HomeMy WebLinkAbout03- West Side Sewer Rehab, Ch. order 1 with PECHKM ENGINEERING INC.
[41UP,11591#111091 ari
TO: _PEC, Inc. Change Order No:
3400 Centennial Drive Date
— Helena, MT 59601 Project No.:
Contract For.
4m229.138
West Side Sewer Rehab
It has been determined necessary and in the best interest of the Owner to modify certain portions of the Project
above and the Contract dated — 24-Nov-03 and in accordance with the General Provisions.
The following changes are hereby agreed to:
DESCRIPTION:
1. Modify Contract insurance provisions as follows:
MPW Addendum #2 SC-5,04 CONTRACTORS LIABILITY INSURANCE Part C.4
Modify last sentence of this paragraph to read "Deductible not to exceed $10,000 per occurrence on property damage.'
ATTACHMENT: (List DOGUrnents Supporting Change)
1. Attached sections of MPW Addendum No. 2 - Modified sections Noted.
ESTIMATE AND COST
Note: The quantities shown are not guaranteed.
Payment will be based on actual quantities used.
ITEM
QUANTITY
UNIT
DESCRIPTION
U NIT
PRICE
AMOUNT
$0.00
No Cost Change Order
$0.00
$0.00
$0.00
Time (extension) (decrease) days Total Cost
$0.00
$0
1
11/25/2003
H:k09\Masterkchgorderl \Pagel
Not valid until signed by both the Owner and Engineer. Signature���
herewith, including any adjustment inthe Contract Sum nr Contract Time.
Bv signing below each party agrees that this Change Order ism complete and equitable adjustment for all
proposals or claims whatsoever arising out of, resulting from, and/or directly related to the above occurrences,
revisions to the Contract, and/or this Change Order and hereby releases the others from all liability under this
contract for further adjustments in Contract Price or Contract Time for said occurrences, revisions, and/or this
supplemental agreement.
The original Contract Sum was
Net change bv previously authorized Change Orders
The Contract Sum prior tp this Change Order was
The Contract Sum will bm )bV this Change Order
The new Contract sum including this Change Order will bm
The Contract Time will bu(inoneaued)by
The Date of Substantial Completion as of the date of this
Change Order therefore �s
PEC.|ou.
' 4eptesefi l tative Title
CITY OF BOZEMAN
�—A Ci�y Mager
Representative Title
NOTE: Fill all spaces. |n not applicable, write N/A
Engineer
$ 585,927.50
$ 585,927,50
$ 585,927-50
d ays
HKK4 Engineering Inc,
NaMe
' f4epresevdative Title
H
R��Ij
to the
Standard Specifications
Fourth Edition, January 1996
The following corrections, clarifications, and/or alterations to the Fourth Edition of the Montana
Public Works Standard Specification are a part and parcel of said specifications as if included
therein. This Addendum supercedes and replaces select sections of the bound specifications and all
of Addendum Number 1 dated June 1, 1998. All documents and changes included in Addendum
Number 1 are reissued and included in this Addendum. Specification users are encouraged to
discard Addendum Number I entirely.
@ 2000 Montana Contractors Association. No part of this book or addendum may be
reproduced, stored in a retrieval system or transmitted in any form by an electronic,
mechanical, photocopying or recording means or in any other way without prior written
permission of the publisher.
A.VkDDENUM2.dcc
I
05M9100 @ 10:52 AM
Add the following new paragraphs immediately after Paragraph 5.04.13:
C. The lirr�its of liability for the insurance required by Paragraph 5.04 of the
General 'Conditions shall, provide coverage for not less than the following
amounts or greater where required by Law or. Regulations:
1. Workers' Compensation, etc, under Paragraphs 5.04.1 and 5.04,2 of the General
Conditions.
a. State Statutory
b. Applicable Federal (e.g. Longshoremans) Statutory
C. Employer's Liability $500-000100
2. CONTRACTOR!s Liability Insurance under Paragraphs 5,04.A-3 through 5.04. A-6 of the
General conditions which shall also include completed operations and product liability
coverage-
a GENERAL AGGREGATE $3,000.000.00
b. Products-Completed
Operations Aggregate $3,000,000,00
c Personal and Advertising
d Each Occurrence
{Bodily Injury and
Property Damage) $1,000,000.00
e Coverage will include:
1. Premises - Operations
1 Operations of Independent Contractor
3. Contractual Liability
4. Personal Injury
5. Products and Completed Operations
6. Broad Form Property Damage will 'include explosion, collapse, blasting
and underground where applicable.
7. Per Project Aggregate Endorsement
AAMPW0081 O.doc 00810-5
05/01900
3. Automobile Liability under Paragraph 5.04.A. of the General Conditions:
a- Bodily Injury:
Each Person
Each Accident
Property Dama
_
Each Accident
(or)
(or) b. Combined Single Limit
Coverage to Include:
I , All Owned
2. Hired
3, Non-Owned
� 111 rr 1 11
OEM
N-3
4. CONTRACTOR'S Liability Insurance under 5,04.A-3 through 5.04.A-6 may be satisfied
by primary insurance or a combination of primary and excess or umbrella insurance.
Primary occurrence limit cannot be less than $1,000,000,00. Deductible not to exceed
$5-.06949-per occurrence on property damage.
Al
IC> 000. C?
5. Add a new paragraph at the end of Paragraph 5.04.B. of the General Conditions as
Mows:
The CONTRACTORS 'insurance coverage shall name the OWNER, and
ENGINEER and Engineers Consultants as an additional - insured under
Commercial General Liability, Automobile Liability, Excess or Umbrella
polices.
6. The Contractual Liability coverage required by Paragraph 5.04,13.4. of the General
Conditions shall provide coverage for not less than the following amounts:
Each Occurrence
Aggregate
SC- 5.04.B.5 CANCEIATION NOTICE
� Iit
I
Amend paragraph 5.04,13.5 of the General Conditions by striking out the words "30
days" and replacing them with the words "45 days" and as so amended paragraph
5.04.B.5 remains in effect.
A:WPW0081 O.dGc 00810-6
05/09/00