HomeMy WebLinkAboutResolution No. 4295, Change Order 1 for Water Rec. Facility, Digester 3.pdf Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Bob Murray, Project Engineer
Rick Hixson, City Engineer
Chuck Winn, Assistant City Manager
SUBJECT: Bozeman Water Reclamation Facility, Digester No. 3 and Solids
Dewatering Building Project – Change Order No. 1.
MEETING DATE: October 25, 2010
AGENDA ITEM TYPE: Consent.
RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign
Bozeman Water Reclamation Facility, Digester No. 3 and Solids Dewatering Building Project –
Change Order No. 1.
BACKGROUND: Attached is a copy, of change order number 1 for the above referenced
project. This change order includes nine items. Four of the items are credits while the other five
are additions. Pages two and three of the document titled “Change Order No. 1 Summary”
provides a short description of each of the items involved with this change. Additionally, the
remainder of the document contains the detailed backup cost information for each item. No
change in contract time is being provided with this change.
The Substantial and Final Completion Contract Times are not changed. The final recommended
increase in cost and time extension for this change is reasonable and commensurate with the
work involved.
UNRESOLVED ISSUES: None
ALTERNATIVES: As suggested by the City Commission.
FISCAL EFFECTS: Overall this change order increases the contract amount by $22,826.10
from $5,298,965.00 to $5,321,791.10. This will decrease the contingency on the project from
$465,304.35 to $442,478.25.
Attachments: Change Order No. 1
Resolution 4295
Report compiled on: October 6, 2010
53
1 of 2
COMMISSION RESOLUTION NO. 4295
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT
WITH MCALVAIN CIVIL CONSTRUCTORS, INC., BOISE, IDAHO.
WHEREAS, the City Commission did, on the 17th day of February 2010, authorize award of the bid
for the Bozeman WRF Digester No. 3 and Solids Dewatering project, to McAlvain Civil Constructors, Inc.,
Boise, Idaho; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and/or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a
municipal corporation, and McAlvain Civil Constructors, Inc., as contained in Change Order No. 1, attached
hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to
execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed
to attest such signature.
54
Resolution No. 4295, Change Order 1 for WRF Digester No. 3 & Solids Dewatering
2 of 2
PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a
regular session thereof held on the 25th day of October 2010.
__________________________________________
JEFFREY K. KRAUSS
Mayor
ATTEST:
________________________________________
STACY ULMEN, CMC
City Clerk
APPROVED AS TO FORM:
_____________________________________________
GREG SULLIVAN
City Attorney
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112