Loading...
HomeMy WebLinkAboutResolution 3597 Authorize City Manager to sign Change order 1, 2002 Water Renovations COMMISSION RESOLUTION NO. 3597 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH CHIEF CONSTRUCTION SPECIAL TIES, INC., BilLINGS, MONTANA. WHEREAS, the City Commission did. on the 24th day of June 2002, authorize award of the bid for the 2002 Water Renovation Project to Chief Construction Specialties, Inc., Billings, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Chief Construction Specialties, Inc., as contained in Change Order No.1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change orders for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 19th day of May 2003. ATTEST: slTOd~.Z~ ~J~ R IN L. SULLIVAN Clerk of the Commission . fiUJr@[r.n\\Llli\~ j Ui ' HKM Engineering Inc. .! (il MA'( 2 1 2D03 :)\ I , 'j' ; 'J,-.- \""""""'-"-"T'ft:..,JjJ CHANGE ORDER '.,,;, \..' t"":J '--.} i.. :'~"~ ~,J ~},,<,-J L~ L': ~ - - .. .'. .- TO: Mr. Rick Hixson Change Order No: 1 City of Bozeman Date: March 31, 2003 PO Box 640 Project No.: 04M 229.134 Bozeman, MT 59771-0640 ConrractFor:C.O.B.VVater 2002 Renovation Project It has been detennined necessary and in the best interest of the OWNER to modify certain portions of the PROJECf above and the CONTRACf dated July 30. 2002, and in accordance with Article 10 of the General COnditions. The following changes are hereby agreed to: DESCRIPTION: . Reconciling Change Order for as-built quantity adjustments. Adjustments include owner-requested changes to plans including extending water mains on Bozeman, Montana, Rouse, and Wallace Avenues, in addition to new fire and domestic lines to the US Bank Building on Black Ave. As-built quantity adjustments are presented as an attachment to this change order entitled RECONCILING CHANGE ORDER - Exhibit A. . Adjustment to contract time for requested weather days. ATIACHMENTS: . RECONCILING CHANGE ORDER ~ Exhibit A . Chief Construction letters dated September 18, 2002 & November 4, 2002 Not valid until signed by both the Owner and Engineer. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Original Contract Sum was $ 605.081.00 Net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 605.081.00 The Contract Sum will be (increased) by this Change Order $ 52.218.50 The new Contract sum including this Change Order will be $ 657 .299.50 The Contract Time will be (increased) by i. days The Date of Substantial Completion as of the date of this Change Order therefore is November 8. 2002 G:\04\M229.134\Work Directives & CO's\Change Order 1. doc , . . CONTRACTOR: ENGINEER: Ck., ~+ )~(I~ ~t HKM Engineering Inc. Name N~ By: ~~ By: (LI 6iL (' Representative -~(~ S" E",IJ 0 IL 5J [", "J EE IL Title Title APPROVED: OWNER By:- --l 1 Representati ve Lvl'f N\~~'R- Title G:\04\M229.134\Work Directives & CO's\Change Order 1. doc ...._....__n_ , . 