COMMISSION RESOLUTION NO. 3508
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH
BIG X, INC., BOZEMAN, MONTANA.
WHEREAS, the City Commission did, on the 7th day of May 2001, authorize award of the
bid for the Burrup lift Station Improvements project to Big X, Inc., Bozeman, Montana;
and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such
alterations or modifications of the specifications and/or plans of the contract
be made by resolution;
and
WHEREAS, it has become necessary in the prosecution of the work to make alterations
or modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and/or alterations to the contract between
the City of
Bozeman, a municipal corporation, and Big X, Inc., as contained in Change Order
No.1, attached
hereto, be and the same are hereby approved; and the City Manager is hereby authorized
and
directed to execute the contract change order for and on behalf of the City; and
the Clerk of the
Commission is authorized and directed to attest such signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at
a regular session thereof held on the 11 th day of February 2002.
ATTEST:
ST4'R.K1~
~sfu~
Clerk of the Commission
-...-.-.------
_n_.."....._____._
CHANGE ORDER
No.
DATE OF ISSUANCE January 3.2002
EFFECTIVE DATE September 18. 2001
OWNER
City of Bozeman
CONTRACTOR
Big X. Inc.
Contract:
BuITUP Lift Station Improvements
Project: BuITUP Lift Station Improvements
OWNER's Contract No.
N/A
ENGINEER's Contract No.
0417.031
ENGINEER Morrison-Maierle, Inc.
You are directed to make the following changes in the Contract Documents:
Description:
Add I/O card to PLC to wire priming pumps, and rewire existing hand circuit to new PLC.
Reason for Change Order:
Rewire hand circuit to new PLC so that the PLC handles the logic and wire priming pumps
to PLC.
Attachments: (List documents supporting change)
I
CHANGE IN CONTRACT PRICE:
I I CHANGE IN CONTRACT
TIMES: I
Original Contract Price
Original Contract Times:
Substantial Completion: 45
$ 59.800.00
Ready for final payment:
45
(days or dates)
Net Increase (Decrease) from previous Change Orders
Net change from previous Change Orders No. _ to
No.
to
No.
-
Substantial CompJetion:
0
$ 0.00
Ready for final payment:
0
(days)
Contract Price prior to this Change Order:
Contract Times prior
to this Change Order:
Substantial Completion: 0
$ 59.800.00
Ready for final payment:
0
(days or dates)
Net increase (decrease) of this Change Order:
Net increase (decrease)
this Change Order:
Substantial Completion: 45
$
5.093.47
Ready for final
payment: 45
(days)
Contract Price with all approved Change Orders:
Contract
Times with all approved Change Orders:
Substantial Completion: 45
$ 64.893.47
Ready for final payment:
45
(days or dates)
APPROVED:
By:
BY;c~~=~~--~--~-
EN
OWNER (Authorized Signature)
Date:
I-I.~~OL
Date: Fp.brui'lry 11,
2002
EJCDC 1910-8-8 (1996 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The
Associated General Contractors of America and the Construction Specitieations
In>tinJte.