Loading...
HomeMy WebLinkAboutChange Order 08, City Shops/HRDC Bus BarndnwUog JOINT 0 NER CHANGE ORDER Project: To Contractor: City Barn 1821 N. Rouse Ave Bozeman, MT 59715 BN Builders, Inc 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 The Contract 15 changed as foliows: Increase Contract Sum. yandhobn architects Total Contract Sum Adjustme t: The origriaI Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contracl Sum will be increased by this Charige Order by the amount of The new Contract Surn including this Change Order will be City of Bozeman Contract Sum Adjustment: The original Contract Sum was The riet change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will bo increased by this Change Order by the amount of (50% of Total Change Order) Tlie new Contract Sum including this Change Order will be C.O. #08 Date: May 12.2O1O Owner Architect Architect's Project No: 08-26 Contractor Field Contract Date: November 4.2OU0 Other Contract For: General Construction Reason for change: Revised foundation sub-grade preparation due to discovery of poor soils, per CCD #1 (CP #03) Replacement fill at clarifiers due to wet conditions at city stockpile, per CCD #1 (CP #04) No cost change to contract date due to weather days and asbestos removal (CP #18) Additional conduit needed for data lines for two separate service providers (CP #21) Aftaohmnent(s): CP# 03 CP# 04 CP# 18 CP# 21 1,90.60000 34,950.47 1.042`55047 9,794.53 1'852,345 00 1,049,231.41 Q 17,744.65 1.086.97608 4,897.27 1.071.873.32 HRDC Contrac Sum Adjustment: The original Contract Sum was 858.368.59 The net change by previously authorized Change Orders 17.205.82 The Contract Sum prior to this Change Order was 875,574.41 The Contract Sum wiH be jncreased by this Change Order by the amount of 4.897.26 (50% of Total Change Order) The new Contract Sum including this Change Order will be 880,471.87 Contract Time Adjustment: The Contract Time wUJ be increased by zero (18) days. The date of Substantial Completion as of the date of this Change Order therefore is: August 15, 2010