HomeMy WebLinkAboutResolution 4303 Change Order 17, City Shops/HRDC Bus BarnCOMMISSION RESOLUTION NO. 4303 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATIONIMODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract, NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #17, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 1 of 2 ResoluriojO'o, 4303 Change ordo, wI PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 13th day of December, 2010, J S F K rr ay ATP 0 9K tmc Page 2 of 2 � dowNog mandhuhn | aohitect Project: City Shops/ HRDC Bus Barn 1821N Rouse Ave Bozeman, K8T5A715 To Contractor: BN Builders, Inc 2066 Stadium [}r.. Ste 1O2 Bozeman, MT59715 Date: November 29.2O10 Architects Project No 08-285 Contract Date- November 4.2OO9 Contract For: General Construction Owner N Architect 0 Contractor 0 Field [] Other O The Contract is changed as follows: Increase Contract Sum. Reason for Du installation of the radiant floor system inthe Shops building, radiant tubing was being run from the shops to the manifold in the mechanical room via the center offices. It was noted that this installation would significantly and adversely affect the center office spaces and the function of its heaflng zones. The manifolds were re-located hmthe shop space, but because part of the slab had already been placed, the tubing had to be split into two manifolds instead of one, Upon review of the process, it was discovered that the radiant installer did not submit shop drawings, and that a review of shop drawings would have necessitated an alternate layout. That alternate layout would have incurred some cost, but not the full cost the radiant installer was asking for the work ao completed, The negotiated change reflects a significant reduction in the cost of the system aminstalled due bo the lack nf shop drawings. (CP#37.5O%/5Q%split) After seeing the mechanical penthouse units prov for the exhaust air mn the shop and bus barn spaces, it was decided that the mechanical screens were not required, and the City Planning department allowed their removal. (CP#47. 5096 /5094split) As work in the mechanical room progressed, the space allotted for the air compressor began to interfere with clearances at the furnaces and around the air compressor itself. Upon closer inspection of the layout and equipment sizing, it was discovered that the air compressor was a total of 8" to 9" longer than the product data provided. Also, due Loo previous change in fresh air supply to the mechanical room, new ducting further impeded on the space allotted for the compressor. While this is a minor size change, the clearances in the room were already an tight asto make placement ofthe air compressor difficult at best, and almost unserviceable in the long run. (twas decided Ko mount the air compressor in the HRDC bus barn space adjacent to the mechanical room, allowing easier access for any future maintenance of both the air compressor and the furnaces in the mechanical room. (CP#51.1UOY6COB) - ^~.~c�.~.t CP#37 CP#47; CP#51 Total ContranSmmAdiustment The original Contract Sum was The net change bv previously authohzmdChange{]rdern The Contract Sum prior hz this Change Order was The Contract Sum will be increased bv this Change Order bv the amount of The new Contract Sum including this Change Order will be Citv of Bozeman Contract Sum Adiustment The original CnntractSWmvvas The net change bv previously authorized Change Orders 64 The Contract Sum ' iorto this Change Order was The Contract SLIM will be Order - (53.87Y6of Total Change Order) The new Contract Sum including this Change Order will be JOINT OWNER CHANGE ORDER C.O.:�Mli HRDC Contract Sum Adjustment: The original Contract Sum was $ 858,368.59 The net change by previously authorized Change Orders $ 56,535A0 The Contract Sum prior to this Change Order was 914,903.99 The Contract Sum will be increased by this Change Order by the amount of 5,068,15 (46,33% of Total Change Order) The new Contract Sum including this Change Order will be $ 919.97214 By: Date- Mike Wiseman Contract Time Adjustment: The Contract Time will be increased by zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is: November 24, 201 Not valid until signed by Architect, Contractor and Owners. Signatures: Architect: Dowling Sandholm Architects 15 West 14 Street — Suite 103 Helena, Mt 59601 Place Architecture 118 E. Main St Bozeman, MT, 59715 Contractor: BN Builders, Inc 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Owner: City of Bozeman P.O. Box 1.230 Bozeman, MT 59771 Human Resource Development Council 32 South Tracy Bozeman, MT 59715 By a Date: aemi SasyVazerninejad By Date: By Date , Chris �, ,ukulski By� Date: 'Tee Hazelbakg Page 2 of.2 File 21 f C04 I 7—Joint.doc