HomeMy WebLinkAbout05- Stiff Building 2nd floor remodel Notice to Proceed with R & R TaylorStiff Building 2" Floor Remodel
Bozeman, Montana
City ofBozeman
Bozeman, Montana 59715
NOTICE TO PROCEED
To: R&R Taylor Construction, Inc.
P.O. Box 1234
Bozeman, MT 59771-1234
ProjecL Stiff Building 2 m Floor Remodel
2Q East Olive Street
Bozeman, MT 59715
Dated: March 1.6, 2005
Contract for Base Bid of One Hundred Sj?��-eight Thousand, Four Hundred Eighty-one Dollars
You are notified that the Contract Times under the above contract will commence Lo run on
March 16, 2005, Bv that date, you are to start performing your obligations under the Contract Documents.
In accordance with the Agreement, the Date of Completion is JuIV 13, 2005 which is One Hundred
Twenty (120) consecutive days after the date of this Notice to Proceed,
As compensation for non'uoe, the Contractor shall bn assessed liquidated damegeaof Five Hundred and
no/1 00 Dollars.f$500) per calendar day for each day that the work remains uncompleted beyond the Date
of Completion, plus other liquidated damages in accordance with the Contract Documents,
Ci!y of Bozeman
Owner
By: C9� k' X"�i
City Manager
Title
ACCEPTANCE OF AWARD
Title
��,
Copy to Architect
Date: April 6, 2005
mlffl
FM R TAY OOr
CONSTRUCTION INC. Change Order # ll?evision
JAMES GOEHRUNG
SUPERINTENDENT OF FACILI'T'IES AND LANDS
411 EAST MAIN STREET
P.O. BOX 1230
BOZEMAN, MT 59771 -1230
Date
April 6, 2005
Phone
406- 587 -4451
Job Name /Location: Stiff Building
20 East Olive,Bozeman, MT
Job Number
0513 -000
Job Phone
Date Of Existing
Contract
MARCH 10, 2005
We hereby agree to make the chap e(s) specified below.
To Alternate Office Work Area and Reception Counter As Per Our Discussion With Chris Saunders ,James
Goehrun and Floor Plan Provided By The City Of Bozeman,
Includes: Electrical
Rough In Boxes For Phone and Data
Add Two Maple Frame With Glass Windows As Per Chris Saunders Request
Please sign and return one copy to our office immediately.
NOTE: This Change Order Becomes Part Of And In Conformance With The Existing Contract,
WE AGREE hereby to make the change(s) specified at this price =:>
Date
R & R Taylor Construction, Inc,
Previous Contract Amount
Revised Contract Total
$ 8,508.00
$ 168,481.00
$ 176,989.00
ACCEPTED — The above prices and specifications
Of this Change Order are satisfactory and hereby
Accepted. All work to be preformed under same
Terms and conditions as specified in original
Contract unless otherwise stipulated..
Date of acceptance HaY 2 ,, 2-012 5
Signatur
(owner)
13 South Willson Ave., Suite 1 - P.O.Box 12.34 Bozeman, MT 59771.1234 Ph: 406- 587 -4451 Fax: 406- 586 -7808
Date: April 26, 2005
M E M111 M M
R&R, I , L "
CONSTRUCTION INC,
To:
Prugh And Lenon Architects PC
27 East Main Street
Bozeman, MT 59715
Change Order # 2 Revised
Date
April 12, 2005
Phone
406- 587 -4451
Job NameJLocatiom Stiff Building
20 East Olivc,Bozeman, MT
Job Number
0513- 000
Job Phone
Replace Old Flex To Existing Defusers
Date Of Existing
Contract
MARCH 10, 2005
We hereby agree to make the change(s) specified below:
Replace Damaged Sheetrock From Glued On T & G Paneling
$ 908.50
Frame and Shectrock Approximately 80 Feet Of Wall To Roof Structure
$ 853,30
Replace Old Flex To Existing Defusers
$ 5,373.60
Add Sound Insulation and Sound Board A roximatel 800 S Ft
$ 782,00
Install Owner Supplied Carpet With Direct Glue Application In Lease Able Space Exce t
Adjacent Room North Of Stairs, Patchcraft Splash Carpet Color Ripple Installed In All Other
Areas As Per Finish Schedule, Armstron Conricction Corlon Installed Over Existing Cement
Board In Both Restrooms With Slight Slope To Accommodate New Floor Drains
$ 5,737.20
Add Two Receptacles For The Phone System And The Controls Contractor As Dedicated Circuts)$ 550.00
Remove & Reinstall 16 Coils (City Of Bozeman Will Pick Up, Clean And Deliver Back To Job Site
$ 2,016.00
Add Phone and Data Receptacles At New Reception Area
$ 420,00
Please sign and return one copy to our office immediately.
