HomeMy WebLinkAboutChange Order 13, City Shops/HRDC Bus Barn, BN BuildersdmwUng | sandhobm | architects JOINT OWNER CHANGE ORDER Project: City Shops/ HR0C Bus Barn 1821 W. Rouse Ave Bozeman, MT 59715 To Contractor: BN Builders, Inc 2QG8 Stadium Dc, Ste 1Q2 Bozeman, 88TS871O The Contract im changed amfollows: Increase Contract Sum. Date: July 29, 2010 Owner M Architect M Amhheut!a Project No: 08'285 Contractor M Field [] Contract Date: November 4.2000 Other C] Contract For: General Construction Reason for change: After further review cf the City's dirt stockpile, it was determined that this material did not meet the specification for the intended purpose of providing sub-base material for road and parking areas. The Contractor has therefore requested funds te replace this quantity of dirt (CP#10) Work done in accordance with CCD #1 and CIP #4 was based on an estimated quantity of fill dirt for the building footings after the original excavation procedures were modified due tu poor and/or unknown soil conditions. Once work was completed, the total amount exceeded the estimated quantity by1SO cubic yards, While CP #4 was estimated at a "not to exceed" amount, the Architect feels this is a legitimate request from the contractor, The extra material was used and placed, and therefore represents a real value for the project, (CP#31) During the course of excavation and site preparation, unidentified concrete structures were encountered that required proper fill be imported and placed (CP#32) Attachment(s): CP#18 CP#31 CP #32 Total Contract Sum Adiunhmant The original Contract Sum was $____ The net change bypnev � �oueauthorized Change Orders ------ The Contract Sum prior bo this Change Order was $ The Contract Sum will be increased by this Change Order by the amount of -------- The new Contract Sum including this Change Order will be $ 1,9822 City of Bozeman Contract Sum Adjustme,nt- The original Contract Sum was The net change bypreviously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will bo increased by this Change Order by the amount of (6U%of Total Change Order) The new Contract Sum including this Change Order will be HRDC Contract Sum Adiustment: The original Contract Sum was The net change bypreviously authorized Change Orders The Contract Sum prior b» this Change Order was The Contract Sum will ba increased by this Change Order hy the amount of (5O%mf Total Change Order) The new Contract Sum including this Change Order will be $ 1,049231.41 $ 12,170A0 G-0. #13 Contract Time Adiustment: The Contract Time will be increased by zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is: August 15, 2010 Not valid until signed by Architect, Contractor, and Owners. Signatures: Architect: Dowling Sandholm Architects 15 West 10 Street – Suite 103 Helena, Mt 59601 Place Architecture 118 E. Main St Bozeman, MT, 59715 By: Al" Mike W 1se By: Date: - 71211 aVr? Sash 16zernin Contractor: BN Builders, Inc 2066 Stadium Or,, Ste 102 Bozeman, MT 59715 Owner: City of Bozeman P.O. Box 1230 Bozeman, MT 59771 Human Resource Development Council 32 South Tracy Bozeman, MT 59715 Scott Jay 6 By: By 3 - 10 Chris Kukulski Date: Le HazAake Page 2 of 2 File 21f CO-913—Joint.doe ThurWay, 1,Ay ?2, 2010 Kke Wj! emkin Ar<f toris 55 W�Y,, 441h SttUh!t H MT S RE: Chi,ange Proposiall - CIPV 16 Omeman Cityr Bus Barn - 509OU Gear MAE! Wisetnem, Pns leper c� , lu iu(1,oe aulhonzatio to oroLeLd. tne fc!lovomq+ xVa work CP Number: 16 De5crilption; Ramaiitlioq StructurW Fill for Building - Revised Proposed Amt. $ 22,730.40 Owp Requested. 0 days (See attac The City of Bozeman gave an araivarice of 50,00cy of structurd fill ttwt ovaulld t prowdW by the (ity SqX4� pfe� There is 2583Le still ovmd to the prove Lodate, There is also tfie 845cy from the my torkpllc-! tfwat was plixxtl in the road with tfvi uriftitaiidlng that the mmaterial viwsuitable and met the specifirattms of lbe prqj#-r-t. It ywas ttio (bund out ttvt the material doeS 1 411044 the spfxiffwTions, so it has to W femmoved and re alas: , 40 wltli adequate structural fill to meat the project oondlvGns, The f Nal amain owed by tt)e City to SatJOY the 5000cy that Iva s imAxled In Addendum, # f the bld dowrnen N. is the 25 icy, The 8451Y will be discussed and decided On at d I date. A&4t !Uf . h LV20 v and f ebt 1" a C-,Of y( Ot rrms W WKI,'rCdNa YGtr arCCrtulf Of th 1 (-AtTA