HomeMy WebLinkAboutLandfill Liner System Change order 1 with Van Dyke ConstructionCHANGE ORDER (Instrucdons on reverse side) No. 1 PROJECT: Bozeman Landfill DATE OF ISSUANCE: 9/29/95 Liner System OWNER: (Name. City of Bozeman Address) CONTRACTOR: Van Dyke Construction Co. OWNER's Project No. 94-132 ENGINEER: Damsphen & Associates, Inc. CONTRACT FOR: Landfill Liner System ENGINEER's Project No. —_ 94-15D You are directed to make the following changes in the Contract Documents. Description: Change Order #1 Purpose of Change Order: Summary of Project Additive and Deductive Items Attachments: (List documents supporting change) Please see enclosed Change Order #1 summary CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME. OtWinal COMMCE Price Ori2inal. Contract Time 1,853,00O 60 calendar days days or date Previous Change Orders .N to No. Net change from previous Change Orders N/A. N / A days Contract Price prior to this Change Order Contract Time Nor to this Change Order 1,..85 000 60 calendar days days or data Net Increase (decrease) of this Change Order Net Increase (decrease) of this Change Order 0 days Contract Price with all approved Change Orders Contract Time with all approved Change Orders L-8 5 3,000 60 calendar days days or date RECOMMENDED; APPROVED: APPROVED: E1 by En .17e Ij u lAer ,:,el CIO, E' 'io. 1916-8-B WA5 Edinun) re tk,c Env ,irccrt low+ D cumcnli (.rmmilicc 3r.d cndnr%cd by Tr] A-,uaxjar,d r',111,•11 BOZEMAN LANDFILL CHANGE ORDER #1 SUMMARY ADDITIVES AMOUNT 1. Soil cover berm around cell perimeter $1500 2. Additional rip rap work: leachate pond spillway, cutoff trenches, rip rap side slopes on drop structure $1500 3. Steel protective casing for leachate piping ditch crossing $1500 4. 1500 cu yd pit run gravel stockpile (see attached letter) $7500 5. Extra leachate pond capacity $1000 G. Sloping and earthwork improvements to stormwater ditch in vicinity of leachate pond $2000 7. Reconstruction of 10' wide southern berm $800 8. Extra gravel at liner penetration $200 9. Valve keys for pond valve $110 TOTAL ADDITIVES $16,110 DEDUCTIVE Geosynthetic Material Quantity Decrease (See Attached Letter) -$16,110 NET AMOUNT CHANGE ORDER #1 0 THE CITY OF E30ZEMAN 411 E. MAIN ST. P.O. SOX 640 PHONEITDD (406) 582-2300 BOZEMAN, MONTANA 59771-0640 September 7, 1995 VanDyke Irrigation Service, Inc. agrees to deliver 1500 cubic yards of 6 inch minus pit- run gravel to the City of Bozeman Landfill located off Story Mill Road. The cost of the gravel (delivered) shall be $5.00 per cubic yard for a total cost not to exceed $7,500. The gravel shall be delivered before December 1, 1995, unless other arrangements have been made with the City Landfill manager. VanDyke Irrigation shall deliver and stockpile the gravel in an area at the landfill agreeable with the Landfill manager. After the gravel has been delivered and stockpiled, VanDyke Irrigation shall submit a bill for the gravel materials to the City of Bozeman Landill Department, attention Roger Sicz. ��y d �, 1 V anDyke ation, Inc. Landfill Manager u r * th o . ed ignature/Date Authorized Signature/Date HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK I'Z 3 vi:> : J.Dm-1 r NW LiNINL2b & UEUIEX] 3 L l 140bbbbWt>,),3 H-01 August 17,1995 Van Dyke Construction 5651 Love Lane Bozeman, Montana 59715 Attention: Larry Van Dyke Facsimile: 1-406-586-0653 Dear Larry, Per your request the following is an itemized account of the credit Northwest Linings will issue Van Dyke Construction for 18,000 SF less HDPE, Bentornat, and Flownet. 18,000 SF of 60 Mil HDPE Tex 2 sides @ $,31151= = $5,580.00 18,000 SF of Bentomat @ $,2518F $4,500.00 18,000 SF of Flownet @ $,3361SF SE.Q30,00 Total Credit $16,110,00 If you have any questions please contact Steve Gordner at your convenience. W-04 d � W-.'O' A, "ARM � M .