1994 Water Repair and Renovation, Change order 2
City of Bozeman 1994 Water Repair Renovation Project MSE-HKM, INC. Engineering CHANGE ORDER TO: Change Order No,: Dave Johnston Date: Johnston Excavating Project No: 805 Blackmore Place Contract For: Bozeman, MT. 1 It has been determined necessary and in the best interest of the OWNER to modify certain portions of the PROJECT above and the CONTRACT dated July 16, 1996 , and in accordance with Article 10 of the General Conditions, The following changes are hereby agreed to: 2 23-Dec-96 ZM229.128 City of Bozeman 1994 Water Repair and Renovation DESCRIPTION: Item No. I Extras per Letters Dated September 29, 1996 & September 2, 1996 from Johnston Excavating to MSE-HKM (see attached letters) Item No. 2. Extras per October 25, 1996 Letter From Johnston Excavating, Inc. To MSE-HKM Item No. 3. Quantity Adjustment (see attached Exhibit "A"), to final actual quantities used. ESTIMATE AND COST Note: The quantities shown are not guaranteed. Payment will be based on actual quantities used. .ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT —M RIV. I -- CALROU per Lexiers wateo tiepTemoer zu, 1UU0 2Sx September 2, 1996 from RACC UVIA 1 Utility Crossing NA 2 Sewer Repair on Cottonwood Sta 6 +50 L.S. 1 $596.98 $596.98 3 Additional Mega-lugs on Cottonwood Sts 7 + 29 L.S. 1 $147,38 $147.38 4 Fire Hydrant Riser on Cottonwood Ste 6+83 L.S. 1 $492.45 $492.45 6 Valve Installation on North Church Ste 3 +60 L.S, 1 $3,186.61 $3,186.61 6 Curb Stop Replacement on Cottonwood Ste 9 +16 L.S. 1 $1,584.99 $1,584.99 7 Curb Stop Replacement on Cottonwood Ste 10 +52 L.S. 1 $1,209.69 $1,209.69 8 Pipe Insulation on North Church sta 3 + 60 L.F. 84 $4.50 $378.00 9 Changed Condition at Intersection Garfield and 4th Streets Hr. 7 $376.09 $2,632.63 10 Sewer Repair NA 11 Corp Exchange on 4th Ste 7+93 Hr. 1 $51.20 $51,20 12 Sewer Repair an 4th Ste 5 +60 L'S. 1 $390.26 $390.26 13 Short Water Service NA 14 Water & Sewer Service Repair on 4th Ste 4 +45 L.S. 1 $770.12 $770.12 15 Unsuitable Backfill NA 16 Sewer Repair on 4th Ste 3 +40 L.S. 1 $390.26 $390.26 17 Unsuitable Backfill NA 18 Additional Gravel Base N. Church C.Y. — 40 $15.00 $600.00 19 Additional Gravel Base Wallace C.Y• 60 $15,00 $900.00 L- 211, 22 Additional Utility Crossiqq _ I I I NA E 23 L24 Additional Concrete at Valley Gutters S.Y. 204 $2.3 $475,32 = Corp Replacement L.S. J_ 1 $940.23 $940.23 City of Bozeman 1994 Water Repair Renovation Project ESTIMATE AND COST ITEM NO. DESCRIPTION UNIT I QUANTITY UNIT PRICE AMOUNT 1 25 lCorp Replacement L.S. J 1 $611.87 $611.8 .. 7 11tern 1. -- Total Not Increase 1 $15.357.99 lipm 2 -- FvtrA. nor nrfnk— 99 1 Con 1 -14-. r.-- 26 Install 18" Cap For Pressure Test of LS 1 $1,066.41 *1,066.41 LS Old Main, Sch, 1, Ste 9 + 40 $10,724.77$10,724.77 $334,150.86 The Contract Time will be (increased) by 0 Days 27 Exploratory Excavation Change Order therefore is Item 3. -- Total Not Increase 11 $ NA 28 Utility Crossing NA 29 Abandon Water Main — 8 NA 30 Pre ssure Test Existing Main, Sch 1, Hr $39.02 $312.16 Ste 9 +40 to 9 +55 31 Extra Tap For Pressure Test, Sch 1 LS 1 $387.62 $387.62 Ste 9 + 40 32 Water Shut-down Notification, Sch I — — Hr. 1 — $39,02 $39.02 Additional 18" Connection, Schedule I LS 1 $1,316.32 $1,316.32 Ste 9 + 40 Item 2. -- Total Net Increase 121.53 Item 3. -- Quantity Adjustment (see attached Exhibit "A") Quantity Ad Per Attached Exhibit "A" Time (extension) (decrease) 0 Days Total cost Increase 529,204.29 Not valid until signed by both the Owner and Engineer. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time, The Original Contract Sum was $288,028.00 I $16,918,57 The Contract Sum prior to this Change Order was $304,946.57 LS - 1 $10,724.77$10,724.77 $334,150.86 The Contract Time will be (increased) by 0 Days The Date of Substantial Completion as of the date of this Change Order therefore is Item 3. -- Total Not Increase 11 $ Time (extension) (decrease) 0 Days Total cost Increase 529,204.29 Not valid until signed by both the Owner and Engineer. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time, The Original Contract Sum was $288,028.00 Net change by previously authorized Change Orders $16,918,57 The Contract Sum prior to this Change Order was $304,946.57 The Contract Sum will be (increased) by this Change Order 529,204.29 The new Contract sum including this Change Order will be $334,150.86 The Contract Time will be (increased) by 0 Days The Date of Substantial Completion as of the date of this Change Order therefore is Nov. 28, 1996 CONTRACTOR, ENGINEER, Johnston Excavatinn Inc. MSE-HKM Engineerincl Inc. Name Name By: tu"'�'4 �- &Z' Representative Title APPROVE:D: City of Bozeman By: Ron Brey, Acting City Manager . . . ....... . -- Representative Title By: representative Title 2 ' 0 CD 0 C4 0 M- cc w ro 0 C) LA n o as -lox - > < > > H Z3 ea rL rA CL w CD a. CL cti 0 2 Fv W E to w o CD < 3 m m t:d 0 :3 KOJ 0 to w 3 W U C3^, to 41 W Q — CD Q 8S 8 O a 0 CD CL CL C. rz C. Col S 0 : F4, "9� Ej- 0 0 r4 C-o m m p rnC4 C U CerK� > > > rs 00 CA p vi �-) w :p cm . :-- C) C> Q C> <D U, " L.It, b C> C> E ; Q, C) U, a CA tQ V 0e ,=, PI 0 p p W 0 5 ::; p 0 a C7 0 — 660 o 0 CD 0 0C, C:) 0 0b 0 o00aaQQQca4a 0 b CD b b 0 EH Le) EA V) Ul) �A L C> Q t) CD w 00 C O 01 W LA O W L, <:, CD 00 w lA 0 CD w Q lz;l CI C C Q C) CD Q 0 C? 0 Q CD 0 0 Cl C. O — — — LA t,) N -P- oo rA tQ ' LA tj U U us C, kA L. sra se f A ID tO EA W Ln fA CD n 0 Lh 0 V) C 8 -C�. <21 CD CD w C> C� 00 P C. C> O. C 000 i;? 66 6 i-o c> c;> C; Q O C) C CD 0 0 0 CD C w C> tQ C C11 Q C7 C3 a, Oc > w LM te) 8 V9 1=1 CD w O p I C7 k4 cq<=1 I e I CD I I C> I 00 c) C= - C� I 8 0 I a Q I a- If ' 0 CD 0 C4 0 M- cc w ro 0 C) LA n o as -lox - > < > > H Z3 ea rL rA CL w CD a. CL cti 0 2 Fv W E to w o CD < 3 m m t:d 0 :3 KOJ 0 to w 3 417 O O Z; -0 -4 @ M 8 S 1 4 OR � IR, c a ' LA 42 'W W 2 — — — — ti i"a - ITI n C) — C\ — c, — 0 — O, 0 Rjo 'a CD 0 0 tr 0 ua x CD C tw rr w w rn � C4 < Kaaaa > aa ----------- > > >1 > -- 00 En 00 V- C) b - -4 -4 tlJ tQ -q C/3 V, N' ki, fP3 Kfl ki, 6C t,) Efg — fR oc CD C, V, <D LA 2x7 0 Cl Cl L-1 0 p O. In p p 5> - — C C' C 0 C> C� <:> CD CD C:, o C:) c, cS n C> <D CD kA 0 C (D CD C, 0 CD d C? CD C) C:) 0 C> d CO b 'C> I CR I CJ "lo 6 ---------------- (D fA 0 lz7 C� C:� 0 I= C) V) (A (1) fn (A 66 QC 41 1.4 6 -) N C? w 00 V� 2 6 7, r- 6 L kr. Cl 5 5 p p p C !!2 ,� C C=> C, �> 6 C3 C> O C> tQ O (D d 1= <=, U CY, 00 Lo C> 0 C <D c O C: 0 'cl 'o C) bn N k4 CA G+66 W b9 En L's w En CZ) LA C:� tQ Ln 00 tQ 58, o (3 t , 66 6 66 CD C=> C= C:l d 6 6 6 CD t2l tQ Vi �n vi V) Z' Q9 p ill � -3 V) � p ul cm to 'D tag A iA O.Po N 0;1 --4 0 U, wl c:> CD oc Em ca U, C> 00 d6 'o lc� C\ O Ln v 6L,nO O CD d' LA ,Z, 6 8 — b C> --- C. C= — 1= — b C:: — 6 — 6 4=1 — 08 — 1 ,-f I — L— us — — I 8 1'a ' 1 8 1 ,8 1 ,8 1 417 O O Z; -0 -4 @ M 8 S 1 4 OR � IR, c — — — — — — — i"a - ITI - OTC, — — C\ — c, — 0 — O, 0 Rjo 'a rr w w rn � C4 < Kaaaa > aa ----------- -- En 00 V- C) b - -4 -4 tlJ tQ -q k4 : I- U9 Ll. tJ — (A O 6 N tQ W m 0 U, 6 C=) Lr, L.A n C> <D CD kA 0 co 0 " -1- 'Q 6 C] 'ti, '6 * d 'C3 i b 'C> I CR I CJ "lo 6 ---------------- (D C> 0 lz7 C� C:� 0 I= C) 0c, C3 ED 0.0 !!2 ,� Ln tQ Oc a, — U CY, C <D c O C: 0 'cl 'o C) t2l tQ Vi �n vi V) Z' Q9 p ill � -3 V) � p ul cm to 'D tag A iA O.Po N 0;1 --4 0 U, N 00 c:> CD " L , , " (I, 'g, = C> 1= 'C. d6 'o lc� C\ lc� 66'r, 6L,nO O CD d' LA ,Z, 6 8 — b C> --- C. C= — 1= — b C:: — 6 — 6 4=1 — — — — — — — — — H I 1 6,16 1c, c> 1 0 A � bn fA f^ Eft Ql M CD W 6- Cr9 (A VI '-A LM occ) 0 00 f8l,81 0 ' = > ,I 8 18, 1,8, 1 f8 0 417 O O Z; -0 -4 � Q LA 4, - 4% 4- 4- -L -t:. A A O C> 1 0 CD 0 <D O C) C> N tZI L�!, — — — — — — U, V, tJ- Ul to LA 00 -j LA — 2 fa 0. Ca. CD 0 ci y4 0 :� = 0 (p 0 :3 e ow 6 cp n w zL C 0 m CL UQ > CD E Ln CD p :Z. 1 0 c ro ts CD <D O 0 C> d w C::> (A w N A 4 CZ) EM " g 0 CD d C> 0 C>l <D iDl o C) C:) 0 CD d 0 0 0 C>l J j CD Q Z) 0 rnr 0 Cn m tr) t Lo Ln co bi En - 71 � CA -11 >>>> D* <D > > , > CD CD oo A O N 8 0 0 CD N tj c>cDOdd C. C> C, 6 0 0 0 V) C, CS Ln C. (4 Y V- 0 p to 8 0 bi fl) �4 C 7, (D Uc O V) N b5 C1.3 c 0 fn " W a CD to CD Ln 0 0 (4 1n UA 0 W ul - 00 w CD O PT :, 1 0 1 0 4� CD 00 CD RC � CD CD P 0 o 0 C> c� 000 V) I Ell 0 N U (6 Ln of P . 1 61 En L p 1 10 N L-1 V� �- uo L." tn 4 -4 00 00 a 0 ul Cl w CD N kA N s ue 'S w u 8 V) un L-A to) Ll. Ll 0 P P P P - P. C - pp CD C> cz, 0 c C;, cz� C, <D C, C� C> C; CDR C> 00 0 CD C CD 0 0 C> CD 0 C> 0 CDc 0 CD (D 0 0 CD to tA le N W ki. 0 V) Q) A N jA E, t4 V) Era Eli h,9 b6 p 0 V) .r. uV Lh 0 A 0 O\ x. W - �4 W Uk q� U, d " LA w CA 00 8 H 0 W 0 CD C� n CD CD p C6 c, (A CD r- a (D 0 0 0 (Z> 0 0 t-A C;, C, A C, (D C> 6 C7 D 0 O C) �D 0 CD V, o 0 C> C> 0 CD C> (=> CD h CD Zli 64 Vi dl! E4 (r9 0', C 4 C. us N 10 tj in LA (A En C09 I CD d �4 C> C) 0000 --1 CD p A N 0 0000 400 0 0 Q a O 0 0 Q Q Q C to Cl 0 Q a CD C> � Q LA 4, - 4% 4- 4- -L -t:. A A O C> 1 0 CD 0 <D O C) C> N — — — — — — --- — — 2 fa 0. Ca. CD 0 ci > <D O 0 C> d w C::> (A w N A 4 CZ) EM " g 0 CD d C> 0 C>l <D iDl o C) C:) 0 CD d 0 0 0 C>l J j CD Q Z) 0 bi D* <D C) V) 00 CD CD oo A O N 8 0 0 CD 0 0 c>cDOdd C. C> C, 6 0 0 0 CD C, CS 0 0 0 O 8 0 C, LOD V) un L-A to) Ll. Ll t-A <> 0 00 CD C> 0 0 c C c> CD 0 0 0 C oo 0 c 00 H 0 W 0 CD C� n 0 0004 r <> C6 c, (A CD r- CD C;, C, M r-.- C> C, (D C> � Q z 6) m 0 m 0� on NMI us CD CD i 9 ED 0 0 O 0 css 3 4�. -4 W W W Lin Ln w 1 0 " m " 0 W N cn ! 0 Co CD B 3 3 3 3 3 3 3 co rn 3 a x rD CD (D li cn CD U) CD 0 (D -01 w 0) m 0 cm m fC EL co < CL 0 Z CL 0 CD 0 ro 0 CD C_ 0 an 4� 3 co w z z ca m m m m 0 ----------------- (D w cn to (n co cn ------------ 0 0 co to cn -4 (n psi 0 " N 0 0000 0 to 000 0 0 0 0 0 -r En C3) ca w0 pl 0 0000 000 0 ---------- io - u> J) , A V " .� 0) cn oo oo CD 0 oo 0 to 14 M 0 p M-4 ul -� V 0 0 p p p 0 NNNO 0 0 0 � 0 0 0 M 0 0 (o 6 C) ' 000 000 Ol 0 10 0 . 0 0 000 POO co (n (a It. 0 0 000 L.A U. 4A �6 0) m to) (D t 4- -4 - 4 En 4 V) E05 4� Ij tJ (=, C) C) 0 CD C. C) 0 CD 0 W 'A 4 CD C� 0 Q -- — — — 0 — — C� — C> — P — — — 0 — — C. co ' 4 ' 1 ' C O D C) C� — CD —1— 0. C) — — — — — — — — — EA V . l.A 0 A J 14 .A. E En Z> r> C. C8, -0 Li—t us CD CD i 9 ED 0 0 O 0 css 3 4�. -4 CD 0 Do CD 1 CD < 3 0 O 101 0 to 0 3 a, 0 o 01 7 � Z- •P' Ca to 00>>>>CwcO *Cnu)nmnr)u) no ow<cn-w5w!