Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Chris Kukulski, City Manager
Anna Rosenberry, Finance Director
SUBJECT: Adoption of Parts of the Recommended Capital Improvements Plan (CIP)
for FY2012-2016 – STREET IMPACT FEE FUND
Item Type: Consent
MEETING DATE: January 3, 2011
RECOMMENDATION: Adopt the attached portion of the Capital Improvements Plan for
FY2012-2016 for the Street Impact Fee Fund
BACKGROUND: On December 13, 2010, we presented and discussed the attached plan for
capital projects paid for with Street Impact Fees. No changes were made to these recommended
schedules as a result of that meeting.
Advisory Committee: The City’s Impact Fee Advisory Committee (IFAC) met on November
18th and November 23rd to develop and discuss these recommended schedules. The committee
currently does not contain a quorum, so these recommendations were not formally voted on.
FISCAL EFFECTS: This step in the process has no immediate fiscal effect – although
scheduled impact fee projects may be eligible for impact fee credits under BMC 3.24.100. Once
90
adopted, the Capital Improvements Plan becomes the basis of the City Manager’s Recommended
Budget for FY12.
ALTERNATIVES: The attached plan can be modified, or not adopted at all.
Report compiled on: December 22, 2010
Recommended - Street Impact Fee CIP
91
Street Impact FeeCapital Improvement PlanFinancial Summary Current YearFY11 FY12 FY13 FY14 FY15 FY16Projected Beginning Reserve Balance Dedicated to CIP 7,240,000$ 6,990,000$ 6,947,000$ 3,665,070$ 3,903,421$ 946,340$ Plus: Impact Fee Revenues Dedicated to CIP 700,000$ 707,000$ 714,070$ 728,351$ 742,918$ 757,777$ Plus: Urban Funds: SIF06, College (Main to 19th) 100,000$ 100,000$ 2,264,000$ Plus: Urban Funds: SIF09, Kagy (Willson to 19th) 260,000$ 2,400,000$ Less: Scheduled CIP Project Costs (1,050,000)$ (850,000)$ (6,260,000)$ (750,000)$ (6,100,000)$ (100,000)$ Projected Year‐End Cash Dedicated to CIP 6,990,000$ 6,947,000$ 3,665,070$ 3,903,421$ 946,340$ 1,604,117$ Assumptions Made for Revenue Estimates: Current YearFY11 FY12 FY13 FY14 FY15 FY16Estimated Annual Street Impact Fee Revenues 700,000$ 700,000$ 707,000$ 714,070$ 728,351$ 742,918$ Estimated Annual Increase 0.0% 1% 1% 2% 2% 2%Total Estimated Revenues 700,000$ 707,000$ 714,070$ 728,351$ 742,918$ 757,777$ Current Revenues Dedicated to CIP % 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% Plus: Increase Dedicated to Street Capacity Expansion CIP 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%ProjectedProjectedTotal Estimated Revenues Dedicated to CIP 700,000$ 707,000$ 714,070$ 728,351$ 742,918$ 757,777$ 30,000,00025,000,00020,000,00015,000,00010,000,0005,000,0000FY12 FY13 FY14 FY15 FY16 UnscheduledStreet Impact Fee Projects 92
CIP PROJECT FUNDPROJ.DEPARTMENTPROJECT NAMEFY12FY13FY14FY16UnscheduledFY15Impact Fees StreetsSIF01STREET IFRIGHT OF WAY ACQUISITION$100,000$100,000$100,000$100,000$100,000SIF02STREET IFBAXTER (19TH TO COTTONWOOD)$3,350,000SIF04STREET IFCHURCH$5,800,000SIF05STREET IFCOLLEGE (8TH TO 19TH)$2,000,000SIF06STREET IFCOLLEGE (MAIN TO 19TH)$250,000$5,660,000SIF08STREET IFDURSTON (FOWLER TO FERGUSON)$1,500,000SIF09STREET IFKAGY (WILLSON TO 19TH)$650,000$6,000,000SIF19STREET IFINTERSECTION CONTROL: 27TH & OAK$500,000SIF20STREET IFINTERSECTION CONTROL: 7TH & KAGY$540,000SIF21STREET IFGRAF STREET CONNECTION$1,000,000SIF22STREET IFINTERSECTION CONTROL: COLLEGE & 8TH$750,000SIF23STREET IFHIGHLAND BLVD (MAIN STREET TO KAGY BLVD.)$7,600,000SIF24STREET IFINTERSECTION CONTROL: HIGHLAND AND ELLIS STREET$500,000SIF25STREET IFINTERSECTION CONTROL: HIGHLAND AND KAGY$750,000SIF26STREET IFINTERSECTION CONTROL: CHURCH AND KAGY$750,000SIF27STREET IFINTERSECTION CONTROL: COTTONWOOD ROAD & DURSTON AVE$500,000SIF28STREET IFNORTH 27TH STREET (OAK TO TSCHACHE)$200,000Summary for Impact Fees Streets (17 items)Totals by year:$850,000 $6,260,000 $750,000 $6,100,000$100,000$24,740,000FY12FY13FY14FY15FY16Unscheduled93
