HomeMy WebLinkAbout1994 Water Repair and Renovation, Change order 1City ofBozeman
1994 Water Repair Renovation Project
IVISE-HKIVI,INC~
Engineering
TO: Change Order Nu.:
Dave Johnston Data
Johnston Excavat Project No:
805 BKachmore P[oon Contract For:
Bozeman, MT.
It has been determined necessary and in the best interest of the OWNER tm modify certa portions otthe
PROJECT above and the CONTRACT dated July 10,189S , and in accordance with Article 1O
mf the General Conditions. The following changes are hereby agreed to:
DESCRIPTION:
1
25-Jul-96
2M2JS.128
City of Bozema
19B4 Water Repair
and Renovation
Item 1.— Delete current Temporary Water Service specification, and temporary water service bid item prices 117,
217 and G2O^ Replace current temporary water specification with revised specification on attached exhibit
|"/\°' Replace current bid item prices 117,Z17,315 and 520, with bid prices given in estimate and cost table
|
Item 2.—Add bid item G30 for the removal and replacement of unsuitable trench backfiU. This bid items shall be
based Section 2221 (05.) C. (5) of the MPWSS-
Item 3. —Add bid items 522, 523, and 524 for 3/4~ water services on South 4th. Item 522 is for all materials and
labor for 3/4° copper services from now D.I. Main to new or exist curb box on west side nf street. Item 523 is
for suppling all materials and labor for 314~ copper services from new D.I. Main to new or existing curb box on east
�side ufstreet. Item 524is for suppling aUmaterialo and labor for the installation of new curb bnxo.
Item 4,— Add bid items 132 232,332, 432 and 53% for additional utility crossings not shown nn the plans.
T items s include all materials, labor and markup for the crossing of underground utilities not shown unthe
bid documents. The quantity and location of all additional Utility Grossing shall be approved by the engineer.
ESTIMATE AND COST
Note: The quantities shown are not guaranteed.
Payment will be based actual quantities used.
ITEM I QUANTITY
UNIT
DESCRIPTION_
UNIT PRICE
AMOUNT
Item 1. Tempora[y Water Service
Delete Current Unit Price
Revised Unit Price
117
1
LS
Temp. Water
$400.00
217
1
LS
Temp. Water
$4,12434
315
1
LS
Temp. Water
$1,924,69
520
1
LS
Temp. Water
$9,623.45
Item 1. -- Total Net Increase
sq
Page 1
City of Bozeman
1994 Water Repair Renovation Project
ESTIMATE AND COST
Note: The quantities shown are not guaranteed.
Payment will be based on actual quantities used.
ITEM I QUANTITY I UNIT DESCRIPTION UNIT PRICE AMOUNT
Item 2. -- Removal & Replacement of Unsuitable Backfill
530
400
Ton
Unsuit. Backfill
$12.00
$4,800.00
Item 2. — Total Net Increase
04,800.00
1
Item 3. — Water Services South 4th
522
2
Ea.
West side Service
$440.00
$880.00
523
1
Ea.
East Side Service
$650.00
$650.00
524
3
Ea.
Curb Box
$80.00
$240.00
Item 3. -- Total Net Increase
$1,770.00
Item 4. -- Additional Utilit y Crossings
132, 232, 332,
432,532 1 Ea. Add. UtI. X'inq $376.09 $376.09
Item 4. -- Total Not Increase $376-09
Time (extension) (decrease) 0 Days Total cost Increase $16,918,57
Not valid until signed by both the Owner and Engineer. Signature of the Contractor indicates his agreement
herewith, including any adjustment in the Contract Sum or Contract Time.
The Original Contract Sum was $288,028.00
Net change by previously authorized Change Orders $0.00
The Contract Sum prior to this Change Order was $288,028.00
The Contract Sum will be (increased) by this Change Order $16,918,57
The new Contract sum including this Change Order will be $304,946.57
The Contract Time will be (increased) by 0 Days
The Date of Substantial Completion as of the date of this
Change Order therefore is Nov. 28,1996
CONTRACTOR:
Name
By:
RepresentatWe Title
Page 2
City of Bozeman
1994 Water Repair Renovation Project
APPROVED:
City of Bozeman
By: CITY OF BOZEMAN
Re4esentative Title City Manager
Page 3