�- ;:7 CD 0 0 '0 CL C- a D- Z) CD :1 : :7 LID CD ID C 3 C 0) =;, E� 0- ED CD :u :0 m C C 1 m 1 an 5 07 - U) - cn + +-< + o -r, z 70 i o m w w m -a- m (n U) c - 0 0 0) c n co R- Z; 0 0 (D 0 0 0 CO to 0 D V 0 0 0 M 0 M 0 0 C G) M CO Ca 0'. 0 :E m 0 DU 0 = - . F D) en E 3 3 o 5 + m c D CL CO 0 - CD 0 - m CD to 0 LO m z LD ( b < M — CD — = z :2� < :13 0 0 - E7 0 - &- 0 :3 :3 x co 0 co ca -- - P, — oI W 0 . ;� Ch 0 :3 - 0 (D cl) 0 - (D 0 CD - CD N zi 0) Er :Z m :r P - CD 0 z m 3 w 3 0 U3 0 U) --3 i U) CD Ch F), cn —::r — CD to co z 0 1 0 + + 0 0 0 0 0 Lb 0 0 L U) CD Ol C' (n m ::r 0 0 0 r- CD CD + m 03 + rl m co 0 0 G) a) + 0 N 0 0 0 :3 ca n 0 * a; 0 0 CA 0 + U) 0 (n n CO -n (n U) m cri in CD 3 I ICD 00 N CD 4h , 00, (D LA 0 0 cts CD m 2 n U) (D rn (D P- V> — v. — w CD -4 (0 -(a LTI 1 4 -U> 0 ul 00 (D (D CD N 01 Ul 44 w A rn Iv u Cn 3 00 r�) w Z 0 1 0 Zi ;�Iz zi m 0) CD 0) -p- CD Z 0' W W > 0 0 0 > CF) 0 > co 0 CD CD — 00 > co -v -w, i> -co CA CO A> (D 00 C) co V (0 N 0 LTJ 00 Oo to m 0 0 0 CY) -P w 3 m aD 10 " w 0 a) 0 cr) w 0, C4 CD 1l 00 1 C;) IN I 0) 0 LO 0 co CD — CTS co 00 yr tv m x 00 In > CST (A cn -r- En 'o Ln C, 0 L. V) a L,) W fA fq w cm U) ;D. g -4 Cl C7 vD -.4 10 �f --4 CD L, �4 , C) VA 5> p p p ' O 00 N U) C. C] t) ON In 00 00 .1 C> I C=> dj 0 :D Ln uq U5 tn P19 V) O CJ O P 'Z/3 p tA p Ln b9 f (6 (A (A CD CD d Cl d 011 d O Z) C) C, 00 CD p Cp C> p 8 1 '8, 1 CD 0 Do CD 1 CD < 3 0 O 101 0 to 0 3 a, 0 U? tD w n w .C CD o 77 Co w O N m C to w Q z v 0 N� W� 4d n r� mp ; cna x Urfa n m o5 ;, 4 3 3 3 CL 0) — 0 ° a m- g v w o ; ^ w C, asa H m va V, w en n o i E {, p ' 0 — s + I - 0 , w f +C: ep O O m O m W � `C o s r c o b �� O q X C7 ~ 7 x ,� CD CD � e9 O z w � of 0 ffl CD 0 T d � Ci :3 7 w O � c I iA =. _ ,.,� �� 7 w {a} I ry V W w w _:. l7 `.•� ... 'CD N r.f CD y o w CD w d w o m cn fh i CD n zr =r crr CL a c o CD c15 — Cys to C CfS •+ a•• ^n 0 tl 3 L w n _ rxt C7 J W Cs yr CD m w J � V •J W N O N R D' z D a 7 q . o 0 C W w a U) N ^mot r l cn w 0 r !C ao �+ 0 > 0 LO a O N N T R _ iC N W d O a U? tD w n w .C CD o 77 Co w O N m C to w Q z v 0 N� W� 4d n �acan C4 Ln � C w a C a rl rl r �Oommmm�ll < z z I CS C ' w O t T tj 0, C, C? -4 w 'o o 0 c, CDI -3 4- l.A 0 0 C) t,,) > 3: 0 o Z c z we kB CD II N i7 CD 0 , N 0 CD < 3 W O ■•' m 3 W- ck� .M�k-lll uj CP -j cA -4 0o is ..n c>cs00 0 © N p In - iA 'tj Vs Vr LA co Im �o 00 �2 'D p �11 hj p tA 9 . w LA !+ �c CD C, C, W 0 K� LA 0 C: 0 cc CS C ' w O t T tj 0, C, C? -4 w 'o o 0 c, CDI -3 4- l.A 0 0 C) t,,) > 3: 0 o Z c z we kB CD II N i7 CD 0 , N 0 CD < 3 W O ■•' m 3 W- ck� .M�k-lll uj October 9, 1996 Project No. 4M229.128 Mr. Rick Hixson City of Bozeman P.O. Box 640 Bozeman, MT 59771 RE: Bozeman Water Repair and Renovation Dear Rick, I I 'dMM& Wft WINVEN&L 141(111 E n C1 I n cp4a r I r Cj Johnston Excavating submitted letters of additional work on September 2, and September 28, 1996, The following is our recommendations regarding these requests: Item #1 - Recommend Approval. We are in agreement with the quantity and recommend payment. Payment covered Linder Change Order No. 1. Item #2 - Recommend Approval. This item is for the repair of an existing sewer main which was crossed at the intersection of Wallace and Cottonwood. The leak was not caused by the contractor, but