HomeMy WebLinkAboutResolution No. 4277, Change order 12, Lower Yard Vehicle Maintenance and HRDC Bus Barn.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: James Goehrung, Director of Facility Services Chuck Winn, Assistant City Manager SUBJECT: Approve Resolution 4277 authorizing the City Manager to sign Change Order #12 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn for additional footing, foundation, and reinforcement work based on the final steel building design. MEETING DATE: September 13, 2010 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4277 authorizing the City Manager to sign Change Order # 12 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn for additional footing, foundation, and reinforcement work based on the final steel building design, in the amount of $5,834.27. The additional foundation components will be split 50/50 with HRDC and the city will pay an additional $225.00, (CP #19), for added reinforcement under the vehicle maintenance lift. Total cost for the city on this change order is $6,059.27. BACKGROUND: The two service bay areas of the building for the city and for HRDC are prefabricated metal buildings. The general configuration of these types of buildings is a post and beam skeleton with a metal skin. The posts, or columns, sit on footings which bear the bulk of the building weight. The details and dimensions of the required building for the project were outlined in the bid documents. Once the project was bid and we knew who the building manufacturer was, the design details of the building foundation components could be engineered. After the bids were received, the bids were reviewed the contractor who in turn selected the prefabricated building and took them on as their sub-contractor. The design team reviewed the drawings supplied by the building manufacturer. An analysis of the building load calculations required some modifications to the pier and footing sizes for the building. The net result of the final calculations and design was an increase in the number and the size of the footings and piers. The additional costs are not for the design, but for the additional materials and labor. The added work and materials included earthwork, concrete form placement 55 and finishing, concrete, concrete pumping, and added metal reinforcement. Total cost for this additional work is $11,893.54. Included in this cost is the additional reinforcement needed under the slab area where one of the larger vehicle maintenance lifts will be placed. The added reinforcement under this area of the city side of the building is $225.00. This portion of the cost will be paid by the city and the remaining balance of $11,668.54 will be split with HRDC. UNRESOLVED ISSUES: No others related to this proposed Change Order. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: The costs associated with the redesigned and reengineered footing and foundation will be paid out of the project contingency fund. The summary of activity is shown below. Pre-Construction Change Orders $15,650.00 CO #4 Fire Alarm Design ($1,994.50) CO#4 Welding Vent Hood ($5,000.00) CO#5 Hose Bibs ($913.00) CO#5 Utility Separation ($522.50) CO#9 Electrical Panel and Heat Tape ($1,369.10) TOTAL Pre–Const CO Balance Remaining $5,850.90 Project Contingency $128,501.70 Change Order #1 HRDC $0 Change Order #2 Asbestos Remediation ($3,294.32) Asbestos Disposal ($1,545.50) ($4,839.82) Chance Order #3 Added Site Work ($2,362.30) Change Order #4 Costs above estimate for Welding Hood (revised) Included in the Pre-Const COs ($2,560.23) Change Order #5 Hose Bibs and Utility Separation costs addressed in Pre-Construction Change Order budget $0 Change Order #6 HRDC $0 56 Change Order #7 Modify the height of the parts counter and install a sliding glass window between the two work areas. ($1,097.80) Change Order #8 Revise foundation sub-grade preparation due to discover of unstable soils; Replace fill material in clarifiers; Add a second conduit run for phone and data. ($4,897.27) Change Order #9 Electrical panel and heat tape Addressed in the Pre-Construction Change Order budget $0 Change Order #10 Grout plug on clay pipe in storm water tank pit, $980.38; add three steel bollards for building protection $389.82 ($1,370.19) Change Order #11 Add an additional shutoff air valve for the compressed air valve, $424.60; Remove alternate No. 5 for the installation of the skylights, ($12,200.00). $11,775.40 Change Order #12 Additional footing, foundation, and reinforcement based on final building structural analysis ($6,059.27) Non-budget changes Pre-bid items charged to project ($3,310.93) Expenditures to Date ($14,722.41) Contingency Balance Remaining $113,779.29 Attachments: Change Order Form #12 Change Order Resolution # 4277 Report compiled on: August 16, 2010 57 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: James Goehrung, Director of Facility Services Chuck Winn, Assistant City Manager SUBJECT: Approve