Loading...
HomeMy WebLinkAbout14_Master Site Plan - Geotech_02.pdf APPENDIX A Plates 17 Mff 1 • N]L row,; 4 .. f 11Jea .. .mot• 1 • t Z 11 - ®Z, Goole a5'40'37 14"N 1 2.0_ W 'elev oft EYe a t�a82'It s' Southwest • 11 -, ����II111...•.. 1 • • • f • ' . f • 1 •1. •1 1 C• • 14� TI v- � 1•-u • n'•n- _ V � Q lug �If Z ^_irl 77-7 a 1, a PIERIA i/Y/.� �• •I,;n,-u 11 r u I• n'n'•..0 Iva ,P4 UM ",logo On ���t•� �" ����JIG����NIS: ►•�1.I�i..' I f 7 1. .............. 1 • • . • • • • • Date Completed, 6/21/2010 Logged By. W RaynnIck Location 5 ft SW of Surveyed/Staked Point# 10121 -See Site Map,Plate 2.Appendix A Drill Operator Duneman Construction Method Rubber Tired Backhoe Elev Top of Hole 4792 Total Depth 8 0 Groundwater Depth 12.0 F 1 2.0 d x z O } O m w rn E_• � w w W a w J j F DESCRIPTION NOTES �a aaa w � O c w a 2� m w Q QZ) -1O w O n w 0 0 cnz mLL 0 Two sooil Organic/Lean Clay,Black,SoftNery Soft, oiNl -sZ�urated,High Plasticity,(OUCL) :L•.�1To• � Lean Clay Gray with Reddish Brown Mottling,Wet.Very Soft, Moisture Content=48.9% High Plasticity,(CL) Minus 200=62% Plastic Index =22 Lean Cla with Trace/Some Gravel Gray with Reddish Brown an ig ray oIffing vVet,very S6fl. High Plasticity.(CL) a Silt Gh Sand and Cobbles Brown/Gray.Wet. ° °o wm Mnese o eryry nse, rams ar Non-PlasUc/Low o D Plasticity of Fines,(GM) DC C 0 o ° °o a D 0 F— 0 O o0 o D 0 U O 00 �Cc o D o U O o0 o D 0 o ° °o D 0 0 °o o D 0 End of Test Pit a' - U q 0 0 O J — U LOG OF TEST PIT TP-01 PLATE Rimrock En ineerin J&D Family Minor Subdivision- Phase 1 and 2 1 of 1 o g g Lots 1, 2, & 3- Billion Auto Plaza N Y Bozeman, Montana c) Drafted By W Reynolds Project No.. 07-115-03 Date 7/1/2010 File Number. Big Sky Land Consulting, LLC Rlmod Erg�rq Date Completed 6/21/2010 Logged By w Reynnlric Location 5 ft N of Surveyed/Staked Point# 10126-See Site Map,Plate 2.Appendix A Drill Operator Duneman Construction Method Rubber Tired Backhoe Elev Top of Hole 4791 Total Depth 8 0 Groundwater Depth. I SZ 2'5 F 1 2.5 r aw X Z m a > w O w w w ° w DESCRIPTION NOTES j a amr O> L w can viz mLL of X O ToT 'I Organic/Lean Clay.Black,SofVVery Soft. aM st/baturated.High Plasticity,(OUCL) Lea_ n Clay Gray withReddish Brown Mottling Wet.Very Soft, High as rcit , CL Lean Cla with Trace/Some Gravel Gray with Reddish Brown an rg ray o ing Wet_ ery o _ High Plasticity,(CL) MediSilty Gravel with Sand and Cobbles Brown/Gray,Wet, um Dense to VeeryryDense,bran.r Non-Plastic/Low o D Plasticity of Fines (GM) 0 ° ° u° o D 0 o D O r, o 0 00 o D 0 o D 'C ao v D 0 U ° V° o D 0 ° o oo o D 0 0rX. 0° End of Test Pit a CO 4 0 O O J -- LOG OF TEST PIT TP-02 PLATE Rimrock Engineering J&D Family Minor Subdivision - Phase 1 and 2 1 of 1 o g g Lots 1, 2, & 3- Billion Auto Plaza Y Bozeman, Montana o Drafted By, W Reynolds Project No 07-115-03 4 Date: 7/1/2010 File Number Big Sky Land Consulting, LLC Rmork Erp-v Date Completed 6/21/2010 Logged By W Reynnldss Location 10 ft SW of Surveyed/Staked Point# 10124-See Site Map,Plate 2,Appendix A Drill Operator Duneman Construction Method Rubber Tired Backhoe Elev Top of Hole 4793 Total Depth 80 Groundwater Depth I :�Z 2 5 F 1 2.5 LU z a O itff > m w P w w� a w J DESCRIPTION NOTES a = J J W cn > U > F a o m fit- o L a 22 o @ w o can _can z m o w O Tooil Organic/Lean Clay,Black,SoftNery Soft. ;� .•;:;� oiM st/Saturated,High Plasticity.(OL/CL) Lean Clay Gray with Reddish Brown Mottling.Wet,Very Soft, High Plasticity,(CL) Lean CIa with Trace/Some Gravel Gray with Reddish Brown an ig ray ottling.Vvet,very Sok High Plasticity.(CL) Silty Gravel with Sand and Cobbles Brown/Gray.Wet. °o A�ium enserryy Dense Vranular Non-Plastic/Low o D Plasticity of Fines.