was pre-existing. We are in agreement with time and materials used, and recommend payment. Item 93 - Recommend Denial. This item is for additional fitting required for the water main interconnection at the intersection of Wallace and Cottonwood. The contractor was unable to ready-rod the 90' ell to both the valve and tee without the addition of Mega followers. We recommend against payment for this item as an extra. The contractor and his material supplier should have foreseen this problem and had materials on-hand to complete the assembly, Item #4 - Recommend Approval, This item was for the installation of a fire hydrant riser. The riser was required because of greater main depth to pass beneath an existing sewer service. We recommend payment for this item. October 9, 1996 Mr. Rick Ilixson Page 2 Item #5 - Recommend Approval. This item was for the replacement of an existing 6" gate valve. The valve was found to be "bad" at testing of the main. The valve had to be excavated and installed in line. We recommend payment for this item, Items #6 & #7 - Recommend Approval. These items are for replacement of existing curb stops found to be "bad". Recommend payment for this item. Item 98 - Recommend Partial Approval. This item is for the insulation of shallow main. In making connection to existing main at intersection of Church & Peach Streets, it was found that the existing main had inadequate cover, requiring insulation over the new main until proper cover Could be provided, We recommend payment for the 84 LF of insulation. Tile other items are covered by the base bid and Change Order No. 1. Item #9 - Recommend Approval. This item is for additional crew and equipment time at the Garfield and 4th Street connection, The existing pipe and valve configuration was substantially different than shown on plans. We recommend payment for this item. Item #10 - Recommend Denial. This item is for the repair of a sewer service that was 2' higher than shown on the plans. We recommend against payment for this item.. Our recommendation is based on the fact that the service was pre- marked correctly and the contractor should have been more prudent in excavating in the vicinity of the service. Item 41 - Recommend P art i al Approval. Existing service at Station 7 was I" verses typical 3/4" service, Recommend partial payment for labor costs. The 376.09 is not justified because other work could continue, October 9, 1996 Mr. Rick flixson Page 3 Item #12 - Recommend � pproval. Existing sewer service was incorrectly pre-marked at Station 5+60. Recommend payment for this item. Item #13 - The item covered by Change Order No, 1. Item #14 - Recommend Approval, Two existing sewer services and one water service at Station 4+45 was incorrectly pre-marked. Required repair of water service. Recommend payment of item. Item #15 - This item covered by Change Order No. 1. Item 916 - Recommend Approval. Existing sewer service incorrectly pre-i Required repair of existing sewer service. Recommend payment of this item, Item #17 - This item covered by Change Order No. 1. Items #18 & 419 - Recommend Approval. City Road Department requested additional gravel be placed to provide positive drainage. It was agreed that this gravel was beyond the pre-construction condition of the streets. Recommend payment of this item. Items #20, #21, & #22 - These items covered under Change