Resolution 4277 authorizing the City Manager to sign Change Order #12 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn for additional footing, foundation, and reinforcement work based on the final steel building design. MEETING DATE: September 13, 2010 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4277 authorizing the City Manager to sign Change Order # 12 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn for additional footing, foundation, and reinforcement work based on the final steel building design, in the amount of $5,834.27. The additional foundation components will be split 50/50 with HRDC and the city will pay an additional $225.00, (CP #19), for added reinforcement under the vehicle maintenance lift. Total cost for the city on this change order is $6,059.27. BACKGROUND: The two service bay areas of the building for the city and for HRDC are prefabricated metal buildings. The general configuration of these types of buildings is a post and beam skeleton with a metal skin. The posts, or columns, sit on footings which bear the bulk of the building weight. The details and dimensions of the required building for the project were outlined in the bid documents. Once the project was bid and we knew who the building manufacturer was, the design details of the building foundation components could be engineered. After the bids were received, the bids were reviewed the contractor who in turn selected the prefabricated building and took them on as their sub-contractor. The design team reviewed the drawings supplied by the building manufacturer. An analysis of the building load calculations required some modifications to the pier and footing sizes for the building. The net result of the final calculations and design was an increase in the number and the size of the footings and piers. The additional costs are not for the design, but for the additional materials and labor. The added work and materials included earthwork, concrete form placement 58 and finishing, concrete, concrete pumping, and added metal reinforcement. Total cost for this additional work is $11,893.54. Included in this cost is the additional reinforcement needed under the slab area where one of the larger vehicle maintenance lifts will be placed. The added reinforcement under this area of the city side of the building is $225.00. This portion of the cost will be paid by the city and the remaining balance of $11,668.54 will be split with HRDC. UNRESOLVED ISSUES: No others related to this proposed Change Order. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: The costs associated with the redesigned and reengineered footing and foundation will be paid out of the project contingency fund. The summary of activity is shown below. Pre-Construction Change Orders $15,650.00 CO #4 Fire Alarm Design ($1,994.50) CO#4 Welding Vent Hood ($5,000.00) CO#5 Hose Bibs ($913.00) CO#5 Utility Separation ($522.50) CO#9 Electrical Panel and Heat Tape ($1,369.10) TOTAL Pre–Const CO Balance Remaining $5,850.90 Project Contingency $128,501.70 Change Order #1 HRDC $0 Change Order #2 Asbestos Remediation ($3,294.32) Asbestos Disposal ($1,545.50) ($4,839.82) Chance Order #3 Added Site Work ($2,362.30) Change Order #4 Costs above estimate for Welding Hood (revised) Included in the Pre-Const COs ($2,560.23) Change Order #5 Hose Bibs and Utility Separation costs addressed in Pre-Construction Change Order budget $0 Change Order #6 HRDC $0 59 Change Order #7 Modify the height of the parts counter and install a sliding glass window between the two work areas. ($1,097.80) Change Order #8 Revise foundation sub-grade preparation due to discover of unstable soils; Replace fill material in clarifiers; Add a second conduit run for phone and data. ($4,897.27) Change Order #9 Electrical panel and heat tape Addressed in the Pre-Construction Change Order budget $0 Change Order #10 Grout plug on clay pipe in storm water tank pit, $980.38; add three steel bollards for building protection $389.82 ($1,370.19) Change Order #11 Add an additional shutoff air valve for the compressed air valve, $424.60; Remove alternate No. 5 for the installation of the skylights, ($12,200.00). $11,775.40 Change Order #12 Additional footing, foundation, and reinforcement based on final building structural analysis ($6,059.27) Non-budget changes Pre-bid items charged to project ($3,310.93) Expenditures to Date ($14,722.41) Contingency Balance Remaining $113,779.29 Attachments: Change Order Form #12 Change Order Resolution # 2277 Report compiled on: August 16, 2010 60 1 of 2 COMMISSION RESOLUTION NO. 4277 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #12, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 61 Resolution No. 4277 Change order #12 Page 2 of 2 PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 13th day of September, 2010. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: __________________________________________ GREG SULLIVAN City Attorney 62