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF01
DEPARTMENT
STREET IF
PROJECT NAME
RIGHT OF WAY ACQUISITION
FY12
$100,000
FY13
$100,000
FY14
$100,000
FY15
$100,000
FY16
$100,000
Unscheduled
DESCRIPTION OF PROJECT
Annual allocation available for right-of-way purchases as they become available. Purchasing additional right-of-way is critical to
expanding the capacity of streets in the city.
This is deemed to be 100% impact fee eligible – as additional right-of-way is not required if we are not expanding the capacity of
the street.
ALTERNATIVES CONSIDERED
1. Condemn property for right-of-way; pay court costs as well as appraised value of property. Time consuming for city staff and
a relatively expensive process.
ADVANTAGES OF APPROVAL
Provides dollars for the purchase of necessary right-of-way as it becomes available on the market. Avoids the expensive,
antagonistic condemnation process where possible.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Street Impact Fees can not be spent on operating and maintaining facilities. There is
expected to be a very minimal, incremental cost to the Street Maintenance District from this expenditure.
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
94
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF02
DEPARTMENT
STREET IF
PROJECT NAME
BAXTER (19TH TO COTTONWOOD)
FY12 FY13 FY14 FY15 FY16 Unscheduled
$3,350,000
DESCRIPTION OF PROJECT
Reconstruct Baxter Lane (from 19th Avenue to Cottonwood) to a Minor Arterial standard as shown in the Transportation Plan.
ALTERNATIVES CONSIDERED
Full payment by SID, or developer constructed.
ADVANTAGES OF APPROVAL
Improved capacity and safety in this corridor;
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current
cost estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
60% - Street Impact Fees = $2,000,000
40% - Special Improvement District (SID) or Other = $1,350,000
New
Replacement
Equipment
Project
95
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF04
DEPARTMENT
STREET IF
PROJECT NAME
CHURCH
FY12 FY13 FY14 FY15 FY16 Unscheduled
$5,800,000
DESCRIPTION OF PROJECT
Reconstruct Church Avenue to the collector standard identified in the Transportation plan from Main Street to Kagy Boulevard.
ALTERNATIVES CONSIDERED
Use of Urban Funds, or creation of an SID for full financing.
ADVANTAGES OF APPROVAL
Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians. The use of street impact fee funds
enables the community to leverage the available State Urban transportation funds to complete other projects and address more
of the city’s pressing transportation needs.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current
cost estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
60% - Street Impact Fees = $5,800,000
40% - Urban Funds, SID, or other sources = $3,800,000
New
Replacement
Equipment
Project
96
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF05
DEPARTMENT
STREET IF
PROJECT NAME
COLLEGE (8TH TO 19TH)
FY12 FY13 FY14 FY15 FY16 Unscheduled
$2,000,000
DESCRIPTION OF PROJECT
Reconstruct West College Street (from 8th Avenue to 19th Avenue) to a minor arterial standard as shown in the Transportation
Plan.