(GM) 0 0 0 °0 �o D O ° o o° o D 0 o D 0 o D o 0 0 °o o D 0 o D 0 O D O 0 End of Test Pit a' t� 4 0 O O J LOG OF TEST PIT TP-03 PLATE RIC71rOCk Engineering J&D Family Minor Subdivision - Phase 1 and 2 1 of 1 o g g Lots 1, 2, & 3 - Billion Auto Plaza N o Drafted By. W Reynolds Project No.: 07-115-03 Bozeman. Montana Date 7/1/2010 File Number: Big Sky Land Consulting, LLC R—a ErU.—,W, Date Completed 6/21/2010 Logged By W Rpynolris Location 5 fL SE of Surveyed/Staked Point# 10127-See Site Map Plate 2.Appendix A Dnll Operator Duneman Construction Method_ Rubber Tired Backhoe Elev Top of Hole 4798 Total Depth 8 0 Groundwater Depth I V 2.5 F1 25 a- x z Om w >- rn w w w > i DESCRIPTION NOTES > F a- am O -E o_ � 2� m w Q Q1 �O w O n W 0 0 ToTopoil Organic/Lean Clay,Black,SofWery Soft, o►JI s176afurated.High Plasticity,(OUCL) Lean Clay Gray with Reddish Brown Mottling,Wet,Very Soft, ig as icity.(CL) Lean Cla with Trace/Some Gravel Gray with Reddish Brown an ig ray Mottling e ery oft, High Plasticity,(CL) - Silty Gravel with Sand and Cobbles Brown/Gray,Wet. ° ° °o wm se o very-Dense.Gra-nTr Non-Plastic/Low o D C Plasticity of Fines,(GM) 0 o ° °0 oD 0 o ° o D 0 0 D 0 ° o °° o D o O D O ° o °o o D 0 a D O ° 0 00 o b 0 %9C - End of Test Pit a' c� 4 N n O C7 Q J — LOG OF TEST PIT TP-04 PLATE RimrOCk Engineering J&D Family Minor Subdivision - Phase 1 and 2 1 of 1 o g g Lots 1, 2, & 3- Billion Auto Plaza Ln Y Bozeman, Montana o Drafted By: W Reynolds Pro)ect No. 07-115-03 6 Fr IDate 7/1/2010 File Number. Big Sky Land Consulting, LLC RmW EIU—..V -- Date Completed 6/21/2010 Logged By W R=nlrlc Location 5 ft.NW of Surveyed/Staked Point# 10129-See Site Map,Plate 2.Appendix A Drill Operator Duneman Construction Method Rubber Tired Backhoe Elev Top of Hole 4799 Total Depth 80 Groundwater Depth I 2.5 F 1 2.5 r M x z O } m w o, w w a w DESCRIPTION NOTES J J W (n j a am �r 0 r w o- 2 2-5 00 0 o ca. w 0 va) (nn Z iL� topsoil Organic/Lean Clay.Black,Soft/Very Soft. '•;�.'';; Moist/saturated,High Plasticity_(OUCL) Lean Cl Gray with Redchsh Brown Mottling,Wet Very Soft. High Plasticity,(CL) Lean Cla with Trace/Some Gravel Gray with Reddish Brown an ig ray onling,Wet v&TSoT1. High Plasticity,(CL) 0— Silty Gravel with Sand and Cobbles Brown/Gray Wet. °0 IR ium nse o erryy Dense, ranu ar Non-Plastic/Low o D Plasticity of Fines (GM) 0 o D 0 o D 0 o D 0 0 0 °0 o D O �o D 0 o 3° °o O D O 0 o °0 o D 0 o D 0 End of Test Pit a 790 c7 4 7 0 U' O LOG OF TEST PIT TP-05 PLATE C J&D Family Minor Subdivision- Phase 1 and 2 1 of 1 Rimrock Engineering Lots 1, 2, & 3- Billion Auto Plaza Y — Bozeman. Montana o Drafted By: W Reynolds Project No. 07-115-03 Date: 7/1/2010 File Number Big Sky Land Consulting, LLC Rmodc Erprrer u Date Completed 6/21/2010 Logged By W Reynnlris Location 10 ft S of Surveyed/Slaked Point# 10110-See Site Map,Plate 2.Appendix A Drill Operator Duneman Construction Method Rubber Tired Backhoe Elev Top of Hole 4797 Total Depth 80 Groundwater Depth. 2.8 F 1 2.8 LIJ z a O } 0) w w w a w DESCRIPTION NOTES a amF wo En cant m� tj �c �Tooil Organic/Lean Clay,Black,Soft/Very Soft. oifVl st/5afurated,High Plasticity,(OUCL) Lean Clay Gray with Reddish Brown Mottling,Wet,Very Soft. g-F Plasticity (CL) 795 o Silt Gravel with Sand and Cobbles Brown/Gray,Wet. ° ° °o win Dense o very rise. ranu ar Non-Plastic/Low o D Plasticity of Fines,(GM) 0 o ° °o o D 0 Ic Cl o D 0 o D 0 o ° °o o 1) 0 o D 0 o ° °o — o D IC Cl 0 o ° °o o D 0 o °1.o End of Test Pit a' 0 T O 0 J LOG OF TEST PIT TP-06 PLATE J&D Family Minor Subdivision - Phase 1 and 2 1 of 1 Rimrock Engineering Lots 1, 2 & 3 Billion Auto Plaza y Bozeman, Montana p o