HomeMy WebLinkAboutResolution 4301 Change Order 1, College / Huffine Shared use pathway, Duneman ConstructionWHEREAS, the City Commission did, on the 23" day of August 2010. authorize award of the bid for the Construction of the College I-luffine Shared Use Pathway. to DUDeman Construction, Belgrade, Montana and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and or plans of the contract be made by resolution and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of I Bozeman, Montana, that the proposed modifications and or alterations to the contract between the City of Bozeman, a municipal corporation, and Duneman Construction. Belgrade, Montana, as contained in Change Order 41, attached. hereto. be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City: and the City Clerk is authorized and directed to attest such signature. 1 oft PASSED AND ADOPTED by the City Commission of the City of Bozeman. Montana. at a regular session thereof lield on the 29"' day of November. 2010, F 'K.K AU S ATTEM: S ULI 'Ic Ci Y C J;N ck) APPROVED AS TO FORM: City 1 Page 2 of 2 PROJECT TITLE: RPA PROJECT NO.: 08506,000 CHANGE ORDER NUMBER: 01 CTEP PROJECT WO.: DATE OF CHANGE ORDER: October 14, 2010 CONTRACT DATE: September 3, 2010 / Notice to Proceed: October4,2010 OWNER: City of Bozeman CONTRACTOR: Duneman Construction, Inc. Change orders must be accompanied by an itemized cost breekdown, i.e.: unit prices, negotiated lump sum prices negotiated cost plus basis. Note all nno pmep�cingtobe«uppo�edbydocumont�ionwh�hnuppo�n the cos of that Item Description Quantity Units Unit Price Amou - nt Basis of Unit Price Number 1 Additional (�Y � 2.7 - 1 +$572.00 Derived from - Schodule of Clear/Grub/Excavation Values 2 Non-Removal USDA Sign 1 Each - $55.00 (455,00) Bid Item 11 3 Non- Install USDA Sign 1 Each $42500 (-$425.00) - 6 7 id - 1tem 10 4 Remove Thickened Sidewalk 65 SY $3,50 +$2,236.50 Bid IteM portioned 5 Relocate Qwest Phone Line I LS _ $1,72&00 +$1,728.00 Negotiated LS Cost 6 Muck Excavation in Front of 360 CY $4.50 +$1,620.00 Negotiated Chronicle Building 1 Geotextile 8 Import/Place Pitrun 360 CY - �l - 800 +$6,48000 Negotiated JUST OF CHANGE ORDER: Items 1-3: Work Directive Change to shift path alignment on Align "A". east oY Ferguson 10 eliminate having toremove and relocate the USDA sign m1 Station 24+48. Alignment shift from approximate Station 22+50to25+5O. Shifting 2' south off of planned a|ignm»entcreated estimated 45 cubic yards (CY)ofadd�iVna|�eah ~ clearing, and -- Based on the Schedule cdV�ueo and Enginee�neubmateofoverall ec1excavation, a $l2.71/CumM was excavation. derived. The alignment shift eliminated having to remove one sign (USDA) install new (USDA). met work cost Items 1-0=*$8��OU. The work is deemed approphoteao the USDA undem�ndand approved the planned sign relocation, but preferred notand shifting the alignment sUQhVyimproved pn�ectschedule bylimhingir�getiomimpacts, Item 4; Throughout Alignment "A" the Contractor encountered thickened concrete sidewalk over and above typical installation standard of 6" thick for a sidewalk to allow vehicle access (City of Bozeman and Montana Public Works (MPW) standards), The sidewalk removed averaged 8 inches thick thus slowing the process of sidewalk removal, and increasing disposal costs. An 8"16" ratio is applied (or +33% volume increase), for a net cost of +$3.50 per square yard (SY) greater than the $10.75 per SY bid to remove 6" thick concrete sidewalk, Net work cost = +$2,23650 Item 5: Contractor encountered a Qwes phone line (marked un plans) within the planned excavation limits running longitudinally along Afignment "B" in front nf the Bozeman Daily Chronicle. The depth was much shallower than typical installation, et about 8~-18~ below bottom ofsidewalk, Expectations are that this utility should have been abmut38" below grade per standards, Am the line vves in direct conf|i�vviththe work and needed tmbebuhed deeper to Change Order Page 1 SURETY CONSENT The surety hereby consents to the aforementioned contract change order and agrees that its bond or bonds shall apply and the extend to the contract as thereby modified or amended per this change order. The principal and the surety further agree that on or after execution of this consent, the penalty of the applicable performance bonds or bonds is hereby increased by $ (100% of the change order amount) and the penalty of the applicable labor and material bond or bonds is hereby Increased by $ _ (100% of the change order amount). COUNTERSIGNED BY MONTANA RESIDENT AGENT SURETY 0 Seal (Engineer) Recommer (Contractor) Accepted (Owner) Approved by.. 2 - 0 - 1L — / —L a Bate Z Z gate Date Change Order Rage 3