NOTE: This Change Order Becomes Part Of And In Conformance With The Existing Contract.
WE AGREE hereby to make the change(s) specified at this price =7>
Date April 26, 2005 Previous Contract Amount
Revised Contract Total
R & R Taylor Construction, Inc.
$ 16,640.60
$ 176,989.00
S 193,629.60
ACCEPTED — The above prices and specifications
Of this Change Order are satisfactory and hereby
Accepted. All work to be preformed under same
Terms and conditions as specified in original
Contract unless otherwise stipulated.
Date of acceptance Ma y es, 2QQ5
Signature
(owner)
13 South Willson Ave Suit. 1 P,O Box 1234 Bozemon, MT 59771 -1234 . Ph: 406- 587 -4451 Pax: 406 -586 -7508
Date: May S, 2005
I M M M M Ell//
R l , vl° L R
CONSTPUCTION INC.
1
Prugh And Lenon Architects PC
27 :East Main Street
Bozeman, MT 59715
CHANGE ORDER # 3
Date
May 4, 2005
Phone
406 - 587 -4451
Job Name /Location: Stiff Building
20 East Olive,Bozeman, MT
Job Number
0513 -000
Job Phone
672.00
Date Of ]Existing
Contract
MARCH 10, 2005
We hereby agree to make the change(s) specified below:
Install Owner Su lied Window In Office Room # 217
$
672.00
Remove, Patch and Repair Toilet In Women's Restroom
$
360.00
Relocate Roof Leader
$
144.00
Material and Labor For Work Performed On Keating Coil (Not Shown In Mechanical Drawings)
$
468.00
Credit For Controls That Were In R & R Taylor's Bid
- $10,800.00
Options:
New Privacy Lock Hardware At Doors 6 and 7
$
300.00
To Add New Doors With New Hardware (6 and 7)
$
561.00
Please sign and return one copy to our office immediately.
NOTE: This Change Order Becomes Part Of And In Conformance With The Existing Contract,
WE AGREE hereby to make the change(s) specified at this price
Date May 4 , 2005 Previous Contract Amount
Revised Contract Total
R & R Taylor Construction, Inc.
$ - 9,156.00
$193,629.60
$184,473.60
ACCEPTED — The above prices and specifications
Of this Change Order are satisfactory and hereby
Accepted. All work to be preformed under same
Terms and conditions as specified in original
Contract unless otherwise stipulated.
Date of acceptancc OU1 y 5 , '2005
Signature -C"
(Owvner)
13 South Willson Ave., Suite 1 P, 0, 1234 Bozeman, mT 59771 -1234 Ph: 406 -587 -4451 Fax: 4.06- 586 -7508
Date: June 10, 2005
Hil 111M)IMMEN
R, & R TA' Y'l DR
CONSTPUCTION INC,,
M
Prugh And Lenon Architects PC
27 East Main Street
Bozeman, MT 59715
CHANGE ORDER # 4
Date
June 10, 2005
Phone
406-587-4451
Job Name/Location: Stiff Building
20 East Olive,Bozeman, MT
Job Number
0513-000
Job Phone
561.00
Date Of Existing
Contract
MARCH 10, 2005
We hereby a ree to make the thanes sccified below.
To Add New Door Option Was Noted But Not Added To Change Order # 3
S
561.00
Change 4" Base To 6" Base
$
370.00
Add 4 Data Ports
$-
216,00
Add Water For Ice Maker
$
156,00
Credit For Damaged Sheetrock
<$
454,00>
Please sign and return . one copy to our office immediately.
NOTE: This Change Order Becomes Part Of And In Conformance With The Existing Contract.
WE AGREE hereby to make the change(s) specified at this price =:>
Date — June 10, 2005 Previous Contract Amount
Revised Contract Total
R7& R Taylor Construction, Inc.
$ 879.00
$184,473,60
$185,352.50
ACCEPTED – The above prices and specifications
Of this Change Order are satisfactory and hereby
Accepted. All work to be preformed under same
Tern and conditions as specified in original
Contract unless otherwise stipulated.
Date of acceptance J U 1 5 2005
j -, —
Signature
(owner)
13 South Willson Ave., Suife. I - P,O,Box 1234 Bozeman, MT 59771-1234 Ph: 406-587-4451 - Fax: 406-586-7508