This section of West College has already exceeded the volume of traffic it was projected to carry in 2020 according to the
Transportation Plan.
Planned improvements to South 19th and increased development in the South 19th corridor will only further increase traffic
demand on this facility. Additionally this facility lacks pedestrian and bicycle facilities.
ALTERNATIVES CONSIDERED
Use of Urban funds for full financing, CTEP grants if available.
ADVANTAGES OF APPROVAL
Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians.
The use of street impact fee funds enables the community to leverage the available State Urban transportation funds to complete
other projects and address more of the city’s pressing transportation needs.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians.
The use of street impact fee funds enables the community to leverage the available State Urban transportation funds to complete
other projects and address more of the city’s pressing transportation needs.
FUNDING SOURCES
60% - Street Impact Fees = $2,000,000
New
Replacement
Equipment
Project
97
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF06
DEPARTMENT
STREET IF
PROJECT NAME
COLLEGE (MAIN TO 19TH)
FY12
$250,000
FY13
$5,660,000
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Reconstruct West College Street from Main Street (Huffine Lane) to 19th Avenue to a principal arterial standard as shown in the
Transportation Plan. This section of West College has already exceeded the volume of traffic it was projected to carry in 2010
according to the Transportation Plan. In the peak AM hour traffic is backed up from 19th to Huffine and beyond.
Planned improvements to South 19th and increased development in the Huffine Lane corridor will only further increase traffic
demand on this facility. In addition this facility lacks pedestrian and bicycle facilities.
ALTERNATIVES CONSIDERED
Use of Urban funds for full financing, CTEP grants if available
ADVANTAGES OF APPROVAL
Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians.
The use of street impact fee funds enables the community to leverage the available State Urban transportation funds to complete
other projects and address more of the city’s pressing transportation needs.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current
cost estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
60% - Street Impact Fees = $3,696,000
40% - State Urban Funds = $2,464,000
New
Replacement
Equipment
Project
98
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF08
DEPARTMENT
STREET IF
PROJECT NAME
DURSTON (FOWLER TO FERGUSON)
FY12 FY13 FY14 FY15 FY16 Unscheduled
$1,500,000
DESCRIPTION OF PROJECT
Over recent years, Durston Road has been significantly improved, except for this small portion of the road. This ~ 1/4 mile
length of road needs to be improved with completed sidewalk, bike lanes, and additional driving/turning lanes.
Incremental improvement of Durston Road with development projects may be possible, thus preventing a severe drop in service
level similar to that experienced on West Babcock Street.
ALTERNATIVES CONSIDERED
SID for full financing, or incremental construction by developers.
ADVANTAGES OF APPROVAL
Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians.
The use of street impact fee funds enables the community to leverage the available State Urban transportation funds to complete
other projects and address more of the city’s pressing transportation needs.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current
cost estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
60% - Street Impact Fees 40% SID or other funding.
New
Replacement
Equipment
Project
99
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF09
DEPARTMENT
STREET IF
PROJECT NAME
KAGY (WILLSON TO 19TH)
FY12 FY13 FY14
$650,000
FY15
$6,000,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
Widen Kagy Boulevard and add turning lanes at key intersections. This portion of Kagy currently carries about 12,000 vehicles
per day.
The capacity this two lane street can reasonably carry is about 12,000 vehicles per day. Expansion of capacity will be needed in
the foreseeable future to handle current and future traffic loads.
Kagy serves as an important element of Bozeman's perimeter street system connecting Highland Blvd., Willson Ave. and S.19th. It
also serves as the primary access to Montana State University and the University's major athletic facilities.
ALTERNATIVES CONSIDERED
Pursue the use of Urban Funds.
