HomeMy WebLinkAboutNortheast Urban Renewal Board Annual Work Plan and Budget.pdf Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Erik Nelson, Board Chair
Keri Thorpe, Assistant Planner
Chris Saunders, Interim Planning Director
Chris Kukulski, City Manager
SUBJECT: Annual Work Plan and Budget for the Northeast Urban Renewal
Board (NURB)
MEETING DATE: July 19, 2010
AGENDA ITEM TYPE: Action Item
RECOMMENDATION: Consider a motion to approve the Annual Work Plan and Fiscal Year
2011 Budget for the Northeast Urban Renewal Board.
BACKGROUND: The Northeast Urban Renewal Board proposes a Work Plan and Budget
on an annual basis. See attached NURB Budget FY11 and supporting documents for Fiscal Year
2011.
UNRESOLVED ISSUES: None
ALTERNATIVES: As suggested by the City Commission.
FISCAL EFFECTS: Fiscal effects are described in the proposed budget
Attachments: NURB Annual Budget 2011
Ordinance No. 1655- Northeast Urban Renewal District Plan
Report compiled on: July 14, 2010
172
1
NORTHEAST URBAN RENEWAL BOARD BUDGET FY 2011 PROPOSAL TO THE
BOZEMAN CITY COMMISSION
The Bozeman City Commission with Mayor Jeff Kraus presiding adopted ordinance 1655 which
formally enacted the Northeast Urban Renewal Plan. The stated mission of the plan and general goals
are as follows:
MISSION VISION:
This Plan is the city s response to remedy the conditions of blight found in the August 2005 report The
Plan also addresses other issues important to the District The plans purpose is to ensure the vitality of
the Northeast Urban Renewal District (NURD) the vitality of the NURD for generations to come and to
make the NURD an area in which its citizens can take exceptional pride The Plan envisions a mixed
use neighborhood that is user friendly safe secure and healthy. While this plan envisions a District with
diversity of housing businesses and amenities it intends to maintain the unique ambiance and historic
character of the District.
Nine principals were developed for the plan for the plan. Each of the principals has one or more goals
associated with the plan some of which specifically relate to this work plan others represent general
objectives and directives. The Northeast Urban Renewal Board (NURB) goals are as follows:
GENERAL GOALS:
§ Outdated or insufficient infrastructure should be repaired, replaced, or otherwise
improved.
§ Provide public utilities to the area efficiently in ways that are not visually or physically
obtrusive.
§ Encourage a land use pattern that facilitates all modes of transportation – vehicular,
bicycle, pedestrian, mass transit, and commercial – for safe, efficient and convenient
access for residential, commercial, and industrial uses.
§ Harmonize commercial and industrial development with residential quality of life.
§ New structures should be designed and built keeping in mind the public values of
durability, flexibility, and simplicity. Thoughtful consideration of design, materials, and
massing in the construction of new private buildings will add strength and character to
the built environment. To the degree that the private sector can be influenced by a
public partner in development, the community ought to strongly encourage excellence in
urban design as a basis of partnership.
§ Promote sustainable building practices and design within the district
§ Procure new land for park and open space
§ Improve landscaping in existing public spaces
§ Neither the City of Bozeman nor any of its subdivisions shall use eminent domain to
173
July 14, 2010 2
take private property for private use in the implementation of an urban renewal project
or similar redevelopment plan.
§ Encourage the City to help ensure the success of the Northeast Urban Renewal Plan by
giving a high priority to the Northeast District in its capital improvements plan.
§ Work with neighborhoods and businesses to ensure actions taken in the district are
compatible with adjacent developed areas.
§ Work with the City to ensure actions taken outside of the District are compatible with
projects inside of the District
FY 2010 FY 2011
REVENUES
Starting Balance $ 73,253 $121,179
FY10 TIF $ 62,440
FY2011 TIF (anticipated) $ 62,440
Donation TD& H – Depot Park $ 2,000
Parks improvement Grant (50/50 matching grant) $ 20,000
HB 645/American Recovery and Reinvestment Act $ 18,600
Interest $ 2,492 $ 2,500
Total Funding $178,785 $186,119
FY 10 EXPENDITURES
Depot Park Engineering Services $ 7,000
Depot Park Phase I $ 24,079
Depot Park Phase II $ 3,010
Climbing Boulder $ 18,600
Depot Park Construction $ 45,689 $ 45,689
Neighborhood Development Plan $ 3,137
Administrative Services $ 1,780
$ 57,606
FY 11 PROPOSED EXPENDITURES
Priority 1 – Parks, Trails and Greenspace $ 54,100
Priority 2 – Infrastructure $ 93,000
Priority 3 – Neighborhood Planning $ 17,000
Priority 4 – Redevelopment Incentive Program $ 15,000
Staff Time $ 5,000
Administrative Services $ 2,019
Overall Budget Total $186,119
Over the last year the Northeast Urban Renewal Board began implementing plans and projects
reflecting their three funding priorities: 1) Parks, Trails and Greenspace; 2) Infrastructure and 3)
Neighborhood Development Plan. In 2010, the Board identified the creation of re-development
incentive program as a new priority. The redevelopment incentive program is related to priorities 2 and
3 in that the Board hopes to see some improvements to infrastructure by incentivizing redevelopment
of properties within the District and also fund projects that embrace their vision and the adopted plan
for the District.