04M229_134 City of Bozeman Water Ranovation Project RECONCILING CHANGE ORDER EXHIBIT A BASE BID ITEM DESCRIPTION ORIGINAL FINAL QUANTITY UNIT UNIT ADJUSTED QUANTITY QUANTITY ADJUSTMENT PRICE AMOUNT 101 Mobilization/Demobilization 1 1 0 LS $28,000.00 $0.00 102 Taxes, Bonds, Insurance 1 1 0 LS $50,000.00 $0.00 103 3" to 6" Water Main 123 142.5 19.5 LF $35.00 $682.50 104 8" Water Main 2506 2696 190 LF $45.00 $8,550.00 105 8" MJ Pipe CL52, Restrained Joint 220 170 -50 LF $45.00 -$2250.00 106 12" Water Main 1834 1908 74 LF $52.00 $3,848.00 107 3" to 6" Gate Valve 9 10 1 EA $1,000.00 $1,000.00 108 8" Gate Valve 14 15 1 EA $1 200.00 $1,200.00 109 10" Butterfly Valve 2 2 0 EA $1 400.00 $0.00 110 12" Butterflv Valve 5 5 0 EA $1 800.00 $0.00 111 16" Butterflv Valve 1 2 1 EA $2 200.00 $2 200.00 113 4" to 8" Tee- All Sizes 5 7 2 EA $500.00 $1,000.00 115 10" to 12" Tee~ All Sizes 6 9 3 EA $700.00 $2 100.00 116 16" to 10" Cross 2 2 0 EA $1 100.00 $0.00 117 8" Cross 2 2 0 EA $800.00 $0.00 121 4" to 8" Bend-- All Angles 20 16 -4 EA $400.00 -$1 600.00 122 10" to 12" Bend-- All Angles 11 13 2 EA $600.00 $1,200.00 124 8" Reducer-- All Sizes 3 5 2 EA $400.00 $800.00 125 10" Reducer - All Sizes 0 0 0 EA $0.00 $0.00 126 12" Reducer - All Sizes 2 2 0 EA $600.00 $0.00 128 3" to 6" Water Main Connection 4 13 9 EA $1 200.00 $10800_00 129 8" Water Main Connection 9 2 -7 EA $1,400.00 -$9 800.00 130 10" Water Main Connection 2 2 0 EA $1,600.00 $0.00 131 12" Water Main Connection 2 0 -2 EA $1,800.00 -$3,600.00 132 16" Water Main Connection 2 2 0 EA $2,200.00 $0.00 133 Plug and Thrust Block Water Main 1 3 2 EA $500.00 $1,000.00 134 Install or Remove blow-off Assemblv 2 2 0 EA $1,200.00 $0.00 135 New Fire Hvdrant 8 8 0 EA $2 800.00 $0.00 136 Remove Existina Fire HYdrant 4 5 1 EA $500.00 $500.00 137 Near Side Water Service Connection 16 12 -4 EA $400.00 -$1 600.00 138 Far Side Water Service Connection 13 7 -6 EA $900.00 -$5,400.00 139 New Water Service Lines 178 65 -113 LF $18.00 -$2,034.00 140 Curb Stop 1 3 2 EA $300.00 $600.00 147 12" Storm Drain Pipe 130 239 109 LF $34.00 $3,706.00 149 Storm Drain Inlet 1 5 4 EA $1,500.00 $6,000.00 157 Storm Sewer Lateral Crossina 13 18 5 EA $300.00 $1,500.00 158 Water Service & San. Sewer Service Crossing 19 10 -9 EA $300.00 -$2,700.00 159 Underaround Utllitv Crossina 15 40 25 EA $300_00 $7 500.00 160 Exploratorv Excavation 18 17.5 -0.5 HR $500.00 -$250.00 161 Rigid Insulation Blanket 704 1170 466 SF $8.00 $3,728.00 166 Traffic Control 1 1 0 LS $30,000.00 $0.00 169 Additional Traffic Control Devices 585 438 -147 UNITS $2_00 -$294.00 170 Asphalt surface Restoration-- Tvpe I 3030 3629 599 LF $12.00 $7,188.00 171 Gravel Surface Restoration 1070 1035 -35 LF $12.00 -$420.00 184 Grass Surface Restoration 4955 4400 -555 SF $2.00 -$1,110.00 188 Concrete Sidewalk Restoration 301 447 146 SF $14.00 $2,044.00 189 Curb and Gutter Restoration 176 791 615 LF $18.00 $11,070.00 193 PavemenU Lane Markina Restoration 1 0 -1 LS $4 500.00 -$4 500_00 194 Signal Detector Loops 2 2 0 EA $4,000.00 $0.00 195 Rip Rap 105 110 5 TON $40.00 $200.00 196 Flowable Fill 140 260 120 CY $78.00 $9,360.00 BASE BID TOTAL INCREASE $62,218.50