Loading...
HomeMy WebLinkAboutResolution 4309 Change Order 7 for WRFCO. COMMISSION RESOLUTION NO. 4309 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH WILLIAMS BROTHER CONSTRUCTION, LLC., BILLINGS, MONTANA. WHEREAS, the City Commission did, on the I Oth day of November 2008, authorize award of the bid for the Bozeman Water Reclamation Facility Phase I Improvements project, to Williams Brother Construction, LLC., Billings, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Williams Brother Construction, LLC., as contained in Change Order No. 7, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 1 of 2 Rcsohaifm 4 309, ()jylet °'1or- PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 31 st day of January 2011, ATTEST,:,: - ` ' C _" o v « ., x* Cat, +Clez�k,� 2 of 2 APPROVED AS N' =1 = - M, REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer ep Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: Bozeman Water Reclamation Facility, Phase I Improvements — Change Order No, 7. MEETING DATE: January 3l,2011 AGENDA ITEM TYPE: Consent. RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign Bozeman Water Reclamation Facility, Phase I Improvements — Change Order No. 7. BACKGROUND: Attached is a copy of change order number 7 for the above referenced project. This change order includes nineteen items. Two of the items are credits while the other seventeen are additions. Pages three through five of the attached document titled "Change Order No. 7 Summary" provides a short description of each of the items involved with this change. Additionally, the remainder of the document contains the detailed backup cost information for each item. No change in contract time is being provided with this change. The Substantial and Final Completion Contract Times are not changed. The final recommended decrease in cost and time extension for this change is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission, FISCAL EFFECTS: Overall this change order increases the contract amount by $105,151.00 from $36,450,814.90 to $36,555,965.90. This will decrease the contingency on the project from $1,791,962.99 to $1,686,811.99. Attachments: Change Order No. 7 Resolution 4309 Report compiled on: January 13, 2011 to�tusarr CHANGE ORDER tr'�t�Rs.,x Nn, DATE OF ISSUANCE Janua 3 2011 EFFECTIVE DATE OWNER _ City of Bozeman _ _ CONTRACTOR Williams Brother Construction LLC Contract: Bozeman WRF Phase 1 Improvements Project: Bozeman Water Reclamation Facility OWNER °s Contract No. SRF 0303105 -01 ENGINEER HDRfMMI ENGINEER °s Contract No. 00..60746 You are directed to make the following changes in the Contract Documents: Description: Implement numerous changes as described in the Change Order No. 7 Summary. Reason for Change Order: Minor modifications to contract work. Attachments: Change Order No. 7 Summary with referenced attachments. CHANGE IN CONTRACT PRICE: Original Contract Price $ 36 362 233.00 Net Increase (Decrease) from previous Change Orders No. 0 to 6 $ 88,581.40 Contract Price prior to this Change Order: $ 36 450 814.40 Net increase (decrease) of this Change Order: $ 105 151.00 Contract Price with all approved Change Orders: $ 36,555, 465.90 CHANGE IN CONTRACT TIMES: Original Contract Times: Substantial Completion: October 5, 2011 Ready for final payment: January 8, 2012 (d2 Xs or dates Net change from previous Change Orders No. 0 to No. 6 Substantial Completion: 0 Ready for final payment: 0 da s Contract Times prior to this Change Order: Substantial Completion: October 5 2011 Ready for final payment: January 8, 2012 ( days or dates Net increase (decrease) this Change Order: Substantial Completion: 0 Ready for final payment: 0 (days) Contract Times with all approved Change Orders: Substantial Completion: October 5 2011 Ready for final payment.. January 8, 2012 (days or dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed -upon herein represents th cost and value for the subject work performed and the materials supplied under the terms of the contract a at e ork quantities and value were properly determined and are correct. ex ✓r ✓fit TOR (Aut iorized Signature) Date RECOMMENDED BY: APPROVED B �EER - Sig Date OWNS w � gn ) R (Authorized Signature) Date EJCDC 1910 -8 -B (1996 Edition Prepared by the Engineers Joint Contract Documents Committee and endorsed by The associated General Contractors of America and the Construction Specifications Institute.