174
3
I. PARKS, TRAILS AND GREENSPACE
Depot Park $ 22,800
In FY2010, The Board began implementing the previously approved plan for the Depot Park
located on Front Street near the old, abandoned passenger depot. The Board had allocated
$46,125 for Phase I and part of Phase II for Depot Park improvements in their FY2010 budget. Of
that budgeted amount, $20,000 came from a Park Improvement Grant (PIG) for Phase I
improvements. An additional $18,600 of the HB 645 funding was allocated for construction of a
climbing boulder within Phase II. To date, $45,689 has been paid for the Depot Park
improvements, plus $5,000 in engineering services ($7,000 less the $2,000 donation from TD& H
engineering). All $20,000 in PIG funds have been expended. All $18,600 of the HB 645 funds
have been expended.
The total construction and landscaping costs are $68,332. This is about $3,600 higher than
originally estimated and includes the installation of a dry well to control drainage around the
perimeter of the park and a recent change order for the installation of sod, in lieu of seeding.
$22,800 is the anticipated remaining cost for the Depot Park which will be paid by the TIF funds.
Depot Trail Area $ 3,000
The original trail, landscaping and bench installation were completed in 2002. An irrigation
system was never installed. To ensure survival of the trees and shrubs until they become
established, water is provided from an adjacent property. The Board wishes to assist with funding
the temporary irrigation of the trees and shrubs. The area is inundated with Canada thistle and
Common tansy, so weed control must also be implemented. MRL recently communicated to the
Board that they will not lease any of the MRL property for public use. As such, the funding for a
fence along the railroad track in FY 2010 has been removed. The proposed funding includes
continuing the operation of the temporary irrigation system, weed control and general
maintenance.
Aspen Street Right-of-Way Open Space Improvements $ 9,000
The Board has identified a section of the Aspen Street right-of-way between N. Ida and N.
Wallace as a potential open space location. The location’s close proximity to the Depot Park
provides a nice amenity for residents in the District. In FY 2010, the Board plans to investigate
the feasibility of enhancing this portion of the public right-of-way for the use of the residents.
Ideas include the creation of a community garden, trail connections, or general greenway
enhancements. The intention here is to preserve the right-of-way for construction of a street if
redevelopment of an adjacent parcel requires it; in the interim, the Board wishes to provide a use
that will enhance the neighborhood.
North Church Avenue Trail Improvements (Aspen to Tamarack) $ 4,300
Board members identified a section of trail in need of widening and signage within the N. Church
Avenue right-of-way between Aspen and Tamarack Streets. The existing trail extends from Aspen
to Tamarack Streets with a bridge crossing over Bozeman Creek. The Board plans to contact
GVLT and the City Parks Department to gather information on the trail's history, possible
improvement of the deficient trail section and the addition of signage. The Board is hopeful that
175
July 14, 2010 4
coupling these trail improvements with sidewalk improvements on Tamarack Street will greatly
improve pedestrian connectivity in the District.
Aspen Street Pedestrian Bridge $ 15,000
Board members identified the need for a pedestrian bridge at the terminus of E. Aspen Street and
the N. Church Avenue trail east of N. Rouse Avenue. E. Aspen Street comes to an end at Bozeman
Creek. The use along this section of E. Aspen Street is largely residential with a retail store
(butcher shop) at the southeast corner of N. Rouse Avenue and E. Aspen Street. The Board feels
the District’s pedestrian connectivity could be improved with the construction of a pedestrian
bridge to the N. Church Avenue Trail. City Engineering staff is working with the NURB and
Planning Staff obtain estimates for the engineering services and construction costs. The budgeted
amount is for engineering and design services. It’s unlikely the budgeted amount will cover the
full cost of the bridge.
Priority 1 Total $ 54,100
Priority 1 Rationale: The park, trail and green space improvements meet Guiding Principle 4
and Goals A & B under Principle 4 of the adopted Northeast Urban Renewal District Plan:
· Guiding Principle, “Public open space is essential to a healthy and appealing
urban environment”
· Goal A, “Procure new land for parks and public open space”
· Goal B, “Improve landscaping in existing public spaces.”- to include enhancing
boulevards and public rights-of-way by planting and maintaining trees where appropriate
and controlling weeds
The spending of TIF funds on park and open space improvements is allowed under 7-15-4255,
Authority to provide or contract for services related to urban renewal, of the Montana Code
Annotated. Specifically, item (1b) states that “Every municipality shall have power to install,
construct, and reconstruct streets, utilities, parks, playgrounds, and other public improvements”
II. INFRASTRUCTURE
Poor pedestrian connectivity within the District is well documented. Lack of street improvements
including missing curb, gutter, pavement and sidewalks creates an unwelcoming and potentially
unsafe environment for pedestrians and bicyclists. A lack of storm water drainage facilities leads
to the ponding of water in public right-of-ways encouraging pedestrians to walk in the street
emphasizing the need for street improvements. The District has a historic mix of light
manufacturing and residential uses creating a more urban environment on the streets, especially
during business hours. Modest improvements to pedestrian facilities to create safer more
welcoming routes for pedestrians will reduce conflict between users. The lack of street
delineation/improvements and storm water facilities has caused an unknown number of
individuals to use some sections of the District as dumping grounds for unwanted appliances and
furniture. Street improvements coupled with improvements to trails and parks and the
landscaping of public spaces will improve conditions for pedestrians and bicyclists and reduce, if
176
5
not eliminate, dumping in the public right-of-way.
Making improvements to sidewalks on unimproved streets comes with some difficulty especially
if elevation differences are present across the width of the right-of-way and if a need to improve
storm water drainage is warranted as well. What seems like a rather simple project turns into a
large scale street improvement project. Without additional information, moving forward on these
improvements is difficult, so survey and design is the next step. Regarding design, the Board
recognizes that creative solutions are needed to enhance the public right-of-way for two very
different user types in the District. In support of improvements to these streets, the Board has
allocated a portion of the FY11 budget to the following deficient street sections in the District:
Tamarack Street – Rouse Avenue to Front Street $ 38,000
Tamarack Street from Rouse Avenue to Front Street lacks curb, gutter and sidewalk. Storm water
drainage issues are present. The Board views this street as an important connector to existing
trails, future parks and open space areas in the District as well as the future sidewalk on Rouse
Avenue. Board is looking for innovative designs which will remedy the lack of pedestrian and
storm water retention facilities in the District while at the same time preserving the District
character. Initial survey and design needs to be completed to see what improvements are feasible.
