HomeMy WebLinkAboutResolution No. 4295, Change Order 1 for Water Rec. Facility, Digester 3.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: Bozeman Water Reclamation Facility, Digester No. 3 and Solids Dewatering Building Project – Change Order No. 1. MEETING DATE: October 25, 2010 AGENDA ITEM TYPE: Consent. RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign Bozeman Water Reclamation Facility, Digester No. 3 and Solids Dewatering Building Project – Change Order No. 1. BACKGROUND: Attached is a copy, of change order number 1 for the above referenced project. This change order includes nine items. Four of the items are credits while the other five are additions. Pages two and three of the document titled “Change Order No. 1 Summary” provides a short description of each of the items involved with this change. Additionally, the remainder of the document contains the detailed backup cost information for each item. No change in contract time is being provided with this change. The Substantial and Final Completion Contract Times are not changed. The final recommended increase in cost and time extension for this change is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Overall this change order increases the contract amount by $22,826.10 from $5,298,965.00 to $5,321,791.10. This will decrease the contingency on the project from $465,304.35 to $442,478.25. Attachments: Change Order No. 1 Resolution 4295 Report compiled on: October 6, 2010 53 1 of 2 COMMISSION RESOLUTION NO. 4295 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH MCALVAIN CIVIL CONSTRUCTORS, INC., BOISE, IDAHO. WHEREAS, the City Commission did, on the 17th day of February 2010, authorize award of the bid for the Bozeman WRF Digester No. 3 and Solids Dewatering project, to McAlvain Civil Constructors, Inc., Boise, Idaho; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and McAlvain Civil Constructors, Inc., as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 54 Resolution No. 4295, Change Order 1 for WRF Digester No. 3 & Solids Dewatering 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 25th day of October 2010. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112