Drafted By W Reynolds Project No. 07-115-03 (� Date 7/1/2010 File Number I Big Sky Land Consulting. LLC Date Completed 6/21/2010 Logged By. W Re molds Location 10 ft NE of Surveyed/Staked Point# 10119-See Site Map,Plate 2.Appendix A Doll Operator Duneman Construction Method. Rubber Tired Backhoe Elev.Top of Hole 4797 Total Depth 80 Groundwater Depth: I SZ 3.0 F 1 3.0 a x p r m� a o = J J w > DESCRIPTION NOTES w a � � g2 pp O ❑ a w o U)i U)Z m Lk 0 w Ir 19 Tooil Organic/Lean Clay,Black.Soft/Very Soft, orM st/5aturated,High Plasticity,(OUCL) ��•'JTv•: Lean Clay Gray,with Reddish Brown Mottling,Wet,Very Soft, rH gh Plasticity,(CL) X M - Lean Cla with Trace/Some Gravel Gray with Reddish Brown an rg ray 'TUing, Wet,very Soft, High Plasticity.(CL) o — Silt Gravel with Sand and Cobbles Brown/Gray.Wet ense o erryy ense. ranuFar Non-Plastic/Low o D Plasticity of Fines.(GM) 0 0 ° °0 )o D 0 0 ° °0 o D 0 o ° o D 0 0 ° °0 o D O o D 0 ° ° °0 a °° o D 0 End of Test Pit 4 0 O O LOG OF TEST PIT TP-07 PLATE Rimrock Engineering J&D Family Minor Subdivision - Phase 1 and 2 1 of 1 g g Lots 1, 2, & 3- Billion Auto Plaza Y Bozeman. Montana c Drafted By. W Reynolds Protect No. 07-115-03 Date: 7/1/2010 File Number Big Sky Land Consulting, LLC Date Completed 6/21/2010 Logged By W Rr ynnlric Location 5 ft S of Surveyed/Staked Point# 10115-See Site Map,Plate 2,Appendix A Drill Operator Duneman Construction Method Rubber Tired Backhoe Elev Top of Hole 4794 Total Depth 80 Groundwater Depth I V.2 5 F125 uJ z a o m W > � O a- 01 o Q = w J W > DESCRIPTION NOTES > a o m �:�- p r 2 �2 Q. a w Q Q� -JO w 0 m w O to cn Z in u_ X 12� O + ToTooil OrganiGLean Clay,Black.SoftNery Soft, :� ,•� MP—Sat si/5aturated, High Plasticity,(OL/CL) +,•. :�� Lean Cola Gray with Reddish Brown Mottling,Wet,Very Soft, High Plasticity,(ay Moisture Content=28 2% Minus 200=55% Plastic Index=17 o Silty Gravel with Sand and Cobbles Brown/Gray,Wet, °o wm nse to very Dense,Gra ar Non-PlastiULOW 10 0< Plasticity of Fines,(GM) 0 790 o D O o o D IC 0 0 o D 0 o ° °o o D O 0 o ° °o o D 0 o ° °o o D 0 End of Test Pit a' 785 c� R 0 C� O _ J Q LOG OF TEST PIT TP-08 PLATE Rimrock En ineerin J&D Family Minor Subdivision - Phase 1 and 2 1 of 1 o g g Lots 1, 2. & 3- Billion Auto Plaza o Drafted By' W Reynolds Protect No-: 07-115-03 Bozeman, Montana 10 Date 7/1/2010 File Number: Big Sky Land Consulting, LLC R—*E Q.—M Date Cornpleted 6/21/2010 Logged By. W Reynnlris Location 5 ft N of SurveyedrStaked Points! 10113-See Site Map,Plate 2,Appendix A Drill Operator Duneman Construction Method Rubber Tired Backhoe Elev Top of Hole 4793 Total Depth 80 Groundwater Depth 12.0 F 1 2.0 W x x z in w > o, OF W w i a w � DESCRIPTION NOTES Q F 0- a-M p _E W a 2 22 00 rJ 0 m J J W Q Q D O W Q W O (n (n Z rD W tr 13� 0 To I oi M Organic/Lean Clay,Black,Soft/Very Soft, �:�„.:•�;� st/5aturated,High Plasticity,(OL/CL) Lean Clay Gray with Reddish Brown Mottling,Wet,Very Soft, rFi gFi�city.(CL) o Silt Gravel with Sand and Cobbles Brown/Gray,Wet, o ° °o wm ense to very Dense,Granular Non-Plastic/Low Plasticity of Fines,(GM) 0 o ° °o o D DC C1 0 o ° °o o D 0 o ° °o o D 0 — ° ° °° o D 0 o ° °o gJo D Dc Cl 0 o ° °o o D 0 o ° °o a D 0 o ° °o o D � oll End of Test Pit a O 4 0 O LOG OF TEST PIT TP-09 PLATE Rim Engineering J&D Family Minor Subdivision - Phase 1 and 2 1 of 1 o g g Lots 1, 2, & 3- Billion Auto Plaza x Bozeman, Montana 11 0 Drafted By W Reynolds Project No.: 07-115-03 Fr Date 7/1/2010 File Number: BigSkyLand Consulting. LLC Date Completed 6/21/2010 Logged By W Revnnlds Location 5 ft S of Surveyed/Staked Point# 10105-See Site Map. Plate 2,Appendix A Drill Operator Duneman Construction Method. Rubber Tired Backhoe Elev Top of Hole 4791 Total Depth 8 0 Groundwater Depth I SZ 2A F 1 2.0 ZZ W x Z mO W > rn t= w w o w � DESCRIPTION NOTES Q = J J W Cn > U > F a am O t w Q Q� OJO U 0 T W rn Cn 7- [D 0 U' ToTo oil OrganictLean Clay,Black,Soft/Very Soft, moist/bat urated,High Plasticity,(OUCL) Lean Clay Gray with Reddish Brown Mottling,Wet,Very Soft, iH gh Plasticity,(CL) o Silt Gravel with Sand and Cobbles Brown/Gray.Wet. ium Dense to very Dense, rams ar Non-Plastic/Low o D Plasticity of Fines.