Intersection of Front-Ida-Aspen Streets $ 17,000
The intersection area of these streets has drainage problems and lacks pedestrian connectivity.
With plans to improve the Depot Park and potentially the Aspen Street right-of-way as open
space, painted cross walks and additional street signage are short term needs which are easily
fulfilled once the Depot Park is improved. Over the longer term, the feasibility of upgrading the
street frontages of the Depot Park needs to be determined. Storm water drainage controls should
be integrated into any street improvements around the Depot Park. Initial survey and design needs
to be completed.
East Peach Street – Sidewalks $ 38,000
Missing sidewalk sections on E. Peach Street need to be installed and some existing sidewalk
sections need replacement between N. Rouse and N. Wallace Avenue. Board is looking for
innovative designs which will remedy the lack of pedestrian and storm water retention facilities in
the District while at the same time preserving the District character. Initial survey and design
needs to be completed.
Priority 2 Total $ 93,000
Priority 2 Rationale: The infrastructure improvements meet Guiding Principle 1 and Goals A &
B under Principle 1 of the adopted Northeast Urban Renewal District Plan:
· Guiding Principle, “Ensure the health, safety, and security of the District”
· Goal A, “Outdated or insufficient infrastructure should be repaired, replaced or
otherwise improved.”
· Goal B, “Encourage a land use pattern that facilitates all modes of transportation –
177
July 14, 2010 6
vehicular, bicycle, pedestrian, mass transit, and commercial – for safe, efficient and
convenient access for residential, commercial, and industrial uses.”
The spending of TIF funds on infrastructure improvements is allowed under 7-15-4288, Costs
that may be paid by tax increment financing, of the Montana Code Annotated. Specifically, item
(4) states that the following may be paid by tax increment financing, “the acquisition,
construction, and improvement of infrastructure…that includes streets, roads, curbs, gutters,
sidewalks, pedestrian malls, alleys, parking lots and off-street parking facilities, sewers, sewer
lines, sewage treatment facilities, storm sewers, waterlines,…
III. NEIGHBORHOOD DEVELOPMENT PLANNING
District Visioning Document $ 2,000
Assisted by Montana State University students from the Community Design Center within the
School of Architecture, the Board put together the first draft of this document to provide a
necessary supplement to the existing Urban Renewal plan. It outlines specific projects and ideas
that will further the goals and objectives of the plan. The current draft requires revisions.
Preserve America Grant Match $ 15,000
If the City is awarded the grant, the NURB has pledged to match up to $15,000 in funds towards
this grant. The Board acknowledges that of portion of the matching funds may be used to offset
the cost of City staff time spent managing the grant. The grant application proposes that a
professional historical architectural and engineering team be hired to examine the existing
conditions, evaluate the architectural integrity of the building, identify potential issues with the
site and study the feasibility of re-use opportunities at the site.
Priority 3 Total $ 17,000
Priority 3 Rationale: Neighborhood Development Plan meets Guiding Principle 2 and the Goal
under Principle 2 of the adopted Northeast Urban Renewal District Plan:
· Guiding Principles, “Balance commerce and livability in the District within the mixed-
use framework” AND “Honor the unique character and vitality of the District”
· Goal, “Harmonize commercial and industrial development with residential quality of
life”
· Implementation Action, “Where historic structures are affected by public or private
development, seek out the advice and assistance of local, state, or federal historic
preservation professionals for opportunities to renovate existing historic structures.”
The spending of TIF funds on the design of a Neighborhood Development Plan is allowed under
7-15-4254, Municipality power in the preparation of various plans, of the Montana Code
Annotated. Specifically, item (1a) states that “Every municipality shall have power, within the
municipality to make or have made all plans necessary to the carrying out of the purposes of this
178
7
part and to contract with any person, public or private, in making and carrying out such plans;”
IV. REDEVELOPMENT INCENTIVE PROGRAM
To support Principles 2 and 3 of the District Plan: “Balance commerce and livability in the District
within the mixed-use framework” and “Honor the unique character and vitality of the District”, and
foreseeing an opportunity to incentivize and guide re-development, the Board has requested that
staff create an incentive program to encourage needed rehabilitation of properties within the
District. The creation of this program will incentivize the implementation of the District Plan as it
relates to the following Goals and Implementation Actions listed within the Plan:
Goal: Harmonize commercial and industrial development with residential quality of life
Implementation Actions:
· Assure compatibility of land uses through appropriate urban design techniques
· Encourage commercial development that provides basic needs to the District.
· Encourage affordable housing
Goal: New structures should be designed and built keeping in mind the public values of
durability, flexibility, and simplicity. Thoughtful consideration of design, materials, and
massing in the construction of new private buildings will add strength and character to the
built environment. To the degree that the private sector can be influenced by a public partner
in development, the community ought to strongly encourage excellence in urban design as a
basis of partnership.
Implementation Actions:
· Where historic buildings and places exist, compatibility of design elements should
also enter into the planning of new construction
· Encourage the growth of cultural activities
Goal: Promote sustainable building practices and design within the district
Implementation Actions:
· Support projects and designs that promote Dark Skies
· Promote the use of indigenous plants and materials for landscaping and design
· Encourage the use of locally produced, renewable products.
