Loading...
HomeMy WebLinkAboutAdopt the Water Fund within the Capital Improvemenent Plan.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Chris Kukulski, City Manager Anna Rosenberry, Finance Director SUBJECT: Adoption of the Capital Improvements Plan (CIP) for 2012-2016 – WATER FUND Item Type: Consent MEETING DATE: December 13, 2010 RECOMMENDATION: Adopt the attached Water Fund Capital Improvements Plan for 2012-2016. BACKGROUND: On November 29, 2010, we presented the attached Water Fund capital improvement plan. At that time, public comment and commissioner input was sought. · At that time, it was noted that the schedule contained incorrect dollar amounts for the Water Treatment Plant project on page 2 of the CIP details. As a result of that meeting, we have updated the schedule on page 2 and submit it for your approval tonight. FISCAL EFFECTS: Once adopted, the Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for FY12. ALTERNATIVES: As suggested by the City Commission. Report compiled on: December 6, 2010 158 Water FundCapital Improvement PlanFinancial Summary Current YearFY11 FY12 FY13 FY14 FY15 FY16Projected Beginning Reserve Balance Dedicated to CIP 8,637,261$     3,375,761$         3,804,517$     1,363,976$    2,904,498$  3,357,630$      Plus:  Water Revenues Dedicated to CIP 1,483,500$     1,530,972$         1,579,963$     1,630,522$    1,663,132$  1,696,395$      Plus:  WTP Loan Proceeds9,000,000$         7,000,000$       Less:  Scheduled CIP Project Costs (6,745,000)$    (10,102,216)$     (11,020,504)$  (90,000)$        (1,210,000)$ (90,000)$        Projected Year‐End Cash Dedicated to CIP 3,375,761$     3,804,517$         1,363,976$     2,904,498$    3,357,630$  4,964,025$    Assumptions Made for Revenue Estimates: Current YearFY11 FY12 FY13 FY14 FY15 FY16Estimated Annual Water Revenues 5,750,000$       5,934,000$          6,123,888$       6,319,852$     6,522,088$   6,652,529$       Estimated Annual Increase 3.2% 3.2% 3.2% 3.2% 2% 2%Total Estimated Revenues 5,934,000$       6,123,888$          6,319,852$       6,522,088$     6,652,529$   6,785,580$     Current Revenues Dedicated to CIP % 25.0% 25.0% 25.0% 25.0% 25.0% 25.0%  Plus:  Increase Dedicated to CIP 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%  Total % Dedicated to CIP 25.0% 25.0% 25.0% 25.0% 25.0% 25.0%ProjectedProjectedTotal Estimated Revenues Dedicated to CIP1,483,500$       1,530,972$          1,579,963$       1,630,522$     1,663,132$   1,696,395$     12,000,00010,000,0008,000,0006,000,0004,000,0002,000,0000Water Fund Projects & Equipment 159 CIP PROJECT FUNDPROJ.DEPARTMENPROJECT NAMEFY12FY13FY14FY16UnscheduledFY15Water FundPW01WATER OPSSHOPS FACILITY EXPANSION PLAN$10,000PW02Water OPSLAUREL GLEN SHOP ANNEX ‐ Phase 1$100,000W03WATER OPSENGINEERING/DESIGN for BIANNUAL WATER SYSTEM UPGRADES$90,000$90,000$90,000W04WATER OPSWATER SYSTEM UPGRADES BIANNUAL$1,100,000$1,210,000W07WATER PLANTWATER TREATMENT PLANT 22MG MEMBRANE PLANT$9,800,854$9,800,854W12WATER OPS1 TON TRUCK WITH HOIST$46,794W16WATER OPSBACKHOE$111,362W17WATER OPS1/2 TON TRUCK$37,856WW23WATER OPSMINI EXCAVATOR & TRAILER$25,000Summary for  Water Fund (9 items)Totals by year:$10,102,216 $11,020,504 $90,000 $1,210,000$90,000FY12FY13FY14FY15FY16Unscheduled160 CIP Project Fund Water Fund PROJECT NUMBER PW01 DEPARTMENT WATER OPS PROJECT NAME SHOPS FACILITY EXPANSION PLAN FY12 FY13 $10,000 FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements are made to the Shop at Rouse and Tamarack Street for the remaining divisions. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000). New Replacement Equipment Project 161 CIP Project Fund Water Fund PROJECT NUMBER PW02 DEPARTMENT Water OPS PROJECT NAME LAUREL GLEN SHOP ANNEX - Phase 1 FY12 $100,000 FY13 FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT To upgrade current facility which is basically an unheated pole barn with electricity to a insulated heated facility which can house vehicles. We see this facility operating as an important geographic storage area, as it is located on the opposite side of town from the current Shops location. In the first phase installation of insulation and heat, landscaping, sidewalks, well for irrigation and paving. Future phases may include finishing for office and restrooms, automated water fill station, etc. