Loading...
HomeMy WebLinkAboutResolution 3508, Authorize CIty Manager to sign Change Order 1, Burrup Lift Station COMMISSION RESOLUTION NO. 3508 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BIG X, INC., BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 7th day of May 2001, authorize award of the bid for the Burrup lift Station Improvements project to Big X, Inc., Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Big X, Inc., as contained in Change Order No.1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 11 th day of February 2002. ATTEST: ST4'R.K1~ ~sfu~ Clerk of the Commission -...-.-.------ _n_.."....._____._ CHANGE ORDER No. DATE OF ISSUANCE January 3.2002 EFFECTIVE DATE September 18. 2001 OWNER City of Bozeman CONTRACTOR Big X. Inc. Contract: BuITUP Lift Station Improvements Project: BuITUP Lift Station Improvements OWNER's Contract No. N/A ENGINEER's Contract No. 0417.031 ENGINEER Morrison-Maierle, Inc. You are directed to make the following changes in the Contract Documents: Description: Add I/O card to PLC to wire priming pumps, and rewire existing hand circuit to new PLC. Reason for Change Order: Rewire hand circuit to new PLC so that the PLC handles the logic and wire priming pumps to PLC. Attachments: (List documents supporting change) I CHANGE IN CONTRACT PRICE: I I CHANGE IN CONTRACT TIMES: I Original Contract Price Original Contract Times: Substantial Completion: 45 $ 59.800.00 Ready for final payment: 45 (days or dates) Net Increase (Decrease) from previous Change Orders Net change from previous Change Orders No. _ to No. to No. - Substantial CompJetion: 0 $ 0.00 Ready for final payment: 0 (days) Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: 0 $ 59.800.00 Ready for final payment: 0 (days or dates) Net increase (decrease) of this Change Order: Net increase (decrease) this Change Order: Substantial Completion: 45 $ 5.093.47 Ready for final payment: 45 (days) Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion: 45 $ 64.893.47 Ready for final payment: 45 (days or dates) APPROVED: By: BY;c~~=~~--~--~- EN OWNER (Authorized Signature) Date: I-I.~~OL Date: Fp.brui'lry 11, 2002 EJCDC 1910-8-8 (1996 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specitieations In>tinJte.