HomeMy WebLinkAboutChange Order 18, City Shops/HRDC Bus Barn, BN Buildersdowfing I sandholm I architects
• I L I ; •
Project: City Shops/ HRDC Bus Bam
1821 N. Rouse Ave
Bozeman, MT 59715
To , Contractor: BN Builders, Inc
2066 Stadium Dr., Ste 102
Bozeman, MT 59715
The Contract is changed as follows:
Increase Contract Sum,
Date: November 29, 201 Owner M
Architect 0
Architect's Project No: 08-265 Contractor M
Field M
Contract Date: November 4, 2009 Other El
Contract For: General Construction
Reason for change:
The Owners have decided to proceed with demolition of an existing structure on site, the old wastewater
control building which had been used as a fire training structure. The presence of lead and asbestos in the
structure has warranted specific disposal requirements, spelled out in the attached Cost Proposal. (CP #45,
50150 split)
Attachment(s):
CP #45
Total Contract Sum Adjustment:
The original Contract Sum was $_ 1,907,600M
The net change by previously authorized Change Orders $ -- 131,966M
The Contract Sum prior to this Change Order was $_2 039,566,00
The Contract Sum will be increased by this Change Order by the amount of $ 42,493.00
The new Contract Sum including this Change Order will be $ 2.082,059.00
City of Bozeman Contract Sum Adjustment:
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this Change Order by the amount of
(50% of Total Change Order)
The new Contract Sum including this Change Order will be
HRDC Contract Sum Admustment:
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this Change Order by the amount of
(46.33% of Total Change Order)
The new Contract Sum including this Change Order will be
$ 1 ,049,2'1.41
$ 70,362.44
$ 1,111
$ 21 �246.50
$ 1,140,840,35
$ 85836&59
$ 61,6U55
$ 919,972,14
21,246,50
941,218.64
Contract Time Adiustment:
The Contract Time will be increased by -zero L0Ldays.
The date of Substantial Completion as of the date of this Change Order therefore is: November 24, 201
Not valid until signed by Architect, Contractor and Owners.
Signatures:
Architect: Dowling Sandholm Architects
15 West 14' Street — Suite 103
Helena, Mt 59601
Place Architecture
118 E, Main St
Bozeman, MT, 59715
Contractor: BN Builders, Inc
2066 Stadium Dr., Ste 102
Bozeman MT 59715
Owner: City of Bozeman
P.O. Box 1230
Bozeman, MT 59771
Human Resource
Development Council
32 South Tracy
Bozeman, MT 59715
BY:_ 'Al 1-1__.____ Date: 1 2 0-116
Mike Wiseman
By: 2111", Date:
Sash Kaz6
. . . . .............. . ............
Date*
By:L" A, " - Date:
Thris Kukulski
Date
Lee Hazelbak6r
Page 2 of 2
File 21f
C0418—Joint.doc
B
5 N Builder's
mrj�;day'
I
no Ah SN A
i vinct Iq 1 59601
RE: Chmigie PmWosM - CP# 45
Hozonan Ch, Bus Bani - 50901'2
Dan Me VQwnw;�
I 1 I. Is k.c) f a I It ! I /'ar I". 11 1C. VP t ' , I. ( f - 9 I;( "" I n" C -a , "2 o� .
CP Number 45
Descriptiow 91idf E!"Oddig RenlovM
Fli'oposed 42,493.00
Days Reqoesod: 0 days
Scvpe of Wor Px t ki"!
Ps'ov�d'- c@ ;7 in nopm, W GO buld"Y WW ` +10.1{1! {'M .01 3 AN (a on YMN, ad
on". i& 'Ap MWEIR. I SOP MIKILY di K. Av Uly is P c11rtl8ije o! PM[All�j
" ;;i h J-im ' cind
JQ o^l a M foHn in to in (JI 11�11
Wiring jq Inny removol, j 0* Dj, , , vvil w ch qj �(t :11" f.
;1 I :' ')v; Ion um""nj Un 'A I W am on ow hwonw a jonn -aj a 1p- jyp""�o
1�11 j' , - " I � j uT'r
UNUD ro- Mn on -Mp how v W vWk M; n" "I W a
El � .A� 'i , I, L un �i �—,v,i I � � �o.. —1 � 'jo — j " !I, -
I W;," Ni" IY.] ! ,r ,"a ", � 15
WqAed hy MY
Moo &J" MWOMM
2o iments from James
Coehrurtg ran ige two of this CP
Page ln{l
Michael W
From: James GoehrungQames-G@B0ZEMAN.NET)
Sent: Tuesday, November 16,2Q1O2:28P[N
To: Jenee Benner; nnwimemmn@dmwNmgomndhn|m.00m
Cc/ Lee Haze|bmber;ooshk.phoe@yahmm.omm; Brian Nostrant
Subject: RE: Brick Building
From: ]enae Benner [mailtojmnaebennmr@bnbuUders.com]
Sent: TueaJay, November 16, 2010 10:37 AM
To.mwiammoo@dmm|ingaandho|m.com; JamesGoehnumg
Cc: Lee Nooe|boker;sashk, place @9ahmo.cum; BrienNostrant
S�wbj:em±: Brick Building
James,
Have you heard any information with regards to using the Bozeman landfill for disposal of the brick
building? I have talked to Sime and they said if they take it to the landfill in Bozeman instead of Logan
then the price of the landfill tickets can be subtracted from their total price, Please let mm know which
landfill vve will be using so| can write a CO to them with that information. [ will also need a signed Cyon
your end to proceed.
Thanks,
rionao�eavne,
Information from E8BTN()D82 Antivirus, version of virus signature database 5624
The message was checked 6vESBTN[}D32 Antivirus.
All City of Bozeman emaila are subject to the Right to Know
provisions of Montana's
Constitution (Art. II, Sect. 9) and may be considered a "public
record" per Sect. 2-6-302
and Sect. 2-6-40I Montana Code Annotated. As such, this email,
its sender and receiver,
and the contents may be available for public disclosure and will
be retained pursuant to the
City's record retention policies. Enzaile that contain
confidential information related to
individual privacy may be protected from disclosure under law,
1\/I9/20lO
CHANGE PROPOSAL DETAIL BACKUP
p'.0 I. (-'tt " : 5 ()x)01 - 2 Cla Jt 4S
liuzuln,m City Bus Sam
B N B 1812 rl, Rou Aveniji!
Bozerndr� MT 597 5
colltriiciof Amount
To 1 0
D -.1derc" h.
COMMISSION RESOLUTION NO. 4305
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
BOZEMAN, MONTANA, APPROVING ALTERATION /MODIFICATION OF
CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA.
WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the
bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders,
Bozeman, Montana; and
"'WHEREAS, Section 7 -5 -4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and/or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and /or plans of the contract,
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman,
a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #18,
attached hereto, be and the same are hereby approved, and the City Manager is hereby authorized and
directed to execute the contract change order for and on behalf of the City, and the City Clerk is
authorized and directed to attest such signature.
Roolation Alo, 4305 Chev�tfc ordei-418
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a
regular session thereof held on the 20th day of December, 20 10,
130
ATI'E !
c
S'f-WvVvt cMC
C ity Cie"'-k
JEFFREY KJKRAUSS
Mayqr
Page 2 of 2
99
APPROVED AS TO F RM.-