VWW"N 3nd PFFMNV" 1110 PICL Liar IM V4011( Additalgi rn - re"i moply I aulom"'Itm,"' vj wrx".)"m'd 01m , 0 ONDAdets firs fX00 ov V115 tre f prim for ths wOi. Wiguildes K - A proa�LAJvd octh (01" wmla k 'r»,1sro tn ovoret approval vl Ommi (sm atac or vrMal dmc, , or, Tbq ctai froormal represcuO3 that i lr , �„, P11W tOr tl v"'wo Subtratw by.. kmoted by, Date 7/27110 1 �r ftaafm -we Doaft Sandhaka AirAftm Fill" 1,11i : o nt iractor FIN8uPldpN, irtc. Overhead 6 Pr Ti fftfl o n CH & Pr oft r smith attar o (, ri Total $ 22,130.401 Pow lact #- S0 CP 1 q 9 mW; mmm lei 64s.1 B N Mu 131. , o �� u gg �� " m m Off J d1 11 : o nt iractor FIN8uPldpN, irtc. Overhead 6 Pr Ti fftfl o n CH & Pr oft r smith attar o (, ri Total $ 22,130.401 '-TT k l h I � r q 9 r� k a gg d yM�" C61. r 4 e,. W u YP m '°�' 'tri^M P,A 4 6: I l YP4N 1 AA w. I � 4 9 I fA L: g� e f 0 pq y 1 k, P % w "a Ali U��� Monday, July 216, 2010 Kke Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal - CP# 31 Bozeman City Bus Bar'n - 509012 Dear Mike Wiseman, IF Description: Sub-Base Footin!g Fill Proposed Amt. $i 1,408.00 Days Requested: 0 days 5pqpp — of fttk (see attached for detailed cost summary): BNB requested 702cy of material, of wNch 500cy was covered and approved in CP#4 and 42cy was covered and approved in CP# 19, leaving 160cy remaining, The engineer of record along with both project architects Dave deemed the 160cy justified and have recommended BN13 is due compensation. BNB will consider this issue closed upon receipt of the owner change order. Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the prim for this work. Additionai costs may apply if authorization is received after , E] ONBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work. ENBOders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Submitted by: Accepted by iD 7/27/10 "'Jhftae nn -. Wiseman HNOvildets, Inc Dowfing Sandholm Architects 111 117 Ell, 7 1 1 i, 1` 1:: Contractor-.---i, Description �601cy @ $8,80 /cy 1 oil BNBuilders, Inc. Overhead & Profit $0.00 BNBuilders, Inc. OH & Profit Subcontractors $0.00 uz��V�NM" Monday, July 26, 2010 Mike Wiseman Dowling Sandholm Architect 55 West 14th Street Helena, MT 59601 RIE- Change Proposal - CP# 32 Bozeman City Bus Barn - 509 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work CP Number: 32 Description. Fill Unknown Concrete Structure Proposed Amt: $ 202.40 Days Requested: 0 days 5copepf Wq 4 (see attached for detailed cost summary): in 23cy of material was needed to fill the unknown structures in the east building to provide a proper structural base. As this was discussed with Cordell (Stahly) and again w ith the project team on 7/22/10, this item has been accepted. BNS will consider this Issue closed upon receipt of the owner change order. 0 Please sign below and MUM a COPY Of this letter to indicate your aomptance of this extra work and approve the price for this work. Additional Costs May apply if authorization Is received after . Mullders has proceeded with this work per previms. ROM approval (attached). Tim change proposal represents the final price for this work. Mullders has proceeded with this work based on owner approval via ernall (see attached) or verbal c1srection, Ibis change proposal represents the final price for this work. Submitted by: AcceDited by., Date: M7/10 Mike WL"n;i n r m Wing Sandbohn ArcbRects W075��� Contra4ar, BNBuilders, Inc. BNB(Jllder.s, Inc 23cy @ $8,80/cY overhead & Pmfit OH & Profit Subcontractors Amount $0.00 $0.00 Total $202.40 COMMISSION RESOLUTION NO. 4278 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZENIAN, MONTANA, APPROVING ALTERATION /M OF CONTRACT WITH BN BUILDERS, BOZEAIAN, MONTANA. WHEREAS, the City Commission did, on the 51h day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozernan, Montana, and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications ands or plans of the contract be made by resolution. and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman. Montana, as contained in Change Order #13, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf' of the City, and the City Clerk is authorized and directed to attest such signature. PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 13th day of September, 201 O "F B 0 AT. S Cy I LM CM� City jJEF K5� SS M a , WIA� , N,4ayo - 7, � : r;� � AS TO FORM: G,P�EG SULLIVAN (7ffy Attorney 0 Y