Order No, 1. Item #23 - Recommend partial Approval. This item is for additional thickness of Valley Gutter Concrete, Recommend payment for additional material only. October 9, 1996 Mr. Rick Hixson Page 4 Items #24 & #25 - Recommend Approval. These items for repair of corps not shown on plans or pre- marked. Recommend payment of these items. Attached Exhibit "A" is a summary of costs for each of these items. Upon your review and approval, we will proceed with the drafting of Change Order No, 2 to address these items. As an option, you may wish to hold off on the change order and incorporate these changes into the final change order which closes out the quantities. Please let me know how you wish to proceed, Sincerely, MSE-HK► Engineering J 7" Clint Litle, P.E. Project Manager Attachment 61009LA6.DGC EXHIBIT "A" 1994 Bozeman Water Renovation LJLA o y �l V�011 l 2 Sewer Repair on Cottonwood Ste 6 +50 3 Additional Mega -lugs on Cottonwood Sta 7 +29 4 Eire Hydrant Riser on Cottonwood Sta 6 +83 5 Valve Installation on North Church Sta 3 +60 6 Curb Stop Replacement on Cottonwood Sta 9 +16 7 Curb Stop Replacement on Cottonwood Sta 10 +52 8 Pape I ns ulati on on North Church Sta 3 +60 9 Changed Condition at Intersection Garfield and 4th 10 Sewer Repair 11 Corp Exchange on 4th Sta 7 +93 (based on 1 man and 1 truck) 12 Sewer Repair on 4th Sta 5 +60 13 Short Water Service 14 Water & Sewer Service Repair on 4th Sta 4 +45 15 Unsuitable Backfll C.O. No. 1 C.C. ##1 L.S. $ 596.98 1 $ 596.98 L.S. $ 492.45 1 $ 492,45 L.S. $ 3,186.61 1 $ 3,186.61 L,S. $ 1,584.99 1 $ 1,584.99 L.S. $ 1,209.69 1 1,209.69 L.F $ 4.50 84 $ 378.00 Hr. $ 376.09 7 $ 2,632,63 Hr. $ 51,20 1 $ 51.20 L.S. $ 390.26 1 $ 390.26 L. S. $ 770.12 1 $ 770.12 Y u it Item # A I]escri tion d X191- . - - _— Unit Pr ice �_ Quantit , To LJLA o y �l V�011 l 2 Sewer Repair on Cottonwood Ste 6 +50 3 Additional Mega -lugs on Cottonwood Sta 7 +29 4 Eire Hydrant Riser on Cottonwood Sta 6 +83 5 Valve Installation on North Church Sta 3 +60 6 Curb Stop Replacement on Cottonwood Sta 9 +16 7 Curb Stop Replacement on Cottonwood Sta 10 +52 8 Pape I ns ulati on on North Church Sta 3 +60 9 Changed Condition at Intersection Garfield and 4th 10 Sewer Repair 11 Corp Exchange on 4th Sta 7 +93 (based on 1 man and 1 truck) 12 Sewer Repair on 4th Sta 5 +60 13 Short Water Service 14 Water & Sewer Service Repair on 4th Sta 4 +45 15 Unsuitable Backfll C.O. No. 1 C.C. ##1 L.S. $ 596.98 1 $ 596.98 L.S. $ 492.45 1 $ 492,45 L.S. $ 3,186.61 1 $ 3,186.61 L,S. $ 1,584.99 1 $ 1,584.99 L.S. $ 1,209.69 1 1,209.69 L.F $ 4.50 84 $ 378.00 Hr. $ 376.09 7 $ 2,632,63 Hr. $ 51,20 1 $ 51.20 L.S. $ 390.26 1 $ 390.26 L. S. $ 770.12 1 $ 770.12 EXHIBIT "A" 1994 Bozeman Water Renovation U nit Item Des� Unit '--- ��it � y r Unit �P�r�ice Quantit , �l �,.o n 16 Sewer Repair on 4th Sta 3+40 L.S. $ 390.26 1 $ 17 Unsuitable Backfill C.O. No. 1 18 Additional Gravel Base North Church 19 Additional Gravel Base Wallace 20 Additional Utility Crossings C.O. No, 21 Additional Utility Crossings C.O. No, 22 Additional Utility Crossings C.O. No, 23 Additional Concrete at Valley Gutters (Materials only) 24 Corp Replacement 25 Corp Replacement Total Recommended Extras C.Y. $ 15.00 C.Y. $ 15.00 C.Y. $ 80.50 40 $ 60 $ 1.26 $ L.S. $ 940.23 L.S. $ 611,87 Total 390.26 600,.00 900.00 101.43 $ 940,23 $ 611.87 $ 14,836.72 MSE-HKM, Inc. Re: Bozeman Renovation 20 E Olive Additional Work Bozeman, Mt 59715 Dear Clint, Listed below (by schedules) is the additional work we have encountered to date. Schedule 11 8 Ea Additional utilitie x-ings C.O. 411 T1 @376.09 3,008.72 Jon David Johnston, Pres. David H. Johnston, Vice-Prey. s0vaig M. Johnston, SOCITreas. 