(GM) 0 o D 0 a 0, D Ic 0 o ° °o o D 5 ° OR, °o o D Ic 0 o ° °o 785 o D 0 o ° °o o D 0 o ° °o o D 0 a ° °a 10 0 0 End of Test Pit a c7 4 0 O O _ J LOG OF TEST PIT TP-10 PLATE Rimrock En ineerin 3&D Family Minor Subdivision- Phase 1 and 2 1 of 1 o g g Lots 1, 2, &3- Billion Auto Plaza Vl Y Bozeman, Montana o Drafted By W Reynolds Protect No 07-115-03 12 Date 7/1/2010 Fite Number Big Sky Land Consulting, LLC UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS USCS TYPICAL SYMBOL DESCRIPTIONS GW WELL-GRADED GRAVELS,GRAVEL-SAND CLEAN GRAVELS : MIXTURES WITH LITTLE OR NO FINES GRAVELS WITH LITTLE OR NO FINES POORLY-GRADED GRAVELS.GRAVEL-SAND(More than half of c GP MIXTURES WITH LrTTLE OR NO FINES coarse fraction Q is larger than the#4 sieve) o GM SILTY GRAVELS.GRAVEL-SILT-SAND GRAVELS MIXTURES COARSE WITH OVER GRAINED 12% FINES CLAYEY GRAVELS.GRAVEL-SAND-CLAY SOILS GC MIXTURES (More than half SW WELL-GRADED SANDS,SAND-GRAVEL of material CLEAN SANDS MIXTURES WITH LITTLE OR NO FINES Is larger than SANDS WITH LITTLE the#200 sieve) (More than half of OR NO FINES coarse fraction Sp POORLY-GRADED SANDS,SAND-GRAVEL is smaller than is WITH LITTLE OR NO FINES the#4 sieve) SM SILTY SANDS,SAND-GRAVEL-SILT MIXTURES SANDS WITH OVER 12% FINES SC CLAYEY SANDS,SAND-GRAVEL-CLAY MIXTURES INORGANIC SILTS&VERY FINE SANDS, M L SILTY OR CLAYEY FINE SANDS CLAYEY SILTS WITH SLIGHT PLASTICITY SILTS AND CLAYS INORGANIC CLAYS OF LOW TO MEDIUM C,L PLASTICITY.GRAVELLY CLAYS,SANDY CLAYS. (Liquid limit less than 50) SILTY CLAYS.LEAN CLAYS FINE — GRAINED — SOILS — OL ORGANIC SILTS&ORGANIC SILTY CLAYS OF LOW PLASTICITY (More than half M H INORGANIC SILTS.MICACEOUS OR of material DIATOMACEOUS FINE SAND OR SILT Is smaller than the#200 sieve) SILTS AND CLAYS CH INORGANIC CLAYS OF HIGH PLASTICITY. (Liquid limit greater than 50) FAT CLAYS OH ORGANIC CLAYS&ORGANIC SILTS OF MEDIUM-TO-HIGH PLASTICITY LOAMS UNDER USDA SOIL CLASSIFICATION SYSTEM, SOIL OF APPROXIMATELY EQUAL SANDISILT/CLAY a' c� 4 UNIFIED SOIL CLASSIFICATION SYSTEM PLATE ��Rimrock Engineering J&D Family Minor Subdivision - Phase 1 and 2 g g Lots 1. 2, & 3- Billion Auto Plazain 13 x Bozeman, Montana U °0 Drafted By. W.Reynolds Project No.: 07-115-03 2 Date: 7/1/2010 File Number: BigSkyLand Consulting, LLC CW rW%Rm ck Erg-W.Inc.2003 LOG SYMBOLS PERCENT FINER BULK BAG SAMPLE -4 THAN THE NO 4 SIEVE (ASTM Test Method C 136) PERCENT FINER MODIFIED CALIFORNIA SAMPLER -200 THAN THE NO 200 SIEVE (2-112 inch outside diameter) (ASTM Test Method C 117) CALIFORNIA SAMPLER LL LIQUID LIMIT (3 inch outside diameter) (ASTM Test Method D 4318) STANDARD PENETRATION PLASTICITY INDEX SPLIT SPOON SAMPLER PI (ASTM Test Method D 4318) (2 inch outside diameter) El EXPANSION INDEX ti GEOPROBE (UBC STANDARD 29-2) COL COLLAPSE POTENTIAL ROCK CORE V WATER LEVEL UC ASTMNT N ED Method D 2ESSION (level where first encountered) 166) WATER LEVEL (level after completion) Ii SEEPAGE MC MOISTURE CONTENT (ASTM Test Method D 2216) GENERAL NOTES 1 Lines separating strata on the logs represent approximate boundaries only Actual transitions may be gradual 2 No warranty is provided as to the continuity