Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
28_A2.2-GM.pdf
"!##""#"#"#"$$"$#",!!-$&)# $)%"%$)$&&$))$"&%$$)($&$(%$($%&$%$")$")&$ !)"%$&" )$($) """ "#,!!-,!!-,!!-,!!-$"$$$#$)#""$"$)$#"$$$#"%$&""*(#&(((((%#"&((%&((&(&%&COVERED EXTERIOR AREA*$"$$TOTAL BUILDING AREA)$"!$"".&&$%$&$A2.2UPPERFLOORPLAN - OVERALLBAYLISS WARD# 1697Desc.DateREVISIONSNo.bARCHITECTSlissaybayliss architects, P.C.Bozeman, MT 59771-1134P.O. Box 1134generated: 8.3.2010JOB NUMBER:checked by:drawn by:DATE ISSUED:BILLION PLAZA IIGM/CHRYSLER DEALERSHIP150/205 AUTOMOTIVE AVENUEBOZEMAN, MT 5971808/04/10PRELIMINARY NOT FOR CONSTRUCTIONsbbw2912UPPER FLOOR PLAN - OVERALL)"$$$#