Loading...
HomeMy WebLinkAboutResolution 4277 Change Order 12, Vehicle Main./HRDC Bus Barn, BN BuildersCOMMISSION RESOLUTION NO. 4277 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION /MODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozernan, Montana; and WHEREAS, Section 7-5 -4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and /or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of' the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and: or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #12, attached hereto, be and the salve are hereby approved and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City, and the City Clerk is authorized and directed to attest such signature. lo, Roohaion Nei 42 ( ham, wdc i vJ2 PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 13th day of September, 201 K. u S 0 ATTE8� B S c Cit0- 0 YOGI Page 2 of 2 62 d:owtinQ Project: City Shops/ HRDC Bus Barn 1O21N. Rouse Ave Bozeman, MT 59715 To Contractor: BNBuilders, Inc 2066 Stadium Or.. Ste 1O2 Bozeman, /NTGQ715 The Contract ks changed amfollows: Increase Contract Sum. Date: July 26,2O1O Architect's Project No: 08-265 Contract Date: November 4.2OOS Contract For: General Construction Owner M Architect EM Contractor E3 Field O Other F] Reason for change: Because the final foundation, design could not be completed until final steel building load calculations were provided, there were some minor modifications to pier and footing sizes asoresult of the final load calculations. The resulted in increased concrete, rebar and excavation costs. The footing rebar for the City of Bozeman's vehicle lift was also found to be inadequate upon final review of the product specifications, which resulted in increased psbar being placed in the footing. (CP#19) Therefore, the City of Bozeman issolely responsible for $225inrebar.and the balance of the proposal, $11.860,54.imsplit evenly between owners. ' __ _-__—.`_,. Cp# 19 Email from BNB delineating separate cost for vehicle lift nebar Total Contract SumAdivahnamt The original Contract Sum was The net change by previously authorized Change orders The Contract Sum prior hn this Change Order was The Contract Sum will be increased by this Change Order by the amount of The new Contract Sum including this Change Order will be Qy. of Bozeman Contract Sum Ada ustment: The original Contract Sum was The net change bypreviously authorized Change Orders The Contract Sum prior b» this Change Order was The Contract Sum will be increased by this Change Order by the amount of (5Q.B9&of Total Change Order) The new Contract Sum including this Change Order will be The original Contract Sum was The net change bypreviously authorized Change Orders The Contract Sum prior huthis Change Order was The Contract Sum will be increased by this Change Order bythe amount of (48.1Y4of Total Change Order) The new Contract Sum including this Change Order will be Contract TiM@ Ad The Contract Time will be increased by _KqLoL0J days, The date of Substantial Completion aenf the date of this Change Order therefore is: August 15. 2ol o Im Mullders, Inc. Wednesday, July 21, 2010 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal - CP# 19 Bozeman City Bus Barn - 509012 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work* CP Number: 19 Description: Revised Foundation Design and Footings at Mohawk Lift Proposed Amt: $ 11,893.54 Days Requested. 0 days scope, of Work (see attached for detailed cost summary): Provide labor, materials, and equipment to provide complete Installtion of the revised foundations and footings as per details provided In ASI #08. 