HomeMy WebLinkAboutApprove Resolution No_ 4309, authorize City M23232_4 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: Bozeman Water Reclamation Facility, Phase 1 Improvements – Change Order No. 7. MEETING DATE: January 31, 2011 AGENDA ITEM TYPE: Consent. RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign Bozeman Water Reclamation Facility, Phase 1 Improvements – Change Order No. 7. BACKGROUND: Attached is a copy of change order number 7 for the above referenced project. This change order includes nineteen items. Two of the items are credits while the other seventeen are additions. Pages three through five of the attached document titled “Change Order No. 7 Summary” provides a short description of each of the items involved with this change. Additionally, the remainder of the document contains the detailed backup cost information for each item. No change in contract time is being provided with this change. The Substantial and Final Completion Contract Times are not changed. The final recommended decrease in cost and time extension for this change is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Overall this change order increases the contract amount by $105,151.00 from $36,450,814.90 to $36,555,965.90. This will decrease the contingency on the project from $1,791,962.99 to $1,686,811.99. Attachments: Change Order No. 7 Resolution 4309 Report compiled on: January 13, 2011 13 1 of 2 COMMISSION RESOLUTION NO. 4309 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH WILLIAMS BROTHER CONSTRUCTION, LLC., BILLINGS, MONTANA. WHEREAS, the City Commission did, on the 10th day of November 2008, authorize award of the bid for the Bozeman Water Reclamation Facility Phase I Improvements project, to Williams Brother Construction, LLC., Billings, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Williams Brother Construction, LLC., as contained in Change Order No. 7, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 14 Resolution No. 4309, Change Order 7 for WRF 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 31st day of January 2011. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161