· Promote environmentally sound development and construction practices
· Promote energy and resource-efficient systems within the District
Priority 4 Rationale: The spending of TIF funds on the creation and implementation of a
redevelopment incentive program is allowed under the following sections of the MCA:
Section 7-15-4233, subsection (1)(a), MCA, grants the City the power to formulate and coordinate
a workable program as specified in 7-15-4209, MCA; and
Section 7-15-4209, MCA, states : (1) A municipality may formulate a workable program for
utilizing appropriate private and public resources:
179
July 14, 2010 8
(a) to eliminate and prevent the development or spread of blighted areas;
(b) to encourage needed urban rehabilitation;
(c) to provide for the redevelopment of such areas; or
(d) to undertake such of the aforesaid activities or other feasible municipal activities as may be
suitably employed to achieve the objectives of such workable program.
(2) Such workable program may include, without limitation, provision for:
(b) the rehabilitation of blighted areas or portions thereof by re-planning, removing congestion,
providing parks, playgrounds, and other public improvements; by encouraging voluntary
rehabilitation; and by compelling the repair and rehabilitation of deteriorated or deteriorating
structures; and
(c) the clearance and redevelopment of blighted areas or portions thereof.
Section 7-15-4288, MCA states, “Costs that may be paid by tax increment financing” allows the
municipality to use tax increments to pay the following costs of or incurred in connection with an
urban renewal project: 1) demolition and removal of structures, 2) improvement of infrastructure,
3) public improvements and 4) costs incurred in connection with the redevelopment activities
allowed under 7-15-4233
Priority 4 Total $ 15,000
SUMMARY: FY 11 PROPOSED BUDGET
Priority 1 $ 54,100
Priority 2 $ 93,000
Priority 3 $ 17,000
Priority 4 $ 15,000
Staff time $ 5,000
Administrative Services $ 2,019
Overall Budget Total $ 186,119
180
ORDINANCE NO 1655
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF BOZEMAN
MONTANA ADOPTING AN URBAN RENEWAL PLAN FOR PORTIONS OF THE
NORTHEAST BOZEMAN INCLUDING THE HISTORIC MIXED USE DISTRICT
WHEREAS the Bozeman City Commission did on the 15th day of August 2005 adopt
Commission Resolution No 3835 declaring that blighted areas exist within the municipality and that the
rehabilitation redevelopment or a combination thereof of such area or areas is necessary and
WHEREAS the Bozeman City Commission appointed a Northeast Urban Renewal Study
Committee to prepare an urban renewal plan and
WHEREAS the Northeast Urban Renewal Study Committee has prepared a proposed Northeast
Urban Renewal District Plan and
WHEREAS the City Planning Board has found the proposed Northeast Urban Renewal District
Plan to be in conformance with the Bozeman 2020 Community Plan the adopted growth policy for the
Bozeman planning jurisdiction and
WHEREAS the Bozeman City Commission did on the 14th day of November 2005 conduct a
public hearing to consider the proposed Northeast Urban Renewal District Plan
NOW THEREFORE BE IT ORDAINED by the City Commission of the City of Bozeman
Montana
Section 1
That the Northeast Urban Renewal District Plan attached hereto as Exhibit A is hereby
adopted
Section 2
Repealer
All resolutions ordinances and sections of the Bozeman Municipal Code and parts thereof in
conflict herewith are hereby repealed
Section 3
Severability
If any provisions of this ordinance or the application thereof to any person or circumstances is
held invalid such invalidity shall not affect the other provisions ofthis ordinance which may be given effect
181
without the invalid provision or application and to this end the provisions of this ordinance are declared
to be severable
Section 4
Effective Date
This ordinance shall be in full force and effect thirty 30 days after passage on second reading
PASSED AND ADOPTED by the City Commission ofthe City of Bozeman Montana at a regular
session thereof held on the 14th day of November 20
ETRARO Mayor
ATTEST
R L SULLIVAN
City Clerk
PASSED ADOPTED AND FINALLY APPROVED by the City Commission of the City of
Bozeman Montana at a regular session thereof hel of NOV 2005
AN CETRARO Mayor
ATTEST
R IN L SULLIVAN
City Clerk
2
182
OHilN
SOZJJ
IvJUuCld
lJJ1SOICMlUlHucqJillSClqlJON
183
CITY OF BOZEMAN
NORTHEAST BOZEMAN URBAN RENEWAL PLAN
Prepared by
The Northeast Bozeman Urban Renewal Study Committee
Michael Barrett Ron Brey City of
Bozeman Staff
Peter Bronken Jim Browning
Brian Caldwell Bobbi Clem
Jack Davis J on Gerster
Terry Giovanini Todd Roitsma
Marcia Kaveney Erik Nelson
Tracy Oulman City of Bozeman Staff Robert Pavlic
Jeanne Wesley Wiese Steve Kirchhoff and
Marcia Youngman City
Commission Liaisons
Prepared for
The Bozeman City Commission
Andrew Cetraro Mayor Lee Hietala
Steve Kirchhoff Jeff Krauss
Marcia Youngman
2
184
NORTH EAST URBAN RENEWAL DISTRICT PLAN
CONTENTS
HISTORICAL CONTEXT PO 4
INTRODUCTION PG 4
MISSION VISION STATEMENT PG 5
GUIDING PRINCIPLES GOALS AND IMPLEMENTATION
ACTIONS PG 5
EXECUTING THE PLAN PG 10
FINANCE PG 14
DISTRICT MAP FIG 1
RESOLUTION 3835 APPENDIX 1
GENERAL DESCRIPTION APPENDIX 2
3
185
NORTH EAST URBAN RENEWAL DISTRICT PLAN
HISTORICAL CONTEXT
In the I880s Bozeman s economic fortunes blossomed with the anival of the
Northern Pacific Railway which established a depot at the northeast end ofthe
young city and connected it with distant markets The town s early entrepreneurs
established flour mills residences freight storage and a brewery on new streets
named for trees mostly the fruit bearing variety but Montana species as well
Perhaps these names came in deference to the timber products and fruit that
passed through but much ofthis freight and food processing activity has receded
into history
In the 120 years since this place bTew into a rail centered enterprise zone
Bozeman s economic center of gravity moved elsewhere leaving the
neighborhood short on paved streets sidewalks street lighting parks and sound
infrastructure with scattered evidence ofhygone industrial activity remaining rail
track and ties cable spools grain storage bins and upright fuel tanks
INTRODUCTION
This Urban Renewal Plan was prepared by a 13 member committee composed of
a range ofbusinesses and residents from the District and the adjacent Northeast
Neighborhood in response to the City Commission s finding ofhlight on August
15 2005 Resolution 3835 Appendix 1 The City Commission supported the
