HomeMy WebLinkAbout14_Nissan Site Plan - Geotech_Addendum.pdf RIMROCK
ENGINEERING, INC. Phone 406.294.8400
5440 Holiday Avenue • Billings, MT 59101 Fax 406.294,8405
July 7, 2010
Big Sky Land Consulting. PLLC
5530 Burnt Road
Belgrade, MT 59714
Attentions Mr Tom Henesh
SUBJECT: Addendum to the Geotechnical Investigation Report
Billion Auto Plaza
Three Auto Dealerships
Bozeman, Montana
Dear Mr. Henesh.
On July 1. 2010, Rimrock Engineering completed the geotechnical investigation for the Billion
Auto Plaza. At the time we were not aware that a traffic study for the J&D Family Subdivision
had been completed by Abelin Traffic Services This addendum is to update the pavement
sections to comply with the traffic study and the City of Bozeman minimum requirements. The
pavement sections shown below replace the sections in our report
The recommended pavement structural sections for the project presented in Table 2 were
calculated using the AASHTO pavement design procedure. We are providing a heavy duty
pavement section for Automotive Avenue and areas which will have heavy truck traffic and a
light duty section for parking areas. In our analysis for the heavy duty pavement section. we
used an ADT of 3814 vehicles per day with 2% truck traffic for the heavy duty section which
results in a traffic loading condition of 502.485 18-kip equivalent single axle load (18-kip ESAL).
For the light duty pavement section we assumed a loading of 75,000 ESAL's for the 20 design
lifetime of the pavement. A CBR value of 5 7 was used for design of the pavement sections.
Due to the high groundwater elevations. we have adjusted the drainage -factors on the base
course and subbase layers.
Rimrock Engineering was also requested to provide a concrete pavement section for some
areas which may have automobiles parked for significant time periods This section is also
shown in Table 2 and should be incorporated into our original report
07-115-03 Page 1 of 2 July 7, 2010
Rimrock Engineering, Inc
TABLE 2
PAVEMENT STRUCTURAL SECTIONS
Traffic Condition Recommended Minimum Structural Section*
Light Duty Pavement Section 3 inches Asphaltic Concrete, 6-inches of 1-1/2 inch Crushed Base
Course and 8 inches of 6" minus subbase
Heavy Duty Pavement Section 4 inches of Asphaltic Concrete, 6-inches of Crushed Base Course
and 10 inches of 6" minus subbase
Light Duty Portland Cement 5 inches of Portland Cement Concrete, 4 inches of 1-1/2 inch
Concrete Section Crushed Base Course and 8 inches of 6" Minus Subbase
Aggregate base course thickness may be reduced in each pavement structural section by approximately
20% with the use of a recommended geotextile fabric
This addendum and other conclusions and recommendations, along with restrictions and
limitations in the original report should be followed
We appreciate this opportunity to be of service to you, and look forward to future endeavors. If
you have any questions regarding this report or need additional information or services, please
feel free to call the undersigned.
Sincerely.
RIMROCK ENGINEERING, INC.
Robert W. Kukes, P.E.
Principal
07-115-03 Page 1 of 2 July 7, 2010
Rimrock Engineering, Inc