of soil conditions between individual sample locations 3.Logs represent general sod conditions observed at the pant of exploration on the date indicated 4 In general Unified Soil Class6cation System designations presented on the logs were evaluated by visual methods only Therefore,actual designations(based on laboratory tests)may vary a 4 LOG KEY PLATE x J&D Family Minor Subdivision - Phase 1 and 2 Rimrock Engineering Lots 1, 2. &3- Billion Auto Plaza 13 Y Bozeman, Montana 4 o Drafted By. W Reynolds Project No- 07-115-03 Date: 7/12010 File Number: Big Sky Land Consulting, LLC CmyrgM thnork Erpn+M+V,Irr:f10 i SIEVE SIZE 3" 1-1/2" 3/4" 3/8" #4 #8 #10 #16 #30 #40 #50 #100 #200 100 -- — 90 80 70 z rn Q a z 50 w U tY a 40 30 20 10 0 10 1 01 PARTICLE SIZE IN MILLIMETERS coarse fine coarse medium fine GRAVEL SAND LEGEND: SOURCE DEPTH COBBLES GRAVEL SAND FINES DESCRIPTION (ft) (%) (%) (%) (%) • TP-01 15 0 0 38 62 SANDY LEAN CLAY(CL) m TP-08 2.0 0 18 26 55 SANDY LEAN CLAY with GRAVEL(CLi 0 a' r, SIEVE ANALYSIS PLATE Rimrock En ineerin J&D Family Minor Subdivision - Phase 1 and 2 1 of 1 g g Lots 1. 2, &3- Billion Auto Plaza 15 Y Bozeman, Montana o Drafted By W Reynolds Protect No 07-115-03 Date- 7/1/2010 File Number CoprgN R— *Erp—Mm 1.2003 60 70 80 90 100 GROUP UNIFIED SOIL CLASSIFICATION / 60 SYMBOL FINE GRAINED SOIL GROUPS / Organic sifts and organic silly Z clays of low plasticity / p - / U LINE /AL Inorganic clayey silts to very / Q ® fine sands of slight plasticity 50 Z a Inorganic clays of low 77 J to moderate plasticity y / a ® / Organic clays of moderate to high / x plasticity,organic siltsLU / ❑ Inorganic silts and / clayey silts / 40 Inorganic clays ofEl d high plasticity / / X / W / 0 3 / // - 30 H / U n rn W Q � J 2FCQ// a 20 / m 10 �'� 10 I r OL I 0 10 20 30 40 50 60 70 80 90 100 LIQUID LIMIT (LL) LEGEND: SOURCE DEPTH LL PL PI DESCRIPTION • TP-01 1.5 45 23 22 SANDY LEAN CLAY(CL) Q TP-08 2.0 35 18 17 SANDY LEAN CLAY with GRAVEL(CL) 0 a m 4 O PLASTICITY CHART PLATE cr J&D Family Minor Subdivision- Phase 1 and 2 Rimrock Engineering Lots 1, 2, & 3- Billion Auto Plaza Y Bozeman, Montana 16 o Drafted By W.Reynolds Project No.: 07-115-03 Date: 7N/2010 File Number: Big Sky Land Consulting. LLC copynyY ianrrx*E gr—rffq,Im 2003 APPENDIX B Suggested Specifications For Earthwork Construction APPENDIX B SUGGESTED SPECIFICATIONS FOR EARTHWORK AND PAVEMENT CONSTRUCTION BILLION AUTO PLAZA BOZEMAN, MONTANA 1.0 GENERAL 1.1 Scope - The work done under these specifications shall include clearing, stripping. removal of unsuitable material, excavation. preparation of natural soils, placement and compaction of on-site and imported structural fill material, and placement and compaction of pavement materials 1.2 Contractor's Responsibility - A geotechnical investigation was performed for the project by Rimrock Engineering dated July 1. 2010. The Contractor shall attentively examine the site in such a manner that he can confirm existing surface conditions with those presented in the geotechnical report. He shall satisfy himself that the quality and quantity of exposed materials and subsurface soil or rock deposits have been satisfactory represented by the Geotechnical Engineer's report and Civil Engineer's drawings. Any discrepancy that may be of prior knowledge to the Contractor or that is revealed through his investigations shall be made available to the Owner. It is the Contractor's responsibility to review the attached report prior to construction. The selection of equipment for use on the project and the order of work will similarly be his responsibility such that the requirements included in following