Loading...
HomeMy WebLinkAbout03- West Side Sewer Rehab, Ch. order 1 with PECHKM ENGINEERING INC. [41UP,11591#111091 ari TO: _PEC, Inc. Change Order No: 3400 Centennial Drive Date — Helena, MT 59601 Project No.: Contract For. 4m229.138 West Side Sewer Rehab It has been determined necessary and in the best interest of the Owner to modify certain portions of the Project above and the Contract dated — 24-Nov-03 and in accordance with the General Provisions. The following changes are hereby agreed to: DESCRIPTION: 1. Modify Contract insurance provisions as follows: MPW Addendum #2 SC-5,04 CONTRACTORS LIABILITY INSURANCE Part C.4 Modify last sentence of this paragraph to read "Deductible not to exceed $10,000 per occurrence on property damage.' ATTACHMENT: (List DOGUrnents Supporting Change) 1. Attached sections of MPW Addendum No. 2 - Modified sections Noted. ESTIMATE AND COST Note: The quantities shown are not guaranteed. Payment will be based on actual quantities used. ITEM QUANTITY UNIT DESCRIPTION U NIT PRICE AMOUNT $0.00 No Cost Change Order $0.00 $0.00 $0.00 Time (extension) (decrease) days Total Cost $0.00 $0 1 11/25/2003 H:k09\Masterkchgorderl \Pagel Not valid until signed by both the Owner and Engineer. Signature��� herewith, including any adjustment inthe Contract Sum nr Contract Time. Bv signing below each party agrees that this Change Order ism complete and equitable adjustment for all proposals or claims whatsoever arising out of, resulting from, and/or directly related to the above occurrences, revisions to the Contract, and/or this Change Order and hereby releases the others from all liability under this contract for further adjustments in Contract Price or Contract Time for said occurrences, revisions, and/or this supplemental agreement. The original Contract Sum was Net change bv previously authorized Change Orders The Contract Sum prior tp this Change Order was The Contract Sum will bm )bV this Change Order The new Contract sum including this Change Order will bm The Contract Time will bu(inoneaued)by The Date of Substantial Completion as of the date of this Change Order therefore �s PEC.|ou. ' 4eptesefi l tative Title CITY OF BOZEMAN �—A Ci�y Mager Representative Title NOTE: Fill all spaces. |n not applicable, write N/A Engineer $ 585,927.50 $ 585,927,50 $ 585,927-50 d ays HKK4 Engineering Inc, NaMe ' f4epresevdative Title H R��Ij to the Standard Specifications Fourth Edition, January 1996 The following corrections, clarifications, and/or alterations to the Fourth Edition of the Montana Public Works Standard Specification are a part and parcel of said specifications as if included therein. This Addendum supercedes and replaces select sections of the bound specifications and all of Addendum Number 1 dated June 1, 1998. All documents and changes included in Addendum Number 1 are reissued and included in this Addendum. Specification users are encouraged to discard Addendum Number I entirely. @ 2000 Montana Contractors Association. No part of this book or addendum may be reproduced, stored in a retrieval system or transmitted in any form by an electronic, mechanical, photocopying or recording means or in any other way without prior written permission of the publisher. A.VkDDENUM2.dcc I 05M9100 @ 10:52 AM Add the following new paragraphs immediately after Paragraph 5.04.13: C. The lirr�its of liability for the insurance required by Paragraph 5.04 of the General 'Conditions shall, provide coverage for not less than the following amounts or greater where required by Law or. Regulations: 1. Workers' Compensation, etc, under Paragraphs 5.04.1 and 5.04,2 of the General Conditions. a. State Statutory b. Applicable Federal (e.g. Longshoremans) Statutory C. Employer's Liability $500-000100 2. CONTRACTOR!s Liability Insurance under Paragraphs 5,04.A-3 through 5.04. A-6 of the General conditions which shall also include completed operations and product liability coverage- a GENERAL AGGREGATE $3,000.000.00 b. Products-Completed Operations Aggregate $3,000,000,00 c Personal and Advertising d Each Occurrence {Bodily Injury and Property Damage) $1,000,000.00 e Coverage will include: 1. Premises - Operations 1 Operations of Independent Contractor 3. Contractual Liability 4. Personal Injury 5. Products and Completed Operations 6. Broad Form Property Damage will 'include explosion, collapse, blasting and underground where applicable. 7. Per Project Aggregate Endorsement AAMPW0081 O.doc 00810-5 05/01900 3. Automobile Liability under Paragraph 5.04.A. of the General Conditions: a- Bodily Injury: Each Person Each Accident Property Dama _ Each Accident (or) (or) b. Combined Single Limit Coverage to Include: I , All Owned 2. Hired 3, Non-Owned � 111 rr 1 11 OEM N-3 4. CONTRACTOR'S Liability Insurance under 5,04.A-3 through 5.04.A-6 may be satisfied by primary insurance or a combination of primary and excess or umbrella insurance. Primary occurrence limit cannot be less than $1,000,000,00. Deductible not to exceed $5-.06949-per occurrence on property damage. Al IC> 000. C? 5. Add a new paragraph at the end of Paragraph 5.04.B. of the General Conditions as Mows: The CONTRACTORS 'insurance coverage shall name the OWNER, and ENGINEER and Engineers Consultants as an additional - insured under Commercial General Liability, Automobile Liability, Excess or Umbrella polices. 6. The Contractual Liability coverage required by Paragraph 5.04,13.4. of the General Conditions shall provide coverage for not less than the following amounts: Each Occurrence Aggregate SC- 5.04.B.5 CANCEIATION NOTICE � Iit I Amend paragraph 5.04,13.5 of the General Conditions by striking out the words "30 days" and replacing them with the words "45 days" and as so amended paragraph 5.04.B.5 remains in effect. A:WPW0081 O.dGc 00810-6 05/09/00