blight designation unanimously in order to create an Urban Renewal District
because it believed this would encourage infill within the city limits and that the
Tax Increment Finance TIF District created by the designation would help
fInance such infill
While acknowledging that change development is inevitable in the District and
that the creation ofan Urban Renewal District and its associated Tax Increment
Financing would encourage economic vitality in the District it should be noted
that some Northeast Neighborhood citizens and several committee members
perceived few of the problems cited in the blight report Thus considerable
efforts in the development ofthis plan were made to consider the many different
and sometimes conflicting interests of the committee members The hope is that
the end product the Northeast Urban Renewal Plan adequately balances the
needs to remedy blight and encourage economic vitality and livability while also
ensuring that future development preserves and enhances the eclectic character of
the District to the fullest extent possible
A map of the District is found in Figure 1 and a general description of the area
included in the District is contained in Appendix 2
4
186
MISSION VISION
This Plan is the city s response to remedy the conditions ofblight found in the
August 2005 report The Plan also addresses other issues important to the
District The plan s purpose is to ensure the vitality ofthe Northeast Urban
Renewal District NURD the vitality of the NURD for generations to come and
to make the NURD an area in which its citizens can take exceptional pride The
Plan envisions a mixed use neighborhood that is user friendly safe secure and
healthy While this plan envisions a District with diversity ofhousing businesses
and amenities it intends to maintain the unique ambiance and historic character of
the District
GUIDING PRINCIPLES GOALS IMPLEMENTATION
ACTIONS
The principles and implementation actions which follow provide direction for
using the Plan All nine Principles are vital to achieving the vision for the
District
The Implementation Actions are not exclusive lists Neither the Principles nor
the Implementation Actions are arranged in order of importance
1 Ensure the health safety and security of the District
Unsurfaced streets inadequate storm water drainage outdated water and sewer
utilities and inadequate street lighting negatively impact the health safety and
security of the District Improving the infrastructure ofthe area will also prepare
the Districtfor thefilture
GOAL A Outdated or insufficient infrastructure should be repaired replaced or
otherwise improved
IMPLEMENTATION ACTIONS
Improve streets and alleys
Improve fire prevention
Repair or replace defective sections of water and sewer mains
Improve the appearance and adequacy of dark sky lighting
Provide for prompt snow removal
Improve sidewalks and trail network
Increase police patrols
Improve storm water systems and develop storm water management
techniques to protect Bozeman Creek
5
187
GOAL B Encourage a land use pattern that facilitates all modes of transportation
vehicular bicycle pedestrian mass transit and commercial for safe efficient
and convenient access for residential commercial and industrial uses
IMPLEMENTATION ACTIONS
Incorporate sidewalks crosswalks bike lanes and trails in the design
for construction or reconstruction of streets and roadways
Obtain property or easements for the continuation ofthe existing
trail system
Encourage bicycle use by incorporating bicycle amenities in the
design of streets bridges and trails
Design sidewalks walkways trails and streets for handicapped
accessibility wherever possible
Provide traffic calming measures
Designate truck route
GOAL C Provide public utilities to the area efficiently in ways that are not
visually or physically obtrusive
IMPLEMENT ATJON ACTION
Encourage the conversion of communications networks and other
utilities to underground or wireless facilities
2 Balance commerce and livability in the District within the mixed use
framework
The clear intent ofthis District is to support a mix and variety o nonresidenlial
and residential uses Nothing in this Plan shall be interpreted to be discouraging
or prejudicial to any allowable uses
GOAL Harmonize commercial and industrial development with residential
quality of life
IMPLEMENTATION ACTIONS
Assure compatibility of land uses through appropriate urban design
techniques
Consider alternative materials for streets and sidewalks
Promote environmental cleanup ofbrown field or hazardous
substances by the responsible parties
Encourage commercial development that provides basic needs to
the District
Encourage affordable housing
6
188
3 Honor the unique character and vitality of the District
The unique character of this neighborhood is built on its history proximity to the
railroad mixed rural and urban development mixed residential and commercial
uses and its proximity to downtown These qualities should be supported
GOAL A New structures should be designed and built keeping in mind public
values of durability flexibility and simplicity Thoughtful consideration of
design materials and massing in the construction of new private buildings will
add strenblh and character to the built environment To the degree that the private
sector can be influenced by a public partner in development the community ought
to strongly encourage excellence in urban design as a basis ofpartnership
IMPLEMENTATION ACTIONS
Where historic buildings and places exist compatibility of design
elements should also enter into the planning ofnew construction
Where historic structures are affected by public or private
development seek out the advice and assistance of local state or
federal historic preservation professionals for opportunities to
renovate existing historic structures
Respect the property rights ofproperty owners
Encourage the growth of cultural activities
GOAL B Promote sustainable building practice and design within the District
IMPLEMENTATION ACTIONS
Support projects and designs that promote Dark Skies
Promote the use of indigenous plants and materials for landscaping
and design
Encourage the use oflocally produced renewable products
Promote environmentally sound development and construction
practices
Promote energy and resource efficient systems within the District
4 Public open space is essential to a healthy and appealing urban
environment
Developing and procuring parks and public open space as well as improving and