ADVANTAGES OF APPROVAL
Kagy is a State Urban Route and is eligible for expenditure of State urban funds designated annually for the City of Bozeman;
however, the availability of urban funds cannot match the pace of the City's transportation improvement needs.
The need for this project comes from increased traffic due to growth in the Bozeman area and the project is eligible for Impact
Fee Funds. Use of Street Impact Funds enables the community to leverage the available State Urban transportation funds to
complete projects and address more of its pressing transportation needs.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current
cost estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
Total Project: $6,650,000. 60% - Street Impact Fees = $3,990,000; 40% - Urban Funds = $2,660,000
New
Replacement
Equipment
Project
100
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF19
DEPARTMENT
STREET IF
PROJECT NAME
INTERSECTION CONTROL: 27TH & OAK
FY12
$500,000
FY13 FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Control of the intersection of 27th Avenue and Oak Street, a collector and an arterial. Recent development proposals indicate
that the need for this improvement will soon be warranted.
If a signal is chosen, there may be some emergency maintenance/repair events should the signal fail per an existing agreement
with MDT, but in general this will be an MDT maintained signal.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by the Montana Department of Transportation. Create an SID or identify
and apply for other potential sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
101
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF20
DEPARTMENT
STREET IF
PROJECT NAME
INTERSECTION CONTROL: 7TH & KAGY
FY12 FY13 FY14 FY15 FY16 Unscheduled
$540,000
DESCRIPTION OF PROJECT
Control of the intersection of 7th Avenue and Kagy, a collector and an arterial. Recent development proposals indicate that the
need for this improvement will soon be warranted.
If a signal is chosen, there may be some emergency maintenance/repair events should the signal fail per an existing agreement
with MDT, but in general this will be an MDT maintained signal.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by the Montana Department of Transportation. Create an SID or identify
and apply for other potential sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
102
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF21
DEPARTMENT
STREET IF
PROJECT NAME
GRAF STREET CONNECTION
FY12 FY13 FY14 FY15 FY16 Unscheduled
$1,000,000
DESCRIPTION OF PROJECT
This project is to extend Graf Street approximately ¼ mile in order to connect the street to allow through traffic to flow east
from 19th Avenue.
This is an important connection for public safety purposes – allowing fire service to meet their response time requirements in
areas where they currently cannot.
ALTERNATIVES CONSIDERED
Do nothing and wait for development to connect the street.
ADVANTAGES OF APPROVAL
Improved traffic flow and better emergency response to the local area.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost
estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
100% Street Impact Fee – to be recovered by developer payback.
New
Replacement
Equipment
Project
103
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF22
DEPARTMENT
STREET IF
PROJECT NAME
INTERSECTION CONTROL: COLLEGE & 8TH
FY12 FY13 FY14 FY15 FY16 Unscheduled
$750,000
DESCRIPTION OF PROJECT
nstall improved control (roundabout or signal) at the intersection of West College Street and 8th Avenue, a minor arterial and a
collector. This intersection has seen steadily increasing demand with the growth of MSU. The Draft 2007 Transportation Plan
Update indicates that LOS issues are beginning to appear at this intersection.
If a signal is chosen as the improvement, there may be some emergency maintenance/repair events should it fail per an existing
agreement with MDT, but in general this would be an MDT maintained signal.
This intersection improvement project will be identified as TSM 18 in the 2007 Greater Bozeman Area Transportation Plan
Update.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by the Montana Department of Transportation. Create an SID or identify
and apply for other potential sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
104
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF23
DEPARTMENT
STREET IF
PROJECT NAME
HIGHLAND BLVD (MAIN STREET TO KAGY BLVD.)
FY12 FY13 FY14 FY15 FY16 Unscheduled
$7,600,000
DESCRIPTION OF PROJECT
This project consists of widening Highland Boulevard from the intersection with Main Street to the intersection with Ellis Street
to a five-lane urban arterial standard, and from the intersection with Ellis Street south to the intersection with Kagy Boulevard to
a three-lane urban arterial standard. This roadway is currently a minor arterial roadway with one travel lane in each direction.
