HomeMy WebLinkAbout1994 Water Repair and Renovation, Change order 1City ofBozeman 1994 Water Repair Renovation Project IVISE-HKIVI,INC~ Engineering TO: Change Order Nu.: Dave Johnston Data Johnston Excavat Project No: 805 BKachmore P[oon Contract For: Bozeman, MT. It has been determined necessary and in the best interest of the OWNER tm modify certa portions otthe PROJECT above and the CONTRACT dated July 10,189S , and in accordance with Article 1O mf the General Conditions. The following changes are hereby agreed to: DESCRIPTION: 1 25-Jul-96 2M2JS.128 City of Bozema 19B4 Water Repair and Renovation Item 1.— Delete current Temporary Water Service specification, and temporary water service bid item prices 117, 217 and G2O^ Replace current temporary water specification with revised specification on attached exhibit |"/\°' Replace current bid item prices 117,Z17,315 and 520, with bid prices given in estimate and cost table | Item 2.—Add bid item G30 for the removal and replacement of unsuitable trench backfiU. This bid items shall be based Section 2221 (05.) C. (5) of the MPWSS- Item 3. —Add bid items 522, 523, and 524 for 3/4~ water services on South 4th. Item 522 is for all materials and labor for 3/4° copper services from now D.I. Main to new or exist curb box on west side nf street. Item 523 is for suppling all materials and labor for 314~ copper services from new D.I. Main to new or existing curb box on east �side ufstreet. Item 524is for suppling aUmaterialo and labor for the installation of new curb bnxo. Item 4,— Add bid items 132 232,332, 432 and 53% for additional utility crossings not shown nn the plans. T items s include all materials, labor and markup for the crossing of underground utilities not shown unthe bid documents. The quantity and location of all additional Utility Grossing shall be approved by the engineer. ESTIMATE AND COST Note: The quantities shown are not guaranteed. Payment will be based actual quantities used. ITEM I QUANTITY UNIT DESCRIPTION_ UNIT PRICE AMOUNT Item 1. Tempora[y Water Service Delete Current Unit Price Revised Unit Price 117 1 LS Temp. Water $400.00 217 1 LS Temp. Water $4,12434 315 1 LS Temp. Water $1,924,69 520 1 LS Temp. Water $9,623.45 Item 1. -- Total Net Increase sq Page 1 City of Bozeman 1994 Water Repair Renovation Project ESTIMATE AND COST Note: The quantities shown are not guaranteed. Payment will be based on actual quantities used. ITEM I QUANTITY I UNIT DESCRIPTION UNIT PRICE AMOUNT Item 2. -- Removal & Replacement of Unsuitable Backfill 530 400 Ton Unsuit. Backfill $12.00 $4,800.00 Item 2. — Total Net Increase 04,800.00 1 Item 3. — Water Services South 4th 522 2 Ea. West side Service $440.00 $880.00 523 1 Ea. East Side Service $650.00 $650.00 524 3 Ea. Curb Box $80.00 $240.00 Item 3. -- Total Net Increase $1,770.00 Item 4. -- Additional Utilit y Crossings 132, 232, 332, 432,532 1 Ea. Add. UtI. X'inq $376.09 $376.09 Item 4. -- Total Not Increase $376-09 Time (extension) (decrease) 0 Days Total cost Increase $16,918,57 Not valid until signed by both the Owner and Engineer. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Original Contract Sum was $288,028.00 Net change by previously authorized Change Orders $0.00 The Contract Sum prior to this Change Order was $288,028.00 The Contract Sum will be (increased) by this Change Order $16,918,57 The new Contract sum including this Change Order will be $304,946.57 The Contract Time will be (increased) by 0 Days The Date of Substantial Completion as of the date of this Change Order therefore is Nov. 28,1996 CONTRACTOR: Name By: RepresentatWe Title Page 2 City of Bozeman 1994 Water Repair Renovation Project APPROVED: City of Bozeman By: CITY OF BOZEMAN Re4esentative Title City Manager Page 3