HomeMy WebLinkAbout06- Wastewater treatment plant maint. building, Change order #1CHANGE ORDER No. _One (1) DATE OF ISSUANCE March 6 2006 EFFECTIVE DATE March 6 2006 OWNER City of Bozeman ... ®_ „_......,_.,--- CONTRACTOR In am- Cleven er Inc. Contract: Bozeman Wastewater Treatment Plant Maintenance Building Addition Project: Equipment Stora e Buildin OWNNER's Contract No, 56052 ENGINEER's Contract No. 0417.049 ENGINEER Morrison - Maierle Inc. You are directed to make the following changes in the Contract Documents.: Description: (See attached change order proposal) Reason for Change Order:. Owner requested changes and Contractor initiated credits.. Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: Original Contract Price $ $3,98,000 Net Increase (Decrease) from previous Change Orders: None -0- Contract Price prior to this Change Order: $ $398 000 Net increase (decrease) of this Change Order; $ ($1,967.96 Contract Price with all approved Change Orders: $ $396 032.04 RECOMMENDED: By n (ENGINEER - Signature) Date: C G EICDC 1910 -8 -B (1996 Edition Prepared by the Engineers Joint Contrac Construction Specifications Institute. CHANGE IN CONTRACT TIMES: Original Contract Times: Substantial Completion: 75 Days s Ready for final payment: 90 Days ( days or dates Net change from previous Change Orders: None Substantial Completion: - 0 - Ready for final payment: - 0 - da s) Contract Times prior to this Change Order: Substantial Completion: 75 Days Ready for final payment: 90 Days ( days or dates Net increase (decrease) this Change Order: Substantial Completion: - 0 - Ready for final payment: 0 ( days ) Contract Times with all approved Change Orders: Substantial Completion: 75 Days Ready for final payment: 90 Days (days or dates) APPROVED: ACCEPTED: OWNER (Authorized Signature) CONTRACTOR(Authorzed Signature) Date: March 20, 2006 Date: ` `? I Documents Committee and endorsed by The Associated General Contractors of America and the Page 1 of 1 H ;1041710491docstSPECS1Construct Docs\Change Order Gne.doc 05.29.01 INGRAM-C 7000 Green Meadow Drive : 0, Box 5387 - elena, MT 59604 NC. Phone: (406) 442-5102 FAX: (406) 442-5105 Droject Name: Bozeman Waste Water Treatment Plant Maintenance Building Addition :)roject Number 0417.049,040.0315 Date: 02.24,06 Item #1 Install Owner Furnished Unit Heater In new Equipment Storage Building Metal Works of Montana Install and Venting $550.00 Metal Work of Montana Furnish & Install Thermostat $200-00 Willaims Plumbing make final gas connection $150.00 ICI OH & P $108.00 Item Total $1,008.00 Item #2 Delete Requirement to furnsih and install treated plate with lag bolts at perimeter of concrete forundation wall ICI Labor ($570.54) ICI Materials ($326.00) ICI OH & P ($107,58) Item Total ($1,004,12) lem #3 Add thresholds, weatherstrip and door bottoms at doors #2 and #3 Change Locksets to stainless steel heavy duty corrision resistant finish Andeerson Steel Supply Locksets $689.00 Anderson Steel Supply Weatherstrip & etc $161.00 ICI Labor $68.00 ICI OH & P $110.16 Item Total $1,028.16 Item * 4 Contingency Provide credit to Owner ($3,000.00) Total these items ($1,967.96)