7-31-96 7-30-96 Repair 61 Sewer -9z l Hr 0-376.09 0-27.00 +15% +3- 6 LF 6 sewer +15i +3110/0/ 564.1-1 8.64 2 Ea 6 couplers 0-9. 24 +1.5% +3 z% 22.02 2 Gal Bleach 0-0.99 +15% +31,2% 2.36 Jon David Johnston, Pres. David H. Johnston, Vice-Prey. s0vaig M. Johnston, SOCITreas. 7-31-96 connect to tapping valve 2 sets Meg- a--lug followers 0-27.00 +15% +3- 64.35 1-2 Hr to Three Forks @,39.02 58.53 70 Miles Travel @0.35 24.50 147.38 8 -6-96 Hydrant Extention 1 Hr 2 men labor @39.02 1-17 18" Hydrant Extention @297.00 +15% +312% .06 353-94 18" Valve Box Extention. 0-18.00 +15% +32% 21.45 Schedule III 7-29-96 Replace leaking valve an North Church Letter 7-28-96 961--19 4' -- Z hr crew time C-376.09 - 1,692.40 11 2 1 6" Valve and Box @328.00 +15% +3- 390.88 10 I. 6" D.T. 0-5 .97 +15% +3-2% 71-15 12 LF poly eaO.20 +15% +3-�% 2.86 Jon David Johnston, Pres. David H. Johnston, Vice-Prey. s0vaig M. Johnston, SOCITreas. Jon David Johnston, Pres. David H. Johnston, VL- Solveig W Johnston, Sac/Trea4, 1 Ea 6" Sleeve T +15% +3z% 8-20-96 67.93 3,1.86.61 Garfield & 4th 8-7-96 Replace Curb Stop Crew 0376.09 2,632.63 & Box 4 Hr @376.09 1,504.36 1 Curb Stop & Box @52.00 15 + 2!i% 61.97 1 Coupler 08-8.16 +15% - +-3',,% 9.72 1 Coupler Tran-..; t- OA7.50 + 15 c,'.' + 24 0 -'� / /o 8.94 1,584.99 -1 3 Hr @376. 09 8-8-96 Replace Curb Stop & Box 1,128.27 I Curb Stop & Box @52 .00 +15% +3 61.97 2 Couplers @8.16 + + 3-2% 19. 1.20'9.69 10-09 SY Asphalt Replacement�l @22.50 227.03 84 LF insulation @4 378.00 63-12 Ton Pit Run @5.36 338-32 Schedule V 8-23-96 I Hour I" service had to go get bit and exchange corp 376.09 LOOMMILOU 1 Hr sewer marked wrong @376,09 3 5 LF 4,, 00. 65 15% + 3.87 2 Ea Couplers @4.32 +15% +3- 10.30 390.26 8-20-96 Changed Condition Garfield & 4th 7 Hr. Crew 0376.09 2,632.63 B-22-96 1 Hr Repair sewer (2 Higher than plans) @376.09 376.09: 2 2 Lf Ea 4" sewer 4" Couplers @0.65 +15% +3k% 1.55 @4.32 +15% +32% 10.30 387.9-1 8-23-96 I Hour I" service had to go get bit and exchange corp 376.09 LOOMMILOU 1 Hr sewer marked wrong @376,09 3 5 LF 4,, 00. 65 15% + 3.87 2 Ea Couplers @4.32 +15% +3- 10.30 390.26 Jon David Johnston, Pres. B-29-96 Ton Mud & Pit Run @12.04 C.Q. 11 1,495.73 8-30-96 David H. Johnston, Vic"res, 1 Sewer 5 LF 4 1, 2 Ea 4" service marked wrong @376.09 @0065 +15% Couplers 04.32 +15% +31% +3Q% Solveig M. Johnston, Sec/Tr 1 Ea Short Service 0440.00 C.O. #1 440.00 8-28-96 X '2 Extra sewer services 4d A> l Water Service marked not shown wrong 0376.09 752.18 5 LE copper 1 Ea Coupler @1.38 T8.16 +15% +15% +3k% +3q% 8.22 9.72 770.12 124.23 B-29-96 Ton Mud & Pit Run @12.04 C.Q. 11 1,495.73 8-30-96 1 Sewer 5 LF 4 1, 2 Ea 4" service marked wrong @376.09 @0065 +15% Couplers 04.32 +15% +31% +3Q% 376.09 3.87 10.30 390.26 8-31-96 A W-1 282.40 Ton Mud & Pit Run @12.04 3,400.10 QI tW - 9 -LA-- Dave Johns fon September 29, 1996 9-24-96 1:5 A MSE-HKM, Inc. Re: Bozeman Renovation 20 E olive Additional I-,Tork corps Bozeman, Mt 59715 564 1 1 Corp 015.50 Dear Clint, +32% 18.45 2 Listed below (by schedules) is the additional work we 19-42 have encountered to