knife River of Belgrade. The notice of award must be signed within 60 days following the opening of bids, which is May 27. The contractor is provided 60 days to construct the project to substantial completion. Per contract, the project must be complete no later than August 23 to beat the rush of activity in conjunction with the beginning of MSU’s fall semester. UNRESOLVED ISSUES: None. ALTERNATIVES: 1. Deny award of the roundabout construction project and proceed with design of a signalized intersection. 2. Deny award of the roundabout construction project and maintain the existing 4-way stop controlled intersection. 3. As recommended by the Commission. FISCAL EFFECTS: Total cost contemplated to the fund the project at this time of award is $860,362.35, broken out as follows: 64 · Right-of-Way and Temporary Construction Permits = $160,428.20 · Construction = $652,747.35 · Construction Phase and Project Documentation Consultant Services per PSA = $47,187.00 There are sufficient dollars available in the SIF fund to complete the construction of the project without creating a negative position in the fund, or within the 5-year CIP schedule. Attachments: Notice of Award; Award Recommendation Letter from Robert Peccia & Associates; Certified Bid Tabulation Report compiled on: April 21, 2011 65 NOTICE OF AWARD Dated: __________________ TO: Knife River - Belgrade ADDRESS: P.O. Box 9, Belgrade, MT 59714 PROJECT: College and 11th Street Roundabout CONTRACT FOR: $652,747.35 You are notified that your Bid opened on March 29, 2011, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for the: College and 11th Street Roundabout. The Contract Price of your Contract is: Six Hundred Fifty-Two Thousand Seven Hundred Forty-Seven Dollars and Thirty-Five Cents ($ 652,747.35). Five (5) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by _______________. 1. You must deliver to the OWNER Five (5) fully executed counterparts of the Agreement including all the Contract Documents and Drawings. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instruction to Bidders (Articles 8-10), and the General Conditions (paragraph 5.01). 3. List other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in the General Conditions (Article 5) and Supplementary Conditions (Article 1). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (10) days after you comply with these conditions, OWNER will return to you two fully signed counterpart of the Agreement with the Contract Documents attached. CITY OF BOZEMAN, MONTANA ATTEST: BY: __________________________________ BY: ____________________________ (CITY MANAGER) (CITY CLERK) DATE: _______________________________ 66 67 68 69