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Fuel savings in having vehicles stationed on the west side of the city, quicker response times to the surrounding area, frees up room at existing shop complex. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: $5,000.00 to $6,000.00 FUNDING SOURCES 50% Water Fund 50% Sewer Fund New Replacement Equipment Project 162 CIP Project Fund Water Fund PROJECT NUMBER W03 DEPARTMENT WATER OPS PROJECT NAME ENGINEERING/DESIGN for BIANNUAL WATER SYSTEM UPGRADES FY12 $90,000 FY13 FY14 $90,000 FY15 FY16 $90,000 Unscheduled DESCRIPTION OF PROJECT This item provides for design work to be completed every-other year, in anticipation of the Bi-Annual System Upgrades. We alternate funding of design work and construction work within the CIP. As the Water Operations Division operates the existing system, maintenance projects become apparent. Given our knowledge of system conditions today, the following projects are candidates for design funding and were identified in the Facility Plan: 1. South 8th Avenue , 2. Koch: Lindley to Bozeman, 3. Lindley: Olive to Koch, 4. S. Bozeman: Olive to Story As annual operations occur, other more-urgent projects may be identified and designed under this project heading. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the design of necessary water system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Water Utility Fund New Replacement Equipment Project 163 CIP Project Fund Water Fund PROJECT NUMBER W04 DEPARTMENT WATER OPS PROJECT NAME WATER SYSTEM UPGRADES BIANNUAL FY12 FY13 $1,100,000 FY14 FY15 $1,210,000 FY16 Unscheduled DESCRIPTION OF PROJECT This item provides for construction to be completed every-other year, after the Bi-Annual Engineering Design. We alternate funding of design work and construction work within the CIP. As the Water Operations Division operates the existing system, maintenance projects become apparent. Given our knowledge of system conditions today, the following projects are candidates for construction funding and were identified in the Facility Plan: 1. South 8th Avenue , 2. Koch: Lindley to Bozeman, 3. Lindley: Olive to Koch, 4. S. Bozeman: Olive to Story As annual operations occur, other more-urgent projects may be identified and designed under this project heading. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the construction of necessary water system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500 per water-main mile maintained annually. FUNDING SOURCES 100% Water Utility Fund New Replacement Equipment Project 164 CIP Project Fund Water Fund PROJECT NUMBER W07 DEPARTMENT WATER PLANT PROJECT NAME WATER TREATMENT PLANT 22MG MEMBRANE PLANT FY12 $9,800,854 FY13 $9,800,854 FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT This new Membrane Filter Treatment Plant is the preferred water treatment alternative identified in the adopted Water Facility Plan. It is recommended to be built with an initial configuration providing 22MGD of water treatment capacity, with future expansion capability to 36MGD. This addresses both the 10- and 20- year capacity requirement forecast for the City’s water treatment system. It is expected to be online by October 2013. The current 15MGD WTP equipment is nearing the end of its useful life; the plant’s direct filtration treatment process, while effective most of the year, becomes only marginally effective during spring runoff or flash thunderstorms in the watershed, dropping plant efficiency as low as 70%; and, rapid population growth and expansion of city water services is increasing demand for water. The current plant capacity may be exceeded in as few as five years. ALTERNATIVES CONSIDERED The Water Facility Plan considered numerous alternatives for water treatment. This was identified as the preferred alternative in the adopted plan. ADVANTAGES OF APPROVAL Planning for increased water supply to meet growing demands and to replace existing equipment that is at the end of its useful life. The New Plant will be located at the current site in a 49,620 sf building located directly north of the plant. It will include pre- oxidation, coagulation, flocculation, settling, strainers, membrane flitration, dissolved air flotation thickeners, disinfection, PH adjustment for corrosion control, drying beds, lagoon, and ancillary facilities. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This plant is not estimated require an addition to existing plant staff. Annual O&M costs = est. $1,735,901 (including existing staff plus new plant expenses). None of these costs can be paid with Impact Fees. FUNDING SOURCES The most recent estimate of plant costs was provided in the Fall of 2010, at a total of $40.7 Million. It is estimated that 33% of total project costs (approx $13.4 Milion) are related to capacity expansion of the plant, and therefore are eligible for impact fee funding. TOTAL PROEJCT: FY08 Pilot Testing: $200,000. FY09,FY10, FY11 Design and Membrane equipment deposit, construction $7,267,000. FY12 $16,460,000. FY13 $16,460,000. New Replacement Equipment Project 165 CIP Project Fund Water Fund PROJECT NUMBER W12 DEPARTMENT WATER OPS PROJECT NAME 1 TON TRUCK WITH HOIST FY12 FY13 $46,794 FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT This request replaces asset # 2914, a 2001 Dodge 1-ton with a 1-ton truck with a hoist. This truck is used daily in both water and sewer operations to transport personnel and equipment, and responds to water and sewer line emergencies. This particular truck has proven to be a very unreliable vehicle; the transmission has been replaced twice. Because of reliability problems and maintenance costs, we are recommending replacing this vehicle sooner than customary. Flex Fuel Vehicles will be purchased. ALTERNATIVES CONSIDERED Keep the trucks and spend maintenance dollars to have truck serviceable ADVANTAGES OF APPROVAL Advantages to the City for approving this request include savings on fuel. The new vehicles will improve safety of crews, there would be lower repair costs and it would help maintain current operations levels. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Water Utility Fund New Replacement Equipment Project 166 CIP Project Fund Water Fund PROJECT NUMBER W16 DEPARTMENT WATER OPS PROJECT NAME BACKHOE FY12 $111,362 FY13 FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT This vehicle replaces current asset #2633, a 1999 John Deere backhoe with 2168 hours on it. This hoe is used primarily for compacting ditches, loading trucks with material and does not have an extendable boom. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff and water operations. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Operating and repair costs are expected to be lower than the existing vehicle. FUNDING SOURCES 100% Water Fund New Replacement Equipment Project 167 CIP Project Fund Water Fund PROJECT NUMBER W17 DEPARTMENT WATER OPS PROJECT NAME 1/2 TON TRUCK FY12 FY13 $37,856 FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT This vehicle replaces current asset #2647, a 1998 Chevy 4x4. It will be replaced once it approaches 100,000 miles, estimated to be FY13. This truck is used in our water valve operation program and is used in various light duty jobs. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff and water operations. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Operating and repair costs are expected to be lower than the existing vehicle. FUNDING SOURCES 100% Water Fund New Replacement Equipment Project 168 CIP Project Fund Water Fund PROJECT NUMBER WW23 DEPARTMENT WATER OPS PROJECT NAME MINI EXCAVATOR & TRAILER FY12 FY13 $25,000 FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT This piece of equipment due to it’s small size, is very useful in excavating where the backhoe cannot fit or due to it’s weight will damage sidewalks and lawns. This purchase of equipment and trailer will also be shared with the Streets Department. ALTERNATIVES CONSIDERED Continue to rent this piece of equipment ADVANTAGES OF APPROVAL Give’s both the Water and Street Departments a piece of equipment that can work in small spaces ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than a normal size backhoe FUNDING SOURCES Total Cost $75,000, split 3-ways between Water Fund, Wastewater Fund, and Street Maintenance Fund ($25,000 each.) New Replacement Equipment Project 169