HomeMy WebLinkAboutLandfill Liner System Change order 1 with Van Dyke ConstructionCHANGE ORDER
(Instrucdons on reverse side) No. 1
PROJECT: Bozeman Landfill DATE OF ISSUANCE: 9/29/95
Liner System
OWNER:
(Name. City of Bozeman
Address)
CONTRACTOR: Van Dyke Construction Co. OWNER's Project No. 94-132
ENGINEER:
Damsphen & Associates, Inc.
CONTRACT FOR:
Landfill Liner System ENGINEER's Project No. —_ 94-15D
You are directed to make the following changes in the Contract Documents.
Description: Change Order #1
Purpose of Change Order:
Summary of Project Additive and Deductive Items
Attachments: (List documents supporting change)
Please see enclosed Change Order #1 summary
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIME.
OtWinal COMMCE Price
Ori2inal. Contract Time
1,853,00O
60 calendar days
days or date
Previous Change Orders .N to No.
Net change from previous Change Orders
N/A.
N / A
days
Contract Price prior to this Change Order
Contract Time Nor to this Change Order
1,..85 000
60 calendar days
days or data
Net Increase (decrease) of this Change Order
Net Increase (decrease) of this Change Order
0
days
Contract Price with all approved Change Orders
Contract Time with all approved Change Orders
L-8 5 3,000
60 calendar days
days or date
RECOMMENDED; APPROVED: APPROVED:
E1 by
En .17e Ij u lAer ,:,el CIO,
E' 'io. 1916-8-B WA5 Edinun)
re tk,c Env
,irccrt low+ D cumcnli (.rmmilicc 3r.d cndnr%cd by Tr] A-,uaxjar,d r',111,•11
BOZEMAN LANDFILL
CHANGE ORDER #1 SUMMARY
ADDITIVES
AMOUNT
1.
Soil cover berm around cell perimeter
$1500
2.
Additional rip rap work: leachate pond
spillway, cutoff trenches, rip rap side
slopes on drop structure
$1500
3.
Steel protective casing for leachate
piping ditch crossing
$1500
4.
1500 cu yd pit run gravel stockpile (see
attached letter)
$7500
5.
Extra leachate pond capacity
$1000
G.
Sloping and earthwork improvements to
stormwater ditch in vicinity of leachate
pond
$2000
7.
Reconstruction of 10' wide southern berm
$800
8.
Extra gravel at liner penetration
$200
9.
Valve keys for pond valve
$110
TOTAL ADDITIVES
$16,110
DEDUCTIVE
Geosynthetic Material Quantity Decrease
(See Attached Letter)
-$16,110
NET
AMOUNT CHANGE ORDER #1
0
THE CITY OF E30ZEMAN
411 E. MAIN ST. P.O. SOX 640 PHONEITDD (406) 582-2300
BOZEMAN, MONTANA 59771-0640
September 7, 1995
VanDyke Irrigation Service, Inc. agrees to deliver 1500 cubic yards of 6 inch minus pit-
run gravel to the City of Bozeman Landfill located off Story Mill Road. The cost of the
gravel (delivered) shall be $5.00 per cubic yard for a total cost not to exceed $7,500. The
gravel shall be delivered before December 1, 1995, unless other arrangements have been
made with the City Landfill manager. VanDyke Irrigation shall deliver and stockpile the
gravel in an area at the landfill agreeable with the Landfill manager.
After the gravel has been delivered and stockpiled, VanDyke Irrigation shall submit a
bill for the gravel materials to the City of Bozeman Landill Department, attention Roger
Sicz.
��y d �, 1
V anDyke ation, Inc. Landfill Manager
u r
* th o . ed ignature/Date Authorized Signature/Date
HOME OF MONTANA STATE UNIVERSITY
GATEWAY TO YELLOWSTONE PARK
I'Z 3 vi:> : J.Dm-1 r NW LiNINL2b & UEUIEX] 3 L l 140bbbbWt>,),3 H-01
August 17,1995
Van Dyke Construction
5651 Love Lane
Bozeman, Montana 59715
Attention: Larry Van Dyke
Facsimile: 1-406-586-0653
Dear Larry,
Per your request the following is an itemized account of the credit Northwest Linings will
issue Van Dyke Construction for 18,000 SF less HDPE, Bentornat, and Flownet.
18,000 SF of 60 Mil HDPE Tex 2 sides @ $,31151= = $5,580.00
18,000 SF of Bentomat @ $,2518F $4,500.00
18,000 SF of Flownet @ $,3361SF SE.Q30,00
Total Credit $16,110,00
If you have any questions please contact Steve Gordner at your convenience.