making accessible the existing trails such as The Depot Park Trail and Bozeman
Creek Trail will enhance and improve the District
Goal A Procure new land for parks and public open space
IMPLEMENTATION ACTIONS
Secure public open space s in Iocation s that will optimize use
and accessibility
7
189
Ensure that all park planning provides for a broad range ofboth
residential and commercial needs
Provide a park plan that includes a children s playground and
connectivity to adjacent wetlands and open space
Eminent Domain shall not be used to procure new land for parks
Goal B Improve landscaping in existing public spaces
IMPLEMENTATION ACTIONS
Enhance boulevards and public right of way by planting and
maintaining trees where appropriate
Weed control
Encourage property owners to maintain their property
5 The costs of projects and programs shall be weighed against their benefits
to the District
This principle is se fexplanatory as long as Benefit is understood to mean the
promotion of the Principles and that Benefits may not befinancial in nature
6 Private property shall not be acquired for other private use through the
eminent domain process in the implementation of any aspect of this plan
GOAL Neither the City of Bozeman nor any ofits subdivisions shall use
eminent domain to take private property for private use in the implementation of
an urban renewal project or similar redevelopment plan
IMPLEMENTATION ACTIONS
Include a specific prohibition ofthis practice in the implementation
section ofthe Plan
Require that any amendment ofthe Plan occur under the same
procedures as the Plan was adopted including the individual notice
requirements for properties within the District
Help assure the City ordinance prohibiting the practice remains in
place by placing the NURB on record as endorsing the prohibition
7 The City shall not limit its vision for the District improvements to monies
available solely through the TIF funding
GOAL Encourage the City to help ensure the success of the N E Urban Renewal
Plan by giving a high priority to the NE District in its capital improvements plan
8
190
IMPLEMENTATION ACTIONS
Work with the City County and State to secure funds from all
available sources
Promote communication so that it is understood that the District
will require assistance beyond the tax increment finance funding
8 Projects shall consider impacts on adjacent neighborhoods
OOAL Work with neighborhoods and businesses to ensure actions taken in the
District are compatible with adjacent developed areas
IMPLEMENTATION ACTIONS
Keep communication open and seek public input from adjacent
neighborhoods
Evaluate projects on their community wide benefits and impacts
Create a process for the development and prioritization of
neighborhood projects
9 The city shall consider the impact on the District of all projects
undertaken outside of the District
GOAL Work with the City to ensure actions taken outside ofthe District are
compatible with projects inside of the District
IMPLEMENTATION ACTIONS
Evaluate and mitigate adverse impacts on the District occurring
from projects outside ofthe District
Ensure that a proportionate share ofinfrastructure costs resulting
from projects inside of the District is shared by the projects outside
ofthe Districts that utilize the infrastructure
9
191
EXECUTING THE PLAN
INTRODUCTION
Once adopted this Plan becomes the official policy guide for public action
regarding the Northeast Urban Renewal District These policies can only be
transformed into action through an effective implementation probTam Thc
framework for implementation described herein depends on sound processes of
administration financing and evaluation As the implementation ofthis Plan
proceeds new opportunities will arise and unforeseen problems will emerge The
Plan s administration must be sufficiently flexible to respond cffectively to
changing circumstances without losing sight oflong range goals
ADMINISTRATION
To implement this Plan an Urban Renewal Agency will be created hereafter
referred to as the Northeast Urban Renewal Board NURB The NURB is
responsible for the implementation ofthis Plan pursuant to MCA S 7 15 4232
Specifically the NURB will 1 develop plans which implement the vision tor the
District 2 rcview on an ongoing basis the opcration and processes of all public
agencies to assure that such activities are supportive ofthe Plan and 3 advocate
and coordinate the complete and full implementation of the Plan
Individuals appointed to the NURB shall have a demonstrated interest in
Northeast Bozeman Pursuant to MeA S 7 15 4234 the mayor by and with the
advice of consent ofthe City Commission shall appoint the NURB which shall
consist of five voting members The initial voting membership shall consist of
one NURB member appointed for 1 year one for 2 years one for 3 years and two
tor 4 years Each appointment thereafter shall be tor 4 years
1 Each voting member shall hold office until hisher successor has been
appointed and has qualified
2 A voting member shall receive no compensation for his her service but
shall be entitled to authorized necessary expenses including traveling expenses
incurred in the discharge ofhis her duties
3 Any person may be appointed as voting members if they reside within
the municipality or own property within the District The preferred composition
ofthe NURB would include two residents ofthe District two business owners in
the District and one member at large
4 A voting member may be removed for inefficiency neglect of duty or
misconduct in offIce
5 The appointment ofvoting members shall be ratified annually by the
City Commission
A majority ofthe voting members shall not hold any other public oHice under the
municipality other than their membership or office with respect to the NURB
10
192
The powers and responsibilities ofthe NURB shall be exercised by the members
thereof according to adopted bylaws approved by the City Commission A
majority of the members shall constitute a quorum for the purpose of conducting
business and exercising the powers and responsibilities ofthe NURB and for all
other purposes Action may be taken by the NURB upon a vote of a majority of
the members three unless in any case the bylaws shall require a larger number
In addition to the five voting members the NURB shall be composed of a non
voting membership ofnot more than four individuals The initial membership
shall consist of one member appointed for 1 year one f r 2 years one for 3 years
