HomeMy WebLinkAboutResolution 4271 Modification of Contract with BN Builders, Change Order 10, City Shops/HRDC Bus BarnCOMMISSION RESOLUTION NO. 4271 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and 11RDC Bus Barn to BN Builders, Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #10, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 1 of 2 Roolution Vo 42 Change order 10 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 2nd day of August, 201 J VV i bS E FF Mayor ATTEST .- B 0 city APPROVED AS TO FORM: G SULLIVAN City Attorney Page 2 of 2 ` daw8mg V ��mdhobm | architects | | JOINT OWNER CHANGE ORDER Project: City Shops/ HRDC Bus Barn 1821 N. Rouse Ave Bozeman, MT58715 To Contractor: BN Builders, Inc 2O8S Stadium Dc, Ste 102 Bozeman, N1T59715 The Contract im changed msfollows: Increase Contract Sum. Date: July 7, 2010 Owner IM Architect 11 Architect's Project No: 08`285 Contractor Field [] Contract Date. November 4.2U09 Other [] Contract For: General Construction Reason for change: OuUngexuawytkon that appeared to be transporting groundwater from elsewhere on the site and filling the excavation area. Pumping the water was unsuccessful due 10 the volume of water, and the critical nature of the cistern placement and sub-grade soil preparation required the pipe be plugged, BN offered a solution of filling the pipe at both sides of the excavation area with grout, and Stahly Engineering agreed this was an acceptable solution. (CP #24) Three additional bollards were added to the site for extra protection of the building. These were reviewed with Wade Johnson at the City of Bozeman who agreed the additional protection would be needed. (CP #27) Aftmohment(s): CP#24 CP# 27 Total Contract SumAdiostment The original Contract Sum was 1,907,600.00 The net change by previously authorized Change Orders 47,483.21 The Contract Sum prior tm this Change Drdervvao The Contract Sum will be increased by this Change Order by the amount o/ $ 2 , 7 40.38 --- The new Contract Sum including this Change Order will be City of Bozeman Contract Sum Adiustment: The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased }by this Change Order by the amount mf (5O96nf Total Change Order) The new Contract Sum including this Change Order will be HRQC Contract Sum Adjustment: The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior tothis Change Order was The Contract Sum will be increased by this Change Order by the amount of (5096of Total Change Order) The new Contract Sum including this Change Order will be 24 011. 01 074 �612,61 $ 881,840.77 $ 883.210.96 Contract Time, Adi ustment: The Contract Time will be increased by 1tLo_LQ days. The date of Substantial Completion xsof the date ofthis Change Order therefore is� KNIN k 1961TA ki 1:4 'Am M Not valid until signed by Architect, Contractor, and Owners. Signatures: C.O. #10 Architect: Dowling Sandholm Architects By- - ' — Date: — 15 West 14" Street - Suite 103 Mike Wiseman Helena, Mt 59601 Place Architecture By: — Date: 118 E. Main St Sgsh Kazeminejad Bozeman, MT, 59715 Contractor: BN Builders, Inc By:. Date: 7-9-to 2066 Stadium Dr., Ste 102 Scott Jay Bozeman, MT 59715 Owner: City of Bozeman B D ater P.O. Box 1230 Chris Kukulsk Bozeman, MT 59771 Human Resource Date: ,D 0 Development Council Lee HazelbAer 32 South Tracy Bozeman, MT 59715 Page 2 of 2 File 21f CO-410—Joint,doe