0 Please sign below and return a copy of this letter to indfcate your acceptance of this extra work and approve the pnce for this work. Additional costs may apply if authorization is received after , ONSuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final prim for this work. Mullders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work, Submitted by: Accepted by Oate. J'- Mike man I OeO - SUIlde Inc V�N Dowling Sandholm Architectir V. b Labor ADDITIONAL EXCAVATION ADDITIONAL BACKFILL ADDITONAL SUBGRADE PREP PLACE ADDITIONAL STRUCTURAL FILL EXCAVATE PIER BACKFILL PIER 67= CY 62,00 CY 35 00 SY 42.00 CY 3.00 EA 3.00 EA LABOR TOTAL $2,398.00 materizI STRUCTURAL FILL 42-00 CY $8.00 $336.00 MATERIALS TOTAL $336.00 LA 80 R AND MATERIALS TOTAL $2,734.00 OH & P (10%) $273.40 CHANGE ORDER TOTAL $3.007.401 4/14120104:25 PM ASI 98 - BRAKDOWN 04121 /2010 WED ?. FAX 406 259 9995 Teton Steel of Billings Name: BN Builders Address: 2601 4 A ve. Ste 350 Seattle, WA 98121 Purchase Order Flo. TETON STEEL. OF MONTANA Reinforcing Steel Fabrication - A Division of Industries, Inc. 2880 Gabel Road Billings, MT 59102 Phone: 4 06-269-8067 Fast: 406 - 259 -9895 DATE; 4 - 16 - 10 Project: HRDG taus Barn Address: Bozeman, MT Teton Job No. M29131 Invoice No. Your signed acceptance is required on this form In order that TETON may proceed with the below- descrlbed extra requirements for this Project. Please have an authorized agent of your Company sign where indicated and return to our office immediately. Upon receipt by TETON of this authorization, we will incorporate the required extra material In our placing drawings and proceed with fabricating and furnishing the material to the project. In the event that this material is now being delivered to the project in order to facilltate the job, this ,authorization must be signed by your field representative and returned with our delivery person In order that future shipments will not be delayed. EXTRA REQUIREMENTS: Additional bar required per revised drawings dated 3 -25.10 rev. 5 Adds approximately 4.7 toms for $3430 Deduct for contractor fabricating tooting bar from stock bar $350 � M Total Additional Cast $ 3080. 00 Sales Taxes Not Included The Terms and Conditions of the original purchase Order shell apply to this Authorization for Extra Materials Accepted For ', rr ;TTETO ee I LCC) Industries Title: Taylor K. Ranker Russell E. lzatt j General Manager Sales Manager Date: d Teton Steel Company Bid Set 7/19/09 Footing Pier Type QUANTITY TOTAL CY. F4,0 19 11.25 F4.5 4 3 F5,0 4 3-7 F5.5 3 3.36 F6.0 4 5.33 F7.0 7 12.7 F7.5 10 2.08 F8,0 3 7.1 F9.0 2 2.2 PIER 2'0" X 1'9"" X 4'(AV.) 45 22,2,2.-' TOTAL CY ALL PIERS FOOTINGS 72.94 REVISED SET 3/26/10 Footing Pier Type QUANTITY TOTAL CY. F4.0 7 4.18 F4.5 2 1.5 F5.0 16 14.8 F5.5 3 3.36 F6.0 4 5.33 F7.0 6 10,89 F7.5 8 16.67 F8.0 3 7,11 F9.0 2 6 F9.5 2 5.2 F10.5 2 5.4 PIER A 6 1.79 PIER B 4 1 PIER C 4 0.9 PIER D 4 0.5 PIER E 3 0.43 PIER F 4 1 PIER G 4 1.4 PIER H 6 0.64 PIER 1 2 0.53 PIER 2 TOTAL CY ALL PIERS FOOTINGS 88.82 a fi a G _ rt /4 AL i r g s i r{ �.�� 7 E r'y� mm /����. 9 ✓ J �� i ��q�� y F 1111 + ) 1 �' � i � � .� � »p dw 1R °a .� ��p�' ao k d ' „, 99 r. �..��•� ` ' r I k 5 h I flli t wwe "Ba�wppps gre r�m m �t I EAST FOUNDATION i � FACI LITY m MAN 1117 TITH Cp CAE AVE i daw4lsg (z,.ua�h.W,r � trchtftxlsp "� �.. r-ao r-*"�,.C7 „1f 4ta.a �.: " - - r Scz rr�r;.,laC',`a 9 1 1 — vL�Att.ewC1'UTE�UfCEf Vt.iw4i94A.,�PubfLEt �.dCt�RECr� �a i'�D ark kY M� � 0 A 111 E A CJ I N. -1 0 1 3 1 G P - H - R - nUWARN FOUNDAT FACILITY DETAI s �� '„ �' �r]aw4 Eap halre ,.eChuC <ts ^i' 1312 WITH rQlrE AW PEW1MT%AM1'.= From: Brian Nostrant To: Michael Wiseman; CC: Jenae Benner,_ Subject: RE: CP #19 Date: Monday, July 26, 2010 8:13:13 AM Attachments: The footing size did not change only the re-bar. It went from 240 If of #5 bar to 578 If of #4 bar. @ 68 / If we're looking at $225,00 +/-. From: Jenae Benner Sent: Monday, July 26, 2010 8:00 AM To: Brian Nostrant Subject: FW: CP #19 Cm Sinice you calculated the concrete, can you help out with this. Thanks, From: Michael Wiseman [mailto:mwiseman@dowlingsandholm.com] Sent; Monday, July 26, 2010 7:58 AM To: 3enae Benner Subject: RE: CP #19 One thing I forgot on this is that HRDC should not pay for the Mohawk lift footing size increase. Can you either break that value out separately (if its easy) or estimate a percent of the total CP cost that I can use to break it out. Thanks Mike