HomeMy WebLinkAboutResolution 4271 Modification of Contract with BN Builders, Change Order 10, City Shops/HRDC Bus BarnCOMMISSION RESOLUTION NO. 4271
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF
CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA.
WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the
bid for the Construction of the Vehicle Maintenance Building and 11RDC Bus Barn to BN Builders,
Bozeman, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and/or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman,
a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #10,
attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and
directed to execute the contract change order for and on behalf of the City; and the City Clerk is
authorized and directed to attest such signature.
1 of 2
Roolution Vo 42 Change order 10
PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a
regular session thereof held on the 2nd day of August, 201
J VV i
bS
E FF
Mayor
ATTEST .- B 0
city
APPROVED AS TO FORM:
G SULLIVAN
City Attorney
Page 2 of 2
`
daw8mg V ��mdhobm | architects | |
JOINT OWNER CHANGE ORDER
Project: City Shops/ HRDC Bus Barn
1821 N. Rouse Ave
Bozeman, MT58715
To Contractor: BN Builders, Inc
2O8S Stadium Dc, Ste 102
Bozeman, N1T59715
The Contract im changed msfollows:
Increase Contract Sum.
Date: July 7, 2010 Owner IM
Architect 11
Architect's Project No: 08`285 Contractor
Field []
Contract Date. November 4.2U09 Other []
Contract For: General Construction
Reason for change:
OuUngexuawytkon that
appeared to be transporting groundwater from elsewhere on the site and filling the excavation area. Pumping
the water was unsuccessful due 10 the volume of water, and the critical nature of the cistern placement and
sub-grade soil preparation required the pipe be plugged, BN offered a solution of filling the pipe at both sides
of the excavation area with grout, and Stahly Engineering agreed this was an acceptable solution. (CP #24)
Three additional bollards were added to the site for extra protection of the building. These were reviewed with
Wade Johnson at the City of Bozeman who agreed the additional protection would be needed. (CP #27)
Aftmohment(s):
CP#24
CP# 27
Total Contract SumAdiostment
The original Contract Sum was 1,907,600.00
The net change by previously authorized Change Orders 47,483.21
The Contract Sum prior tm this Change Drdervvao
The Contract Sum will be increased by this Change Order by the amount o/ $ 2 , 7 40.38 ---
The new Contract Sum including this Change Order will be
City of Bozeman Contract Sum Adiustment:
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased }by this Change Order by the amount mf
(5O96nf Total Change Order)
The new Contract Sum including this Change Order will be
HRQC Contract Sum Adjustment:
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior tothis Change Order was
The Contract Sum will be increased by this Change Order by the amount of
(5096of Total Change Order)
The new Contract Sum including this Change Order will be
24 011. 01
074 �612,61
$ 881,840.77
$ 883.210.96
Contract Time, Adi ustment:
The Contract Time will be increased by 1tLo_LQ days.
The date of Substantial Completion xsof the date ofthis Change Order therefore is�
KNIN k 1961TA ki 1:4 'Am M
Not valid until signed by Architect, Contractor, and Owners.
Signatures:
C.O. #10
Architect: Dowling Sandholm Architects
By- - '
— Date: —
15 West 14" Street - Suite 103
Mike Wiseman
Helena, Mt 59601
Place Architecture
By:
— Date:
118 E. Main St
Sgsh Kazeminejad
Bozeman, MT, 59715
Contractor: BN Builders, Inc
By:.
Date: 7-9-to
2066 Stadium Dr., Ste 102
Scott Jay
Bozeman, MT 59715
Owner: City of Bozeman
B
D ater
P.O. Box 1230
Chris Kukulsk
Bozeman, MT 59771
Human Resource
Date: ,D
0
Development Council
Lee HazelbAer
32 South Tracy
Bozeman, MT 59715
Page 2 of 2
File 21f
CO-410—Joint,doe