This project serves as a long-term need that will be necessary to accommodate future development patterns in the region and
serve north-south traffic flow. It is expected that a minimum of two travel lanes in each direction from Main Street to Ellis Street,
one travel lane in each direction from Ellis Street to Kagy Boulevard, bike lanes on each side, curb and gutter, boulevard,
sidewalk, and a raised median will be required.
ALTERNATIVES CONSIDERED
Use of Urban Funds, developer constructed or creation of an SID for full financing.
ADVANTAGES OF APPROVAL
Increased capacity and safety in this corridor, both for motorized vehicles as well as bicycles and pedestrians. The use of street
impact fees enables the community to leverage the available State Urban Funds to complete other needed projects.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current
cost estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
Estimated: 50% Street Impact fees ($3,600,000.00), and 50% Urban Funds, Special Improvement District (SID) or Other,
$3,600,000.00.
New
Replacement
Equipment
Project
105
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF24
DEPARTMENT
STREET IF
PROJECT NAME
INTERSECTION CONTROL: HIGHLAND AND ELLIS STREET
FY12 FY13 FY14 FY15 FY16 Unscheduled
$500,000
DESCRIPTION OF PROJECT
Identified as TSM -20 in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other
adequate traffic control device when warrants are met. Highland Boulevard is currently a two-lane minor arterial roadway and
Ellis Street is a two-lane local street. This intersection currently has stop control on Ellis Street.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by MDT. Create an SID or identify other and apply for other potential
sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs:
None
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
106
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF25
DEPARTMENT
STREET IF
PROJECT NAME
INTERSECTION CONTROL: HIGHLAND AND KAGY
FY12 FY13 FY14 FY15 FY16 Unscheduled
$750,000
DESCRIPTION OF PROJECT
Identified as TSM -9 in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other adequate
traffic control device when warrants are met. Highland Boulevard is currently a two-lane minor arterial roadway and Kagy
Boulevard is a two-lane principal arterial.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by MDT. Create an SID or identify other and apply for other potential
sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs:
None.
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
107
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF26
DEPARTMENT
STREET IF
PROJECT NAME
INTERSECTION CONTROL: CHURCH AND KAGY
FY12 FY13 FY14 FY15 FY16 Unscheduled
$750,000
DESCRIPTION OF PROJECT
Identified as TSM - 8 in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other
adequate traffic control device when warrants are met. This intersection currently has stop control on Church Street. Kagy
Boulevard is a two-lane principal arterial and Church Street is a two-lane collector. Current LOS analysis shows that this
intersection fails during Am and PM peak hours due to excessive delay on the north and south bound approaches.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by MDT. Create an SID or identify other and apply for other potential
sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs:
None
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
108
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF27
DEPARTMENT
STREET IF
PROJECT NAME
INTERSECTION CONTROL: COTTONWOOD ROAD & DURSTON AVE
FY12 FY13
$500,000
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Includes installation of a traffic signal, roundabout or other adequate traffic control device when warrants are met. Cottonwood
Road is currently a two-lane principal arterial roadway and Durston Road is a three-lane minor arterial.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by MDT. Create an SID or identify other and apply for other potential
sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs:
None
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
109
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF28
DEPARTMENT
PROJECT NAME
NORTH 27TH STREET (OAK TO TSCHACHE)
FY12 FY13 FY14 FY15 FY16 Unscheduled
$200,000
DESCRIPTION OF PROJECT
This project is the completion of the half-street section of North 27th that currently does not exist (preventing full utilization of
an important part of North 27th Street.) Estimated length of 0.3 miles, half-street section.
ALTERNATIVES CONSIDERED
Do nothing.
ADVANTAGES OF APPROVAL
Connected drive lanes on this part of North 27th Street
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
110