and one for 4 years Each appointment thereafter shall be for 4 years These
individuals must possess expertise or other qualifications necessary to help
implement the plan
1 Each non voting member shall hold office until hisher successor has been
appointed and has qualified
2 A non voting member shall receive no compensation f r hisher services
but shall be entitlcd to authorized necessary expenses including traveling
expenses incurred in the discharge of his her duties
3 A non voting member may be removed for inefficiency neglect ofduty
or misconduct in office
4 The appointment of non voting members shall be ratified annually by the
City Commission
Initial administrative staff duties for the NURB will be performed by city staff as
available until other funding shall be available from alternate sources and
permanent staff hired The NURB will make every effort to fund its own staff
either by contracting for services with existing public agency staff contracting for
services with a private firm or hiring a staff The FY07 work program shall
specify the staff arrangement
The NURB may exercise any ofthe powers specified in MCA 7 15 4233
However no entrance to any building or property in any urban rcnewal area in
order to make surveys and appraisals in the manner specified in 7 15 4257 shall
be made without the owner s permission
ANNUAL WORK PROGRAM BUDGET AUDIT AND EV ALUATION
The NURB shall prepare an annual work program A WP and budget that will list
the activities and costs of activities for the coming fiscal year as well as the
method of financing those activities The NURB shall provide public notice in
the newspaper and by other appropriate means and conduct a public hcaring prior
to the submittal ofthe annual work program to the City Commission This
program and budget may be amended during the course ofthe city s fiscal year in
light of funding and program changes All budgets and revised budgets shall be
reviewed and approved by the City Commission
11
193
The NURB shall cause to be perf rmed an annual audit conducted in conjunction
with the city s audit covering the operations of the NURB in carrying out this
Plan The first such audit shall be completed within ninety 90 days ofthe close
of the first fiscal year following the adoption ofthis Plan by the City Commission
All such audits shall be maintained as a part of the public records of the City of
Bozeman
The NURB shall also provide to the City Commission and the public an annual
program evaluation Such evaluation shall review the Northeast Bozeman
Improvement District Plan and the past annual work program and other relevant
NURB activities for the year
PLAN AMENDMENT
The Plan may be amended by the same means as adopted in accordance with
Montana law No ordinance amending the Plan shall be adopted until after a
public hearing has been conducted thereon and notice of said hearing has been
given in the official newspaper once a week for two consecutive weeks preceding
the hearing In addition mailed notice shall be given to all persons owning
property at the time and in the manner provided by MCA 7 I5 42I5 1 All
notices shall provide the information regarding the modification required by MCA
S 7 15 4215 1 Nothing herein shall limit of affect the authority ofthe
Commission to undertake and carry out renewal activities on a yearly basis as
provided by MCA 7 15 4220
PROPERTY ACQUISITION
The NURB will assist and encourage public and private entities to eliminate
blight or blighting influences and strengthen the City s economy by developing
property in the District Where necessary in the execution of this Plan the
NURB is authorized to acquire property in the District in accordance with the
appropriate federal state and local laws However the power ofeminent domain
shall not be used to acquire private property for private purposes or for parks
ACTION BY THE CITY
The City shall aid and cooperate with the NURB in carrying out this Plan and
shall take all actions necessary to ensure the continued fulfillment of the purposes
of this Plan and to prevent the recurrence or spread in the area ofconditions
causing blight To assure the purposes ofthe Plan are fully considered the City
shall obtain and consider the advice of the NURB regarding all development
proposals public works projects or other matters occurring within or adjacent to
the Northeast Bozeman Improvement District area or affecting any aspect ofthe
Plan
12
194
Other action by the City may include but not be limited to the following
1 Institution and completion ofproceedings for opening closing vacating
widening or changing the grades of streets alleys and other public rights of way
and for other necessary modification of the streets the street layout and other
public rights of way in the Northeast Bozeman Improvement District areas
2 Institution and completion ofthe proceedings necessary for changes and
improvements in publicly owned utilities within or affecting the Northeast
Bozeman Improvement District areas
3 Revision ofMaster Plan Zoning requirements development standards and
regulatory practices if necessary to facilitate the execution or principles policies
and implementation actions set forth by this Plan
4 Pedormance ofthe above and all other functions and services relating to
public health safety and physical development normally rendered in accordance
with a schedule that will pennit the redevelopment ofthe Northeast Bozeman
Improvement District area to be commenced and carried to completion without
unnecessary delays
5 Promotion ofthe availability through the City ofprograms and funds to helpkeepexistingandnewhousinginornearthedistrictaffordableandhabitable
6 The undertaking and completing of any other proceedings necessary to carry
out the provision of this Plan
13
195
FINANCE
The programs projects and administration ofthe Plan shall be financed from a
variety of sources both public and private which in part may include
Private Grants dues self imposed taxes such as Special Improvement Districts
or Business Improvement Districts private investment and donations
Private Enterprise Assistance Programs Housing and Urban Development
Small Business Administration and Community Reinvestment Act financial
assistance
Public Tax increment financing revenue bonds City and County general funds
public grants utility Districts user fees state backed low interest loans Montana
Department ofTransportation general obligation bonds tax credits and
enterprise funds