sections have been met. 1.3 Geotechnical Engineer - The work covered by these specifications shall be observed and tested by the Geotechnical Engineer, Rimrock Engineering. who shall be hired by the Owner The Geotechnical Engineer will be present during the site preparation and grading to observe the work and to perform the tests necessary to evaluate material quality and compaction. The Geotechnical Engineer shall submit a report to the Owner. including a tabulation of all tests performed. The costs of retesting of unsuitable work performed by the Contractor shall be deducted from the payments to the Contractor. 1.4 Standard Specifications - Where referred to in these specifications, "Standard Specifications" shall mean the current Montana Public Works Standard Specifications dated April 2010. 07-115-03 Page 1 of 5 July 1, 2010 Rimrock Engineering, Inc. 1.5 Compaction Test Method - Where referred to herein, relative compaction shall mean the in-place dry density of soil expressed as a percentage of the maximum dry density of the same material. as determined by ASTM D698 Compaction Test Procedure. Optimum moisture content shall mean the moisture content at maximum dry density as determined above 2.0 SITE PREPARATION 2.1 Clearinq - Areas to be graded shall be cleared and grubbed of all vegetation and debris. These materials shall be removed from the site by the Contractor. 2.2 Stripping - Surface soils containing roots and organic matter shall be stripped from areas to be graded and stockpiled or discarded as directed by the Owner. In general, the depth of stripping of the topsoil will be approximately six inches. Deeper stripping, where required to remove weak soils or accumulations or organic matter, shall be performed when determined by the Geotechnical Engineer. Strippings shall be removed from the site or stockpiled at a location designated by the Owner. 2.3 Removal of Existing Fill - Existing fill soils, trash, and debris in the areas to be graded shall be removed prior to the placing of any compacted fill. Portions of any existing fills that are suitable for use in compacted fill may be stockpiled for future use. All organic material. topsoil, expansive soils. oversize material or other unsuitable material shall be removed from the site by the Contractor or disposed of at a location on site, if so designated by the Owner. 2.4 Ground Surface - The ground surface exposed by stripping shall be scarified to a depth of six inches, moisture conditioned to the proper moisture content for compaction. and compacted as required for compacted fill Recompaction shall be approved by the Geotechnical Engineer prior to placing fill. 3.0 EXCAVATION 3.1 General - Excavations shall be performed to the lines and grades indicated on the plans. The data presented in the geotechnical investigation report is for information and only the Contractor shall make his own interpretation with regard to the methods and equipment necessary to perform the excavation and to obtain material suitable for fill. 3.2 Materials - Soils which are removed and are unsuitable for fill should be placed in non-structural areas of the project. When necessary, these soils may be placed in deeper fills if approved by the Geotechnical Engineer. 07-115-03 Page 2 of 5 July 1, 2010 Rimrock Engineering, Inc. 3.3 Treatment of Exposed Surface - The ground surface exposed by excavation shall be scarified to a depth of six inches, moisture conditioned to the proper moisture content for compaction, and compacted as required for compacted fill. Recompaction shall be approved by the Geotechnical Engineer prior to placing fill. 4.0 STRUCTURAL FILL 4.1 Limits — Structural fill, if required for fill beneath foundations or concrete sla-on- grade should be medium dense to dense gravel with sand. 4.2 Material —We recommend the gradation for structural fill be 100% passing the 3- inch sieve. 