HomeMy WebLinkAboutChange Order 18, City Shops/HRDC Bus Barn, BN Buildersdowfing I sandholm I architects • I L I ; • Project: City Shops/ HRDC Bus Bam 1821 N. Rouse Ave Bozeman, MT 59715 To , Contractor: BN Builders, Inc 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 The Contract is changed as follows: Increase Contract Sum, Date: November 29, 201 Owner M Architect 0 Architect's Project No: 08-265 Contractor M Field M Contract Date: November 4, 2009 Other El Contract For: General Construction Reason for change: The Owners have decided to proceed with demolition of an existing structure on site, the old wastewater control building which had been used as a fire training structure. The presence of lead and asbestos in the structure has warranted specific disposal requirements, spelled out in the attached Cost Proposal. (CP #45, 50150 split) Attachment(s): CP #45 Total Contract Sum Adjustment: The original Contract Sum was $_ 1,907,600M The net change by previously authorized Change Orders $ -- 131,966M The Contract Sum prior to this Change Order was $_2 039,566,00 The Contract Sum will be increased by this Change Order by the amount of $ 42,493.00 The new Contract Sum including this Change Order will be $ 2.082,059.00 City of Bozeman Contract Sum Adjustment: The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order by the amount of (50% of Total Change Order) The new Contract Sum including this Change Order will be HRDC Contract Sum Admustment: The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order by the amount of (46.33% of Total Change Order) The new Contract Sum including this Change Order will be $ 1 ,049,2'1.41 $ 70,362.44 $ 1,111 $ 21 �246.50 $ 1,140,840,35 $ 85836&59 $ 61,6U55 $ 919,972,14 21,246,50 941,218.64 Contract Time Adiustment: The Contract Time will be increased by -zero L0Ldays. The date of Substantial Completion as of the date of this Change Order therefore is: November 24, 201 Not valid until signed by Architect, Contractor and Owners. Signatures: Architect: Dowling Sandholm Architects 15 West 14' Street — Suite 103 Helena, Mt 59601 Place Architecture 118 E, Main St Bozeman, MT, 59715 Contractor: BN Builders, Inc 2066 Stadium Dr., Ste 102 Bozeman MT 59715 Owner: City of Bozeman P.O. Box 1230 Bozeman, MT 59771 Human Resource Development Council 32 South Tracy Bozeman, MT 59715 BY:_ 'Al 1-1__.____ Date: 1 2 0-116 Mike Wiseman By: 2111", Date: Sash Kaz6 . . . . .............. . ............ Date* By:L" A, " - Date: Thris Kukulski Date Lee Hazelbak6r Page 2 of 2 File 21f C0418—Joint.doc B 5 N Builder's mrj�;day' I no Ah SN A i vinct Iq 1 59601 RE: Chmigie PmWosM - CP# 45 Hozonan Ch, Bus Bani - 50901'2 Dan Me VQwnw;� I 1 I. Is k.c) f a I It ! I /'ar I". 11 1C. VP t ' , I. ( f - 9 I;( "" I n" C -a , "2 o� . CP Number 45 Descriptiow 91idf E!"Oddig RenlovM Fli'oposed 42,493.00 Days Reqoesod: 0 days Scvpe of Wor Px t ki"! Ps'ov�d'- c@ ;7 in nopm, W GO buld"Y WW ` +10.1{1! {'M .01 3 AN (a on YMN, ad on". i& 'Ap MWEIR. I SOP MIKILY di K. Av Uly is P c11rtl8ije o! PM[All�j " ;;i h J-im ' cind JQ o^l a M foHn in to in (JI 11�11 Wiring jq Inny removol, j 0* Dj, , , vvil w ch qj �(t :11" f. ;1 I :' ')v; Ion um""nj Un 'A I W am on ow hwonw a jonn -aj a 1p- jyp""�o 1�11 j' , - " I � j uT'r UNUD ro- Mn on -Mp how v W vWk M; n" "I W a El � .A� 'i , I, L un �i �—,v,i I � � �o.. —1 � 'jo — j " !I, - I W;," Ni" IY.] ! ,r ,"a ", � 15 WqAed hy MY Moo &J" MWOMM 2o iments from James Coehrurtg ran ige two of this CP Page ln{l Michael W From: James GoehrungQames-G@B0ZEMAN.NET) Sent: Tuesday, November 16,2Q1O2:28P[N To: Jenee Benner; nnwimemmn@dmwNmgomndhn|m.00m Cc/ Lee Haze|bmber;ooshk.phoe@yahmm.omm; Brian Nostrant Subject: RE: Brick Building From: ]enae Benner [mailtojmnaebennmr@bnbuUders.com] Sent: TueaJay, November 16, 2010 10:37 AM To.mwiammoo@dmm|ingaandho|m.com; JamesGoehnumg Cc: Lee Nooe|boker;sashk, place @9ahmo.cum; BrienNostrant S�wbj:em±: Brick Building James, Have you heard any information with regards to using the Bozeman landfill for disposal of the brick building? I have talked to Sime and they said if they take it to the landfill in Bozeman instead of Logan then the price of the landfill tickets can be subtracted from their total price, Please let mm know which landfill vve will be using so| can write a CO to them with that information. [ will also need a signed Cyon your end to proceed. Thanks, rionao�eavne, Information from E8BTN()D82 Antivirus, version of virus signature database 5624 The message was checked 6vESBTN[}D32 Antivirus. All City of Bozeman emaila are subject to the Right to Know provisions of Montana's Constitution (Art. II, Sect. 9) and may be considered a "public record" per Sect. 2-6-302 and Sect. 2-6-40I Montana Code Annotated. As such, this email, its sender and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City's record retention policies. Enzaile that contain confidential information related to individual privacy may be protected from disclosure under law, 1\/I9/20lO CHANGE PROPOSAL DETAIL BACKUP p'.0 I. (-'tt " : 5 ()x)01 - 2 Cla Jt 4S liuzuln,m City Bus Sam B N B 1812 rl, Rou Aveniji! Bozerndr� MT 597 5 colltriiciof Amount To 1 0 D -.1derc" h. COMMISSION RESOLUTION NO. 4305 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION /MODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozeman, Montana; and "'WHEREAS, Section 7 -5 -4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and /or plans of the contract, NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #18, attached hereto, be and the same are hereby approved, and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City, and the City Clerk is authorized and directed to attest such signature. Roolation Alo, 4305 Chev�tfc ordei-418 PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 20th day of December, 20 10, 130 ATI'E ! c S'f-WvVvt cMC C ity Cie"'-k JEFFREY KJKRAUSS Mayqr Page 2 of 2 99 APPROVED AS TO F RM.-