HomeMy WebLinkAboutChange Order 12, City Shops/HRDC Bus Barn, BN Builders, Res. 4277� � |\ dow|ing | sandhn*m | architec JOINT OWNER CHANGE ORDER Project: City Shops/ HRDC Bus Barn 1821 N. Rouse Ave Bozeman, MT50715 To contractor: BN Builders, Inc 20G8 Stadium Dc. Ste 102 Bozeman, KAT50715 Date: July 28.281O ArchUmnftProjen Nu: 88'285 Contract Date: November4,2OO9 Contract For: General Construction C.O. #12 Owner M Architect 0 Contractor Field [] Other [] The Contract ka changed umfollows: Increase Contract Sum. Reason for change: Because the final foundation design could not bo completed until final steel building load calculations were provided, there were some minor nlodifioadonnto pier and footing sizes oom result of the final load calculations, The resulted in increased concrete, rebar and excavation costs. The footing rebar for the City of Bozeman's vehicle lift was also found to be inadequate upon final review of the product specifications, which resulted in increased rebar being placed in the footing. (CP #19) Therefore, the City of Bozeman is solely responsible for $225 in rebar, and the balance of the proposal, $11,668.54, is split evenly between owners, Attachment(s): CP# 19 Email from BNB delineating separate cost for vehicle lift nnbar Total Contract Sum Adiuohnent The original ContraoSumwas The net change by previously authorized Change Orders 38,448A9 The Contract Sum prior no this Change Order was The Contract Sum will be increased by this Change Order by the amount cd $ The new Contract Sum including this Change Order will be $ City of Bozeman Contract Sum Adiustment: The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior 0o this Change Order was The Contract Sum will bm increased by this Change Order by the amount of (50.Q%of Total Change Order) The new Contract Sum including this Change Order will be HRDC Contract Sum Ad'ustment: The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will ueincreased by this Change Order by the amount of (49,1Y4of Total Change Order) The new Contract Sum including this Change Order will be $ 883,210-96 $ 889,045.23 Contract Time Adoustment: The Contract Time will ba increased by zero 0) days, The date ofSubstantial Completion mmmf the date cf this Change Order therefore is: Aggust. 15, 201 JOINT OWNER CHANGE ORDER C.O. #1 Not valid until signed by Architect, Contractor, and Owners. Signatures: Architect: Dowling Sandholm Architects 15 West 10 Street — Suite 103 Helena, Mt 59601 Place Architecture 118 E. Main St Bozeman, MT, 59715 Contractor: BN Builders, Inc 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Owner: City of Bozeman P.O. Box 1230 Bozeman, MT 59771 Human Resource Development Council 32 South Tracy Bozeman, MT 59715 BY: 1 ' Date: (— I — Mike Wiseman By: Sash M By: Date:46�ko Cott Jay t),, Ptbov/b of By • Dater Chris Kukulski By; Date: /2) 1-6e Haze[baffer Page 2 of 2 File 21f C0-912-Jointdoe Wednesday, July 21, 2010 Mike Wiseman Dowling Sandholim Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal - CP# 19 Bozeman City Bus Bam -509012 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work, CP Number: 19 Description Revised Foundation Design and Footings at Mohawk Lift Proposed Amt: $11,893.54 Days Requested; 0 days scope of Work (see attached for detailed cost summarft Provide labor, materials, and equipment to provide complete Installtion of the revised foundations and footings as per details provided in ASI #08. Pleaw sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the price for this work. Additional costs may apply if authorization is received after . SUBullders has procoaded with this work per previous ROM approval (attached). This change proposal represents the final prim for this work. 81911AIders has proceeded with this work based on owner approval via email (see attached) or verbal direction, This change proposal represents the final prim for this work. Submitted by: Accepted by: Date: H ez Mike Wiseman j ;ae — 1 N vit'ders, Zyc DoR*n_q Sandholm Architects BNBuilders, Inc. BNBuilders, Inc. overhead & Profit OH & Pmflt Subcontractors Amount $3,007 $2,838, $275,00 $3,430.00 z ' 9*0 $514.50 $722.64 Tatah $11,893.54 4/14/20104:26 PM ASI #8 - BRAKDOWN 0 1 fT 04/21/2010 WED 7-. 15 PAX 406 259 9995 Teton Steel of Billings CONTRACTOR: Name: BN Builders Address: 2601 4 Ave. Ste 350 Seattle, WA 08 12 - 1 Purchase Order No. TETON STEEL OF MONTANA CRW Reinforcing Steel Fabrication - A Division of Industries, inc. 2880 Gabel Road Billings, MT 59102 Phone'. 406-259-8067 Fax: 406-259-9895 DATE: 4-16-10 Project: HRDC Bus Barn Address: Bozeman, IVIT Teton Job No. M29131 invoice No. AUTHORIZATION FOR EXTRA MATERIALS The Terms and Conditions of the original Purchase Order shall apply to this Authorization for Extra Materials eOO1/ DOI ; TE T 0 e �� I CO Industries Y: Taylor K. Ranker C Russell E, lzatt General Manager Sales Manager Teton Steel Company Accepted For: CONCRETE MATERIALS OF MONTANA, LLC h up-limm, concretul a —ter I ki�fmt. egn 1059 Amsterdam Rwid, Dolgade, MT 59714 Office Phone: (406) 30-8182 Fax: (406) 388-3132 May 4, 201 BN Builders 293 Rodeo DR, Ste #2 Florence, MT 59873 Phone: Lenae.k(m nt erembnbuildem.com _ _ — Concrete Materials of Montana is pleased to offer the following prices for your Bus B arn Aal 8-F indAtign / Footing R le iun in Bozeman, MT. Qj ------- In addition to the on - inal contracted amounts; An extra 14 cubic, yards 3000 psi concrete will be billed at $79 / yd I (one) pump set for $275 "Bid prices supersede customer discounts and/or previous quotes. All invoices over 30 days will incur service charges of 1.5% These prices are good until March 31, 201 T1111KI UOK ,-Or ( " . 'C I tt , 'A''. 1 16 - t t ? L" "r V, V� 1 "9 Footing / Pier Type QUANTITY TOTAL CY. F4.0 19 11.25 F4.5 4 3 F5.0 4 3-7 F5.5 3 3.36 F6.0 4 5.33 F7.0 7 12.7 F7.5 10 2.08 F8.0 3 7,1 F9.0 2 2.2 PIER 2'0" X 1'8"X 4 45 22.2-2- TOTAL CY ALL PIERS / FOOTINGS 2 72.94 REVISED SET 3/26/10 Footing Pier Type QUANTITY TOTAL CY. F4.0 7 4.18 1`4,5 2 1.5 F5.0 16 14.8 F5.5 3 3.36 F6.0 4 5,33 F7.0 6 10.89 F7.5 8 1.6.67 F8.0 3 7,11 F9.0 2 6 F9.5 2 5.2 F10.5 2 5.4 PIER A 6 1.79 PIER B 4 1 PIER C 4 0.9 PIER D 4 0.5 PIER E 3 0.43 PIER F 4 1 PIER G 4 1.4 PIER H 6 0k4 PIER 1 2 0.53 PIER J 2 1 0,11-51" TOTAL CY ALL PIERS FOOTINGS 88.82 dowling I sandhaLm I architects ARCHITECT'S SUPPLEMENTAL INSTRUCTION Date: March 26, 2010 Project: City of Bozemanl HRDC City Shops/ Bus Barn 1812 N. Rouse Ave. Bozeman, MT 59715 Regarding: Foundation design and Footings at Mohawk Hoist Job Number: #08-265 Issued To Scott Jay BN Builders 2066 Stadium Dr., Ste 102 Bozeman, MT 519715 Information: Structural engineer has modified the foundation drawings and details to reflect the steel building design and Loads. Per manufacturer's recommendations, the structural engineer has changed the rebar requirements for footing F6.0. Attachments: S2,1 E. S2.1 W. S&1, S3.2 Issued By: Dowling Sandholm Architects By: Date; 3126110 Michael Wiseman End of Architect's Supplemental Instructions 1 � Y'a :PUawY mKwpw .,ukpTk;NR4riWM4'+�1pWM1whm4N�, 7CVUm' &urtW lm'm:', AWK'KF��n W^�kM1G�K'A h�`.Y - '++ "X W 1u +'eQtmi GIMNtM`G @ t q ' 1:. p � p d b Ir r r i d r I I� IQvM L w� Y:� Yi�� (�wre4 1 C tl: C ai u � a 9 � 1 { ae axi n afd V tl CIT1f BPS /iR ANN Ip C p EAST FOUNDATION PLAN YA� p N,( "i I &� k( W', ME E M ti � d�cw inm sarr�ihof'� Erc Mtt6eB� v,. " awn ;n K MtiE m I tl �,�PE' i M °.rY_iw � !'