25 to 65% passing the No 4 sieve, and no more than 20% minus No. 200 sized material The structural fill should have a liquid limit less than 25 and a plasticity index less than 15. 4.3 Placement - All fill materials shall be placed in layers of eight inches or less in loose thickness and uniformly moisture conditioned. The lift should then be compacted with approved compaction equipment to achieve at least 98% relative compaction in areas under structure foundations. No fill material shall be placed, spread. or rolled while it is frozen or thawing, or during unfavorable weather conditions. 4.4 Benching - Fill placed on slopes steeper than 5 horizontal to 1 vertical shall be keyed into firm, native soils or rock by a series of benches. Benching can be conducted simultaneously with placement of fill. However, the method and extent of benching shall be checked by the Geotechnical Engineer. 4.5 Compaction Equipment - The Contractor shall provide and use sufficient equipment of a type and weight suitable for the conditions encountered in the field. The equipment shall be capable of obtaining the required compaction in all areas, including those that are inaccessible to ordinary rolling equipment. 4.6 Recompaction - When, in the judgment of the Geotechnical Engineer, sufficient compaction effort has not been used, or where the field density tests indicate that the required compaction or moisture content has not been obtained, or if "pumping" or other indications of instability are noted, the fill shall be reworked and recompacted as needed to obtain a stable fill at the required density and moisture content prior to placing additional fill materials. 4.6 Responsibility - The Contractor shall be responsible for the maintenance and protection of all embankments and fills made during the contract period and shall 07-115-03 Page 3 of 5 July 1, 2010 Rimrock Engineering, Inc bear the expense of replacing any portion which has become displaced due to carelessness, negligent work, or failure to take proper precautions. 5.0 UTILITY TRENCH BEDDING AND BACKFILL 5.1 Material - Pipe bedding shall be defined as all material within six inches of the perimeter of the pipe. Backfill shall be classified as all material within the remainder of the trench. Material for use as bedding shall consist of clean, granular materials. and shall conform to requirements for bedding material listed in the Standard Specifications. 5.2 Placement and Compaction - Pipe bedding shall be placed in thin layers not exceeding eight inches in loose thickness, and conditioned to the proper moisture content for compaction. All other trench backfill shall be placed in thin layers not exceeding eight inches in loose thickness, conditioned to the proper moisture content, and compacted as required for adjacent fill. If not specified, backfill should be compacted to at least 97% relative compaction in areas under structures, utilities, roadways, parking areas, concrete flatwork, and to 90% relative compaction in undeveloped areas. 6.0 AGGREGATE BASE FOR CONCRETE SLABS 6.1 Material - Aggregate base for concrete slabs shall consist of crushed base rock conforming to requirements of the Standard Specifications. 6.2 Placement - Aggregate base shall be compacted and kept moist until placement of concrete. Compaction shall be by suitable vibrating compactors. Aggregate base shall be placed in layers not exceeding eight inches in thickness. Each layer shall be compacted by at least four passes of the vibratory compaction equipment or until 95% relative compaction has been obtained. 