Loading...
HomeMy WebLinkAboutanti-discrimination compliance Evaluation Criteria QUALIFICATIONS EVALUATION CRITERIA Respondents to requests for proposals shall be evaluated on the following criteria and the requirements of 18-8-201 et seq. MCA with the selection committee choosing, in its opinion, the most qualified firm to provide the services required for the proposed project. ~33% -- The qualifications of professional personnel to be assigned to the project. ~16% -- Related experience on similar projects; ~16% -- Capability to meet project time and budget requirements; ~ 8% -- Location of firm in relation to project; ~10% -- Present and projected workloads; and ~16% -- Recent and current work for the City of Bozeman. The selection of finalists to be interviewed will be made by a selection committee representing the City of Bozeman. The selection will be based on an evaluation of the written responses to the request for proposals. Award will be made following contract negotiations to the most qualified offer or at a price which the City determines to be fair and reasonable taking into account the estimated value of services to be rendered, as well as the scope, complexity and professional nature thereof. If the City is unable to negotiate a satisfactory contract with the firm initially selected at a price the agency deems to be fair and reasonable, negotiations with that firm will be formally terminated and the agency shall select another firm, in accordance with 18-8-204 MCA, and continue until an agreement is reached or the process is terminated. All proposals must be submitted complete and contain the information required as stated in the "Request for Qualifications." PROCUREMENT BOZEMAN SWIM CENTER MAIN PUMP AND LIGHTING PROJECT Total Score________________ Date ______________________ FIRM NAME: ______________________________________________________ I. PERSONNEL QUALIFICATIONS (40 points maximum) A. Main pump Design Experience (10) ____________ B. Lighting Design Experience (10) ____________ C. Electrical/mechanical team in place with Minimum of three projects together (10) ____________ D. Variable Frequency Drive Design Experience (10) ____________ I. TOTAL ________________ II. RELATED EXPERIENCE ON SIMILAR PROJECTS (20 points maximum) A. Previous work on Aquatic Facilities (20) ____________ II. TOTAL ________________ III. SCHEDULE & BUDGET (15 points maximum) A. Scheduled time allotments appear appropriate to identified tasks (5) _____________ B. Manpower projections (if any) appear appropriate for project (10) _____________ III. TOTAL _____________ IV. LOCATION OF FIRM (10 points maximum) A. Knowledge of Area (5) __________ B. Familiarity with State Regulations (5) __________ IV. TOTAL _____________ V. PRESENT & PROJECTED WORKLOADS (15 points maximum) A. Able to begin data collection and review within two weeks of notice to proceed. (5) _____________ B. Available staff to meet manpower projections/requirements (10) ____________ V. TOTAL ______________ VI. WORK EXPERIENCE (20 Points maximum) A. Recent work with City of Bozeman (1 pt. for each year since employment with the City. Current employment = 0 pts.) (5) _____________ B. Previous work demonstrates good attention to detail (15) _____________ VI. TOTAL ________________ FIRM TOTAL SCORE (TOTAL I - VI) = _________________ Remarks: Reviewer's Name __________________________________________________ Date _____________________________________________________________