Loading...
HomeMy WebLinkAboutResolution 4297, Change Order 1 for 2008 Lamme Water Main Replacement Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: 2008 Lamme Water Main Replacement Project – Change Order No. 1. MEETING DATE: November 1, 2010 AGENDA ITEM TYPE: Consent. RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign 2008 Lamme Water Main Replacement Project – Change Order No. 1. BACKGROUND: Attached is a copy, of change order number 1 for the above referenced project. The water service at Hawthorne School had to be replaced as part of the project because it was found to be an old lead service. Although there was a unit price to cover replacement of water service lines in the contract, this installation was almost entirely under concrete. This was above and beyond what was contemplated by the unit priced item. The change is only for the replacement cost of the concrete. No change in contract time is being provided with this change. The Substantial and Final Completion Contract Times are not changed. The final recommended increase in cost and time extension for this change is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: The project bid was $411,155.00 under the budget, so even with this change, the project will still be well within budget. Attachments: Change Order No. 1 Resolution 4297 Report compiled on: October 18, 2010 41 42 43 44 1 of 2 COMMISSION RESOLUTION NO. 4297 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH OMDAHL EXCAVATION & UTILITIES, INC., BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 28th day of July 2008, authorize award of the bid for the 2008 Lamme Water Main Replacement project, to Omdahl Excavation & Utilities, Inc., Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Omdahl Excavation & Utilities, Inc., as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 45 Resolution No. 4295, Change Order 1 for WRF Digester No. 3 & Solids Dewatering 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 1st day of November 2010. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 46