7.0 SUBGRADE AND AGGREGATE BASE FOR PAVED AREAS 7.1 Subgrade and Subbase Preparation - After completion of the utility trench backfill and prior to placement of aggregate base. the upper six inches of subgrade soil shall be uniformly compacted to at least 95% relative compaction This may require scarifying, moisture conditioning. and compacting in both cut and fill areas. 07-115-03 Page 4 of 5 July 1, 2010 Rimrock Engineering, Inc 7.2 Aggregate Base - Aggregate materials shall meet the requirements of the appropriate sections of the "Standard Specifications" for 1-1/2 Minus Crushed Base Rock. The aggregate base materials must be approved by the Geotechnical Engineer prior to use. After the subgrade is properly prepared, the aggregate base shall be placed in layers, moisture conditioned as necessary, and compacted by rolling to at least 95% relative compaction. The compaction thickness of aggregate base shall be as shown on the approved plans. 8.0 ASPHALT CONCRETE PAVEMENT 8.1 Thickness - The compacted thickness of asphalt concrete shall be shown on the approved plans. 8.2 Materials - Aggregate materials for asphalt concrete shall conform to the requirements listed for Type B or Type S-3 bituminous aggregates in Section 02503-2.2.3 of the "Standard Specifications " Asphalt concrete mixes shall utilize asphalt cement meeting the requirements of Section 02510 of 'Standard Specifications'. The Contractor shall submit a proposed asphalt concrete mix design to the Owner for review and approval prior to paving. The mix design shall be based on the Marshall Method. 8.3 Placement and Compaction - The asphalt concrete material and placement procedures shall conform to appropriate sections of the "Standard Specifications." The asphalt concrete material shall be compacted to a minimum of 92% of the Theoretical Maximum Rice Specific Gravity. 07-115-03 Page 5 of 5 July 1, 2010 Rimrock Engineering. Inc APPENDIX C Application for Authorization to Use APPENDIX C APPLICATION FOR AUTHORIZATION TO USE BILLION AUTO PLAZA BUILDING LOTS, UTILITIES AND STREETS BOZEMAN, MONTANA Big Sky Land Consulting, PLLC 5530 Burnt Road Bozeman, MT 59714 To whom it may concern Applicant understands and agrees that the "Preliminary Geotechnical Investigation Report, Billion Auto Plaza, Building Lots. Streets and Utilities" dated July 1. 2010, Job No. 07-115-03, for the subject site is a copyrighted document, that Rimrock Engineering. Inc. is the copyright owner and that unauthorized use or copying of said document for the subject site is strictly prohibited without the express written permission of Rimrock Engineering, Inc. Applicant understands that Rimrock Engineering, Inc. may withhold such permission at its sole discretion, or grant permission upon such terms and conditions as it deems acceptable. Applicant agrees to accept the contractual terms and conditions between Rimrock Engineering, Inc. and Big Sky Land Consulting. PLLC originally negotiated for preparation of this document. Use of this document without permission releases Rimrock Engineering, Inc. from any liability that may arise from use of this report To be Completed by Applicant (company name) (address) (city. state, zip) (telephone) (FAX) By Title: Date For Rimrock Engineering,Inc.'s use only approved for re-use with additional fee of S disapproved. report needs to be updated By. (Rimrock Engineering, inc-project manager) Date. 07-115-03 July 1, 2010 Rimrock Engineering, Inc.