Tax Increment Financing will be implemented in accordance with MCA SS 7 15
4282 4292 and 43014324 In the event that property taxes arc reduced or
replaced with some new form of revenue it is the intent ofthe Plan to use all
available means to adjust the tax base or allow the capture ofthat portion ofthe
new revenue form necessary to offset the reduced or lost increment
The NURB will annually develop a program and budget to be reviewed and
adopted by the City Commission During this procedure specific actions will be
proposed in detail for community review This process will allow maximum
community input to further the redevelopment interests of the community and to
evaluate past actions ofthe NURB
Tax Increment Financing shall be used to further the implementation of the goals
set forth in this plan
14
196
JJSlaIBM9U91ueqJnnH3N
SOOZpasodOJd
I
9JnB1OOlrD
l
IamtI
197
Appendix 1
COMMISSION RESOLUTION NO 3835
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
BOZEMAN MONTANA DECLARING THAT BLIGHTED AREAS EXIST
WITHIN THE MUNICIPALITY AND THE REHABILITATION
REDEVELOPMENT OR A COMBINATION THEREOF OF SUCH AREA OR
AREAS IS NECESSARY IN THE INTEREST OF THE PUBLIC HEALTH
SAFETY MORALS OR WELFARE OF THE RESIDENTS OF SUCH
MUNICIPALITY
WHEREAS a blight investigation in a portion of Northeast Bozeman outlined
in Attachment A was completed by ThinkTank Design Group Inc on June 6
2005 and
WHEREAS the investigation determined that areas of blight as defined by
state statute existed within the study area associated with the following the
defective or inadequate street layout identified within the study area instances of
known deterioration inadequate provisions and or age obsolescence of the
following public improvements within the study area water sewer storm
drainage streets sidewalks and parks instances of age obsolescence of buildings
within the study area instances of unsanitary or unsafe condition instances
producing inadequate provision for ventilation light proper sanitary facilities or
open spaces as determined by competent appraisers on the basis of an examination
of the building standards of the municipality and
WHEREAS Section 7 15 4212 MeA provides that any person public or
private may submit an urban renewal plan to the municipality and
WHEREAS a request was received from ThinkTank Design Group Inc to
create an Urban Renewal District for the study area in Northeast Bozeman outlined
in Attachment A and
16
198
WHEREAS Section 7 15 4210 MCA requires that a municipality adopt a
resolution of necessity in order to implement an urban renewal program
NOW THEREFORE BE IT RESOLVED by the City Commission of the City of
Bozeman Montana that areas of blight exist within the study area of Northeast
Bozeman outlined in Attachment A attached hereto and by this reference made a
part hereof and that the rehabilitation redevelopment or a combination thereof of
the area is necessary in the interest of the public health safety morals or welfare
of the residents of Bozeman
BE IT FURTHER RESOLVED that the City shall not use its powers of eminent
domain to acquire private property for any private use in the implementation of any
urban renewal project within this area
PASSED AND ADOPTED by the City Commission of the City of Bozeman
Montana at a regular session thereof held on the 15th day of August 2005
ANDREW L CETRARO Mayor
ATTEST
ROBIN L SULLIVAN
City Clerk
APPROVED AS TO FORM
PAUL J LUWE
City Attorney
17
199
Appendix 2
Description of the Proposed NE Urban Renewal District
Beginning at the point of the southeast corner of Lot 12 Block 15 of the Imes
Addition thence southerly along the west right of way line of North Rouse
Avenue approximately 1 530 feet to the northeast corner of the north 81 feet of
Tract 1 Block 9 of Beall s First Addition thence easterly approximately 60 feet to
the western property line of Tract 2 Block 1 of Perkins and Stone Addition
thence northerly along the east right of way line of North Rouse Avenue
approximately 32 feet to the northwest corner of Tract 2 Block 1 of Perkins and
Stone Addition thence easterly along the south right of way line of East Peach
Street approximately 397 feet to the northwest corner of Tract 2 Block 6 of the
Babcock and Davis Addition thence southerly along the east right of way line of
North Church Avenue approximately 117 feet to the southwest corner of Tract 2
Block 6 of the Babcock and Davis Addition thence easterly approximately 194
feet to the southeast corner of Tract 2 Block 6 of the Babcock and Davis
Addition thence southerly approximately 55 feet to the southeast corner of Tract
3 Block 6 of the Babcock and Davis Addition thence westerly approximately 10
feet to the northeast corner of Tract 4 Block 6 of the Babcock and Davis Addition
thence southerly approximately 111 feet to the southeast corner of Tract 7 Block
6 of the Babcock and Davis Addition thence easterly approximately 264 feet to
the western property line of the West of Lot 3 Block 7 Tract 2 of the Babcock
and Davis Addition thence northerly along the eastern right of way line of North
Wallace Avenue approximately 284 feet to the northwest corner of the west end
of Tract 2 Lot 6 and the north 5 feet of Lot 5 Block 7 of the Babcock and Davis
Addition thence easterly along the southern right of way line approximately 817
feet to the western property line of Lot 33 Block 53 of the Northern Pacific
Addition thence northeasterly along the eastern right of way line of Plum Avenue
approximately 555 feet to the centerline of the current main railroad track thence
northwesterly along the centerline of the current main railroad track
approximately 1 280 feet thence westerly approximately 177 feet to the
northeast corner of Lot 1 of the Amended Plat C 23 W of the Northern Pacific
Addition thence southerly along the west right of way line of North Wallace
Avenue approximately 393 feet to the southeast corner of Lot 17 Block 110 of the
Northern Pacific Addition thence westerly along the north right of way line of
East Tamarack Street approximately 400 feet to the southwest corner of Lot 1 of
the Amended Plat C 23 W of the Northern Pacific Addition thence northerly
along the east right of way line of North Church Avenue approximately 360 feet
to the property line of Lot 1 of the Amended Plat C 23 W of the Northern Pacific
Addition thence westerly approximately 430 feet along the north right of way line
of East Juniper Street to the southeast corner of Lot 12 Block 15 of the Imes
Addition the point of beginning
18
200