HomeMy WebLinkAboutApprove Resolution No. 4278, Change Order 13, Lower Yard Vehicle Maintenance, HRDC Bus Barn.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: James Goehrung, Director of Facility Services Chuck Winn, Assistant City Manager SUBJECT: Approve Resolution 4278 authorizing the City Manager to sign Change Order #13 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn for additional fill dirt for sub-base material for road, parking areas, building footings, and foundations. MEETING DATE: September 13, 2010 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4278 authorizing the City Manger to sign Change Order #13 in the amount of $12,170.40, for the Lower Yard Vehicle Maintenance and HRDC Bus Barn for additional fill dirt for sub-base material for road, parking areas, building footings, and foundations. BACKGROUND: This change order has two components. First, is the volume of imported material needed to bring the site up to the proper finished grade. Second, is the quality of the material on-site and imported material brought onto the site. Because the quantities were not clearly definable, prior to actual excavation, the project contingency was increased so that we could pay for the material once the needed quantities were identified. The bid plans provide quantities based on surveys of the site and the existing topography of the site. There are some unknowns that were anticipated with these quantities because in some instances soils that are considered sub-standard need to be removed once excavation begins. Soil conditions are especially a concern at critical areas such as foundation bases that need to bear the weight of the building, road, or parking areas, or soils were found to retain too much moisture. The initial civil investigation that was conducted prior to the start of the Lower Yard Vehicle Maintenance and HRDC Bus Barn project showed soil conditions as highly variable on the site of the old waste water treatment plant. The investigative work included digging multiple potholes to assess soil conditions. Because we knew that proper fill material was going to need to be brought in, the bid specifications asked the bidders to provide a dollar cost per cubic yard for any imported fill material. 63 Fill materials fall into two categories - sub-grade, materials needed to bring the site up to specified elevations and; sub-base, material that meets certain specifications for load bearing capacity under footing, roads, and parking areas. There has been a good deal of discussion and documentation of which material is used for which purpose on the site. For examples, some soils may be fine to bring the area up to grade but not suitable for base material under load bearing areas. This change order lists only the cost for soils that the city has agreed were above specified bid quantities. The Engineering Department has been heavily involved in verification and approval of these quantities. Second, is the quality of the material used for sub-grade or sub-base. Some of the material we planned to use on the site was determined not to be acceptable after some additional testing. The volume of work out at the Water Reclamation Facility (WRF) resulted in an abundance of excavated material that the city was going to need to dispose of in some way or another and probably pay to have hauled. During the bidding process an addendum was issued that offered up 5,000 cubic yards of fill material that the bidders could opt to use on the Lower Yard Vehicle Maintenance and HRDC Bus Barn as a possible cost saving measure and a benefit to both projects. Further testing of the WRF soils resulted in a decision that they were not going to hold up for some applications. A verifiable quantity of 2,583 cubic yards of the 5,000 cubic yards that was originally offered up for the project now have to be imported. At the bid price of $8.80 per cubic yard, this accounts for $22.730.00 of Change Order #13. The other quantities and applications are: 160 cubic yards for sub-base footing fill at $1,408.00 and; 23 cubic yards to fill in one of the clarifying tanks left when the waste water plant was abandoned at $202.40. These costs will be shared with HRDC in a 50%/50% split. UNRESOLVED ISSUES: There are still some outstanding dirt issues on this project. The city has taken the position that some of the material used on the project should be included in the bid quantities and not eligible for a change order. Also we want to make sure that the estimated quantities on the project are accurate. The contractor can still come back and ask for reconsideration or provide additional documentation that will verify the materials used are above the bid price. If submitted they will be reviewed with the same level of scrutiny we have used to date. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: The costs associated with the importation of off-site sub-base material for the road, parking areas, and building footings will be paid out of the project contingency fund. The summary of activity is shown below. 64 Pre-Construction Change Orders $15,650.00 CO #4 Fire Alarm Design ($1,994.50) CO#4 Welding Vent Hood ($5,000.00) CO#5 Hose Bibs ($913.00) CO#5 Utility Separation ($522.50) CO#9 Electrical Panel and Heat Tape ($1,369.10) TOTAL Pre–Const CO Balance Remaining $5,850.90 Project Contingency $128,501.70 Change Order #1 HRDC $0 Change Order #2 Asbestos Remediation ($3,294.32) Asbestos Disposal ($1,545.50) ($4,839.82) Chance Order #3 Added Site Work ($2,362.30) Change Order #4 Costs above estimate for Welding Hood (revised) Included in the Pre-Const COs ($2,560.23) Change Order #5 Hose Bibs and Utility Separation costs addressed in Pre-Construction Change Order budget $0 Change Order #6 HRDC $0 Change Order #7 Modify the height of the parts counter and install a sliding glass window between the two work areas. ($1,097.80) Change Order #8 Revise foundation sub-grade preparation due to discover of unstable soils; Replace fill material in clarifiers; Add a second conduit run for phone and data. ($4,897.27) Change Order #9 Electrical panel and heat tape Addressed in the Pre-Construction Change Order budget $0 Change Order #10 Grout plug on clay pipe in storm water tank pit, $980.38; add three steel bollards for building protection $389.82 ($1,370.19) Change Order #11 Add an additional shutoff air valve for the compressed air valve, $424.60; 65 Remove alternate No. 5 for the installation of the skylights, ($12,200.00). $11,775.40 Change Order #12 Additional footing, foundation, and reinforcement based on final building structural analysis. ($6,059.27) Change Order #13 Structural fill for footings, foundation, road and parking areas. ($12,170.40) Non-budget changes Pre-bid items charged to project ($3,310.93) Expenditures to Date ($26,892.81) Contingency Balance Remaining $101,608.90 Attachments: Change Order Form #13 Change Order Resolution # 4278 Report compiled on: August 16, 2010 66 1 of 2 COMMISSION RESOLUTION NO. 4278 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #13, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 13th day of September, 2010. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: __________________________________________ GREG SULLIVAN City Attorney 67 69 70 71 72 73 74 75 76 77