HomeMy WebLinkAbout04- West Side Sewer Rehab, Change order 2 with PECHKM ENGINEERING INC.
TO: — PEC, Inc.
3400 Centennial Drive
Helena, MT 59601
Change Order No:
Date
Project No.:
Contract For:
2
6/26/2004
4m229.138
West Side Sewer Rehab
It has been determined necessary and in the best interest of the Owner to modify certain portions of the Project
above and the Contract dated 24-Nov-03 and in accordance with the General Provisions.
The following changes are hereby agreed to,
1. Reconciliation of final quantities
ATTACHMENT:
1, Table of final quantity balance.
ESTIMATE AND COST
Note: The quantities shown are not guaranteed.
Payment will be based on actual quantities used.
ITEM
QUANTITY
UNIT
DESCRIPTION
UNIT
PRICE
AMOUNT
$0.00
CO2-1
1
LS
Reconciliation of Final Quantities
-$42,118.20
-$42,118.20
$0.00
$0.00
$0.00
Time (extension) (decrease) 0 days
Total Cost
-$42,118-�20
H:1091Master\chqorder2,xls\PaaeI
Not valid until signed by both the Owner and Engineer.
herewith, including any adjustment in the Contract Sum or Contract Time.
By signing below each party agrees that this Change Order is a complete and equitable adjustment for aH
proposals or claims whatsoever arising out of, resulting from, and/or directly related to the above occurrences,
revisions to the Contract, and/or this Change Order and hereby releases the others from all liability under this
contract for further adjustments in Contract Price or Contract Time for said occurrences, revisions, and/or this
supplemental agreement.
The original Contract Sum was
Net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be )by this Change Order
The new Contract sum including this Change Order will be
The Contract Time will bm(inoreaoed) by
The Date nf Substantial Completion oaof the date ofthis
Change Order therefore iu
$ 585,927.50
� -
$ 585,927.50
$ 543,809.30
0 days
pEC.|no
UM����
CITY OF BOZEMAN
OWNER
By er
Representatlr�" Title
NOTE: Fill aU spaces. In not applicable, write N/A
CITY OF BOZEMAN
2003 WEST SIDE SEWER REHABILITATION PROJECT
EPA PRIORITY GRANT 2
Attachment A - Reconciling Change Order
BID FORM
ITEM
101
DESCRIPTION
Mob/Demob.
UNIT
LS
PLAN
QUANTITY
1
FINAL
QUANTITY
1
UNIT PRICE
6500.00 $
TOTAL
0.00
102
Taxes, Bonds, Insurance
LS
1
1
$
2000.00 $
0,00
103
8" CIPP
LF
9,740
9,447
$
22.50 $
-6592.50
104
10" CIPP
LF
3,840
3,835
$
25.50 $
-127.50
105
18 CIPP
LF
1,520
1,443
$
48-50 $
-3734.50
106
8" SDR35 Sewer Pipe
LF
50
28
$
34.00 $
-748.00
107
4" - 6" SDR35 Sewer Pipe
LF
950
430.5
$
28.00 $
-14546.00
108
Sanitary Sewer Service
Replacement
EA
50
62
975.00 $
11700.00
109
Sewer Service Reinstatement
EA
196
211
$
75.00 $
1125.00
110
Sewer Service Root Removal
EA
20
1
$
135.00 $
-2565.00
I'll
New 48" MH
EA
1
1
$
4500.00 $
0.00
112
Replace Manhole Frame & Cover -
In Asphalt or Concrete
1
EA
19
12
$
575.00 $
-4025-00
113
Replace Manhole Frame & Cover -
In Gravel or Turf
EA
15
9
$
400.00 $
-2400.00
114
Replace Manhole Cover Only
EA
34
29
$
200.00 $
-1000.00
115
Replace Manhole Steps
EA
170
133
$
85.00 $
-3145.00
116
Utility Crossing
EA
30
28
$
120,00 $
-240.00
h:1041M2291381constructjon\ CO2Table,xls 6/28/2004
ITEM
117
DESCRIPTION
Exploratory Excavation
UNIT
HR
BID FORM (cont)
QUANTITY
20
0.5 $
UNIT PRICE
200.00$
TOTAL
-3900.00
118
Traffic Control
LS
1
1 $
4500.00 $
0.00
119
Gravel Surface Restoration
(Service Lines Only)
SY
900
751 $
20.00$
-2980.00
120
Asphalt Surface Restoration
(Service Lines Only)
SY
270
80.9 $
32.50 $
-6145.75
121
Curb & Gutter Restoration
LF
60
19.2
16.00$
-652.80
122
Sidewalk/Driveway Restoration
SF
315
-$
63.1 $
8.50 $
-2141.15
Bid Alternate No. 1 of 1 - Slipline 24" & 30"
Alt. 1 24" & 30" CIPP
TOTAL BASE BID (Change) $
Pipelines At Wastewater Treatment Plant
LS 1 1 $ 7000 $
-42,118.20
0.00
TOTAL BID (BASE BID + ALTERNATE 1) = $
-42,118.20
h:1041m2291381constructjon\ CO2Table.xls 6128/2004