date. +15 (" +3-1,% 9.86 4 0 CY 1. gravel (P15-00 C-R- North Church 600.00 Schedule IT L e4e 9(o'linston Cis Dave , 6 CY 1" gravel @15-00 e-hTallace & Cottoniiood 900.00 Schedule V 9-3-96 Extra Sewer. service 1 Hr @376.09 376.09 9-4-96 4 Additional Utl Xings @376.09 1,504.36 9-5-96 2 Additional Utl X-ings 0376.09 752.18 204-38 SF Valley Gutter 8 Deep Bid $7.00 for 6 9.33 1,906.87 Schedule IV 42* 2'- flour 0376.09 hit corp not shown 940.23 Schedule I 9-24-96 1:5 A 1 fir e376-09 hit 2 corps not shown 564 1 1 Corp 015.50 +15% +32% 18.45 2 Couplers 08 .16 4-15% -t3�% 19-42 6 LT: copper 01.38 +15 (" +3-1,% 9.86 611.87 L e4e 9(o'linston Dave , Jon David Johnston, Pres. David H, Johnston, Vlce-Prm SON09 M. Johnston, Sec/Treas. December 23, 1996 Project No. 4M229.128 Mr. Rick IIixson City of Bozeman P,O. Box 640 Bozeman, MT 59771 RE: Bozeman Water Repair and Renovation Dear Rick IN% I N Johnston Excavating submitted a letter of additional work on October 25, 1996. The following is our recommendations regarding these requests: Item #26 - Recommend Approval. This item is for the installation of an 18" cap for the pressure testing of the existing 18" main between Station 9+40 to 9+55 on Schedule I. This was requested by the City. Item #27 - Covered under Item #115 of base bid. Item 928 - Covered under Item 9132 of Change Order #1. Item #29 - Covered under Items #115 and ##132 of base bid and Change Order #1, respectively, Item #30 - Recommend Approval. This item is for time spent testing pressure testing the existing 18" main Station 9+40 to 9 +55, as requested by City. Item #31 - Recommend Approval. This item is for the installation of a cap for the testing of the new 18" main on Schedule I. This was required because existing main from Station 9+40 to 9+55 would not pressure test. Other Offices: Billings, MT (406) 6566 Butte, MT (405) 723-8213 Butte Laboratory (405) 494-1502 Helena, MT (406) 443-7335 Miles QY, MT (405) 232 66 Sheridan, WY (307) 672-9006 December 23, 1996 Mr. Rick I Page 2 Item #32, #33 - Recommend Approval, These items are for the additional connection and notification requirements caused by the failure of the existing 18" main from Station 9+40 to 9+55, Schedule I, to pressure test_ Upon your review and approval, these will be included within Change Order No. 2. If you have any questions, please feel free to contact our office, Sincerely, MSE-HKM Engineering Clint Litle, P.E. Project Manager Attachment--Johnston letter dated 10/25/96 61203r A&DOC r A Jon David Johnston, Pres, October 25, 1996 David H. Johnston, Vice -Pres. Solveig M. Johnston, SectTre MSE-HKM, Inc. Re: Bozeman Renovation 20 E olive Additional Work Bozeman, Mt 59715 Dear Clint, Listed below (by schedules) is the additional work we have done to date. 752.18 314.23 165.00 376.09 376.09 110.00 312.16 376.09 11-53 39-02 1316.32 11A Dave Oohnston Schedule T 9-24-96 4 04. 2 Hr install 18" cap to test @376.09 18" cap @264-00 +15% +31% 9-26-96 11 Hr Exploratory @110.00 io-3-96 water X-ing not shown @376.09 10-j-96 2-9 Abandone water line 1 hr @376.09 1 Hr exploratory @110.00 10-&96 Vic' 8 Hr testing existing 7 line e39.02 - 10-096 Extra tap to bleed air 1 hr @376.09 cc plug @9.69 +15% +3t% 10-14-96 X 1 Hr notify for shut off (139-02 10-15-96 18" connection 31 Hr @376.09 752.18 314.23 165.00 376.09 376.09 110.00 312.16 376.09 11-53 39-02 1316.32 11A Dave Oohnston