HomeMy WebLinkAbout05- Stiff Building 2nd floor remodel, change order 4 with R & R Taylor"uu 8 AIA Change Order f 11WEK:T (Name and address): Stiff Building Second Floor Remodel 20 East Olive Street Bozeman, MT 59715 TO CONTRACTOR (Name and address) CHANGE ORDER NUMBER: 4 DATE: July 15, 2005 ARCHITECT'S PROJECT NUMBER:. SBR GINNER: C ARCHITECT; [] CONTRACTOR: El R &R Taylor Construction. Inc. CONTRACT BATE: March 1.0, 2005 FIELD: EJ P.O. Box 1234 CONTRACT FOR: General Construction OTHER: El Bozeman, MT 59771 -1234 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed (Construction Change Directives) 1. Due to unexpected ceiling height alterations and adjustments an additional 25 SSP and SSU style sprinkler heads were used over the estimated total of 20. Add $1,621.50 2. 17th coil (not on drawings) circuit setter, valves, etc. intalled, Western. Add $32735 The original. Contract Sum was $ 168,481.00 The net change by previously authorized Change Orders $ 16,099.35 The Contract Sum prior to this Change Order was $ 184,580.35 The Contract Sum will be increased by this Change Order in the amount of $ 1,949.25 The new Contract Sum including this Change Order will be $ 186,529.60 The Contract Time will be increased by Zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: q44is C- NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER Pru h & !tenon Architects, P.C. R &1t Ta for Construction Inc. Cit y of Bozeman ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) P.O. Box 1.234, Bozeman, MT 59771- R O, Box 1230, Bozeman, Montana 27 East Main St, Bozeman, MT 59715 1234 59771 - 1230 ADDRESS A S BY (Signa 'ire,) Y mature ( "b> tare) HY Sr na Corey Johnson Russell Olsen Fe-av ng: Chri A» Ku k l S k l (Typed name) (Typed name) (Typed name) August 1, 2005 DATE DATE DATE AIA Document G701 rm — 2001. Copyright @1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved, 1 FARNi HGW t "his MA Document is protected by us opyripbl 1.avu and inlernaarnnurl "T reaties, dnaaulhodzed reprru°oduueflon or dl sta pbuuttarn of tats A�e Document, or any poudGon of it, may resWt ror severe d vit and a virninap denafties, mid YOH be prosecuted to lfus maxummurn extent pa- ossibW iunder the low, This document was produced by AIA software at 15:06:01 on 07/15/2005 under Order No.1000141663_i which expires on 10/15/2005, and is not for resale. User Notes: (840159580) Date: JULY], 2005 a aral i / 01 • I Loll VS 0 To: Prugh And Lenon Architects PC 27 East Main Street Bozeman, MT 59715 CH,4NGE ORDER # 5 Date JULY 1, 2005 Phone 406-587-4451 Job Name/Location: Stiff Building 20 East Olive,Bozenian, MT Job Number 0513-000 Job Phone Date Of Existing Contract MARCH 10, 2005 We hereby_agnee to make the change(s) s Pecified below: Due To Unexpected Ceiling Height Alterations and Adjustments An Additional 25 SSP & SSU Style Sprfiikler Heads Were Used Over The Estimated Total Of 20, $1,621.50 17 ` Coil (Not On Drawn s Circuit Setter, Valves, Etc. Installed – Western $ 3 Please sign and return one copy to our office immediately, NOTE: This Change Order Becomes Part Of And In Conformance With The Existing Contract. WE AGREE hereby to make the change(s) specified at this price => Date — July 1-2005 Previous Contract Amount Revised Contract Total RX R Taylor Construction, Inc, $ 1,949,25 $185,352.60 5187,301.85 ACCEPTED – The above prices and specifications Of this Change Order are satisfactory and hereby Accepted. All work to be preformed under same Terms and conditions as specified in original Contract unless otherwise stipulated. Date of acceptance Signature (owner) 13 South Willson Ave., Suite 1 , P.0,Box 1234 - Bozeman, MT 597 71 -1 234 - Ph; 406-587.4451 Fax: 406-586-7508