Loading...
HomeMy WebLinkAboutConsideration of reclaiming jurisdiction of Resurrection Church.pdfAttachment: Request to Reclaim Memo compiled on: January 28, 2011 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Keri Thorpe, Assistant Planner Tim McHarg, Planning Director Chris A. Kukulski, City Manager SUBJECT: Jurisdiction of Resurrection Catholic Church Addition Conditional Use Permit Application with variance requests for a 9,682 sq. ft. addition, free standing bell tower in the front yard and related improvements (#Z-10356) Final Approval MEETING DATE: February 7, 2011 AGENDA ITEM TYPE: Action Item RECOMMENDATION: That the City Commission consider reclaiming to itself the final approval of the Resurrection Catholic Church Conditional Use Permit Application with variances, per Section 18.64.010 C.1 of the B.M.C., and further set a tentative public hearing date of February 28, 2011 for formal consideration of the application. BACKGROUND: On January 27, 2011, the applicant’s representative, Bob Mechels of Dowling Sandholm Architects submitted written request to the City Clerk’s Office that the City Commission reclaim to itself the final approval of Resurrection Catholic Church Conditional Use Permit Application which includes variance requests for the construction of a bell tower in the front yard. The proposed bell tower would be taller than the proposed addition to the existing building. Staff has deemed the bell tower an accessory structure, and as such Sections 18.38.050.E.1, BMC and 18.38.050.G.1, BMC prohibit its construction. The application is currently scheduled for its 3rd review with the Development Review Committee on February 2nd. A wetlands report was prepared for the project and is currently being distributed to members of the Bozeman Wetlands Review Board. This application is currently scheduled to be heard by the Board of Adjustment on March 8, 2011. UNRESOLVED ISSUES: None identified. FISCAL IMPACTS: None. ALTERNATIVES: As suggested by the City Commission. 29 55 West 14th Street Suite 103 Helena, MT 59601 2042 Stadium Drive Suite 2 Bozeman, MT 59715 406-457-5470 ph 406-495-0063 fax 406-556-0113 ph 406-556-0114 fax www.dowlingsandholm.com January 27th, 2011 Mayor and Commissioners City of Bozeman 121 N. Rouse Bozeman, MT 59771 RE: Resurrection Parish Catholic Church with Variance Request (Application #Z-10356) Mayor and Commissioners: On behalf of our client, Resurrection University Parish Catholic Church, we are respectfully requesting that the City Commission reclaim this project for review. The project includes an addition to the existing church located at 1725 S. 11th Avenue, which is along the south edge of the MSU campus. The existing Church with proposed addition is a Conditional Use within its R4 zone. We are submitting two variance requests, the first to Section 18.38.050 G.1 of the Unified Development Ordinance (UDO) and the second to 18.38.060 D.1. Section 18.38.050G.1 addresses detached accessory structures in front, side or corner-side yards and Section 18.38.060 D.1 addresses Height Limitation Exceptions. Due to the unique design goals and challenges of church projects, the location and context of this particular church and the lack of clear code definition and requirements pertaining to bell towers, we feel it is most appropriate to take this course of action. If you have any question regarding this request please feel free to contact me at 556-0113 or bmechels@dowlingsandholm.com. Sincerely, ________________________________ Bob Mechels, LEED-AP, AIA Associate Principal-Dowling Sandholm Architects cc: Father Val Zdilla & Diane Dwyer, Resurrection Parish Chris Budeski, Madison Engineering Keri Thorpe, Assistant Planner-City of Bozeman file 30