HomeMy WebLinkAboutResolution 4287 City Shops/HRDC Bus Barn Change Order 14 with BN BuildersCOMMISSION RESOLUTION NO. 4287 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION /MODIFICATION OF CONTRACT WITH BN BUILDER'S, BOZEMAN, MONTANA, WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and lJRDC Bus Barn to BN Builders, Bozeman, Montana; and WHEREAS, Section 7 -5 -4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and /or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and /or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order 414, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Cleric is authorized and directed to attest such signature. 1 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 20th day of September, 2010. ATTEST: t '4J ' t ST 8 6Y UL w ° ,re m � � City Jerk U �N 0 APPROVED AS TO FORM: Page 2 of 2 dow8ng| sendhohn | architects Project: City Shops/ HRDC Bus Barn 1821 N. RouoeAve Bozeman, K8T5B715 To Contractor: BNBuilders, Inc 2086 Stadium Dr, Ste 102 Bozeman, KAT5g715 The Contract im changed umfollows: Increase Contract Sum. Date: August 18.2O1O Architect's Projec No: 08-265 Contract Date: November 4.2OO8 Contract For: General Construction Reason for change: Please see attached Summary uf Mechanical Change Orders Attachment(s): [P #26 CP#28 CP#28 CP#3O CP #34 CP#36 Total Contract Sum Adiustment: Owner Im Architect E Contrac M Field [] Other [] The original Contract Sum was The net change bypreviously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order by the amount of The new Contract Sum including this Change Order will bo $ Cily of Bozeman Contract Sum Adjustment: The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will bm increased by this Change Order by the amount of (80.0996 nf Total Change Order) The new Contract Sum including this Change Order will be HRDC. Contract Sum Admustment: The original Contract Sum was The net change bypneviouy�y authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased bythis Change Order by the amount of (1991Y6ofTota\Change[>nder) The new Contract Sum including this Change Order will bo 1 049,231.41 1,081 066.88 $ 858,368.59 $ 901,215.63 Contract Time Adiustment: The Contract Time will be increased by The date of Substantial Completion as of the date of this Change Order therefore is: 6ggust 15, 201 JOINT OWNER CHANGE ORDER Cost Breakout by Owner C.O. #14 Not valid until signed by Architect, Contractor, and Owners. Signatures: Architect: Dowling Sandholm, Architects Item Cost % COB 1 Cost COB % HRDC Cost �HRDC Sash Kazeminejad Sump and Strainer Valve (CP#26) $3,631,10 50.0 $1,815-55 50.0% $1,815.55 Bozeman, MT 59715 Unit Heater Change (CP #28) $2,167.72 100,0% $2,167.72 U% $0.00 Revised fresh air ductwork (CP #29) $7,516,19 50.0% $3,758.10 5U% $3,758.10 Bozeman, MT 59715 Shop Ceiling Fan (CP #30) $12,537.92 100.0% $12,537,92 U% $0.00 Additional Concrete at Rainwater Tank Slab (CP #34) $1,340.95 50,0 $670,$8 50.0% $670.48 Sand Storage Light Pole (CP 936) $4,168.68 100.0% $4,168.68 0,0% $0,00 Total L_131,362.56 80.09% $25,118.44 19.91% $6,244.12 Not valid until signed by Architect, Contractor, and Owners. Signatures: Architect: Dowling Sandholm, Architects By: _. f _� Date: 15 West 14' Street — Suite 103 Mike Wiseman Helena, Mt 59601 Place Architecture By: Date 118 E. Main St Sash Kazeminejad Bozeman, MT, 59715 Contractor: BN Builders, Inc By: Date: 2066 Stadium Dr,, Ste 102 11A&Vto Bozeman, MT 59715 Owner'. City of Bozeman By: 21�=—Dat,qzo-io P.O. Box 1230 Cris Kukulski Bozeman, IVIT 59771 Human Resource By Date: V Development Council Lee Hazelbake'r 32 South Tracy Bozeman, MT 59715 Page 2 of 2 File 21f 00414—Jointdoc