Loading...
HomeMy WebLinkAbout28_A1.8.pdfLOT 2 (NISSAN) LIGHTING CALCULATIONS PLANBAYLISS WARD# 1697Desc.DateREVISIONSNo.bARCHITECTSlissaybayliss architects, P.C.Bozeman, MT 59771-1134P.O. Box 1134generated: 8.4.2010JOB NUMBER:checked by:drawn by:DATE ISSUED:BILLION PLAZA IINISSAN DEALERSHIP200 AUTOMOTIVE AVENUEBOZEMAN, MT 5971808/04/10PRELIMINARY NOT FOR CONSTRUCTIONsbbw2932A1.8LOT 2NISSANLIGHTING CALCULATIONS PLANFallon Street Front RowAverage = 6.05Maximum = 9.65Minimum = 2.22Avg/Min Ratio = 2.73Max/Min Ratio = 4.35No. Points = 63Fallon Street Front RowIlluminance Values (Fc)Statistical Area SummaryProject: Billion Car DealershipLabelAvgMaxMinAvg/MinMax/Min# PtsUnitsCottonwood Road Front Row5.198.952.761.883.2448FcFallon Street Front Row6.059.652.222.734.3563FcNorth Side GM2.014.580.385.2912.0598FcWest Side of Chrysler2.275.900.415.5414.39116FcLuminaire ScheduleProject: Billion Car DealershipSymbolQtyLabelDescriptionArrangementLumensLLFFilename49S1Gardco G18-1-3XL-250PSMH @ 20'SINGLE220000.750GW3X25M.ies14S2Gardco G18-2-3XL-250PSMH @ 20'TWIN-ROTATED220000.750GW3X25M.ies