�. �'U „5,xhiJ' h't;;�CC�"fS,1tlw "'•:� d__ tl ..,....,»....,..,..,..,,,,. ..,..Fl...,.: ..µ,» PLhCEAkGV' OA& EG1UV eF1" �q° 1 .IBS$4lTfitik&tAA71CIR77fS'f'�➢ iz Ml ij I �r>� S I "w� � !k. � u R �t�; G� �° � � s "e.� - ,dr A "� - 4� � � M � a i �dy 05 FACILITY WEST FOUNDATIDN R10,17"I AVE T7 DOLMAN, Mf svl� t jT"i I Ll .- • W"f' : ,.�, � ,,, sa a ••p •a- t o M M. .vF +,v .',m2'. a .� Ui � r xx 'n f.M pv ryt['v .� r. YN " °' 9u m' J o i. "s 'n'.Y :� vvA. �m,xW na vr.R r� b"s W f F 4 pi w � e e nom.}.. .. Al l x t; W e' l �x t • • � +. v iz' r "" ` d a FACILITY MAU bMiF Na 716E N fU E AVE r � dopF�n� � sarCtrro9 r � n <hW &aces � y °- -°, '" _ ,. Pi,ALff kilCti3iECiiO'PN! P iNa Jim AkKffCij ' 71 + �d Il i Ul We A _A FOUNDATION FACILITY DETAILS 7; * 'Z 1112 NQRjHf=5$ AVE t k A I � T CC7 MA I AnCRITMOt I 66V il 0 SAO iiOW ACMUM D ZM gA 4 �l tl q on per; Lbi L ' 71 + �d Il i Ul We A _A FOUNDATION FACILITY DETAILS 7; * 'Z 1112 NQRjHf=5$ AVE t k A I � T CC7 MA I AnCRITMOt I 66V il 0 SAO iiOW ACMUM D ZM I �l tl q ' 71 + �d Il i Ul We A _A FOUNDATION FACILITY DETAILS 7; * 'Z 1112 NQRjHf=5$ AVE t k A I � T CC7 MA I AnCRITMOt I 66V il 0 SAO iiOW ACMUM D ZM From: Brian Nostrant To: Michael Wiseman- CC: Jenae Renner Subject: RE: CP 419 Date: Monday, July 26, 2010 8:13:13 AM Attachments: The footing size did not change only - the re-bar. It went from 240 If of #5 bar to 578 If of #4 bar. @ .68 / If we're looking at $225.00 +/-. From: Jenae Benner Sent: Monday, July 26, 2010 8:00 AM To: Brian Nostrant Subject: FW: CP #19 mm Since you calculated the concrete, can you help out with this, From: Michael Wiseman [mailto:mwiseman@dowlingsandholm.com] Sent: Monday, July 26, 2010 7:58 AM To: Jenae Benner Subject: RE: CP #19 One thing I forgot on this is that HIRDC should not pay for the Mohawk lift footing size increase. Can you either break that value out separately (if its easy) or estimate a percent of the total CP cost that I can use to break it out. Thanks Mike COMMISSION RESOLUTION NO�. 4277 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATIONIMODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozeman, Montana, and WHEREAS, Section 7-5-4308, Montana Code Annotated, prop, ides that any such alterations or modifications of the specifications andw plans of the contract be made by resolution, and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and!or plans of the contract, NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman. Montana, that the proposed modifications and alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #12. attached hereto. be and the same are hereby approved, and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City, and the City Clerk is authorized and directed to attest such signature, C, 1 o PASSED AND ADOPTED by the City Commission of the City of Bozeman. Montana, at a regular session thereof held on the 13th day of September, 2010. F K. AU S ATT% a OZ 4 1 6 m Cna N C1 t Gl'i. 7 m I, YwC ^� yti City Page 2 of 2 NE W 62