HomeMy WebLinkAboutChange Order 07, City Shops/HRDC Bus BarnCITY OF BOZEMAN CHANGE ORDER
Project:
CP# 14
CP #15
Signatures:
City Shops/ HROC Bus Barn
1821 N. Rouse Ave
Bozeman, WlTSA715
To Contractor BN Builders, Inc
2088 Stadium Oc. Ste 1O2
Bozeman, MT 59715
The Contract is changed as follows:
Increase Contract Sum.
Architect: Dowling Sandholm Architects By:
15 Wes 14` Street Suite 103
Helena, Mt 59601
Contractor: BN Builders, Inc By:
2066 Stadium Dc Ste 1O2
Bozeman, MT 59715
Owner: City of Bozeman By
p,O. Box 123O
Bozeman, MT 59771
Date: April 26, 2010
Architect's Project No: 08-265
Contract Date: November 4.2OQ8
Contract For: General Constructjori
Reason for change:
Owner requested change to increase height of counter at parts office (CP #14)
Owner request for window at Shop Office (CP#15)
Contract
The original Contrac Sum was
The net change by previously authorized Change Order
The Contract Sum prior to this Change Order was
The Coritract Sum will be increased by this Change Order by the amount of
The new Contract Sum including this Charige Order will be
Contract TmeAdivabnent
The Contrac Time will be increased by zero (0) days
The date of Substantial Completion as of the date of this Change Order therefore is July 28, 2010
Not valid until signed by Architect, Contractor, and Owner.
is Kukulsk
C.O. #07
Owner
Architect
Contractor
Field
Other
Date:
Date:
O
1.049.231.41
16,648.85
1.065.878,28
1,097.80
1 066,976.06
BNbu friers, Inc.
Wednesday, March 31, 2010
Mike Wiseman
Dowling Sandholm Architects
55 West 14tn Street
Helena, MT 59601
RE: Change Proposal CP# 14
Bozeman City us Barn 509012
Dear Mike Wiseman,
This letter is to request authorization to proceed with the following extra work:
CP Number: 14
Description: Cabinet Height Change
Proposed Amt: 550.00
aiy:, Requested: 0 days
Scope of Work (see attached for detailed cost summary):
Provide 'nor, equipment materials to change cabinet height from 36" to 42".
Please sign below and return a copy p this lcrier to indicate vcur accentarce of this extra work and approve the
price for this work. AcMitiona costs may apply autrcrization rcceived after
BNBuliders has proceedea with this work per prevou:-.. RCM approval (attached) This change pr000sai represents
the flna price for this work
BNBuilders has proceeded witn this W011( based on owner approval via email (see attached) cr vernal cnectIon„
Irks change proposal represents the final price for this work,
Submitted by:
if\si\PLIA-
ott Jay
BNBuilders, Inc
D
Accepted by: Date:
ke Wiseman
Dowling Sandhohn Architects
Vto
BN Builders, inc.
BNBuilders, Inc.
BNBui!ders, Inc.
Project 509012
Bozeman City Bus Barn
1812 N. Rouse Avenue
Bozeman, MT 59715
Prone: O6582742
Fax: 406-582-7436
CHANGE PROPOSAL DETAIL BACKUP
CP 14
ConrJactor
Description
Casework
Amount
$500.00
Overhead Profit
OH Proffte Subcontractors
$0.00
$50.00
Total: $550.00
Scott Ja
Fr- Irv. Scott Jay
tient: Wednesday, March '17, 2010 2:43 PM
To: Scott Jay
Su,„;, at: FW; Cab met Questions
From Constance Wagner <constance@magnercabinetry.com>
To: Jenae Benner
ht: Thu Feb 11 10:29:12 2010
1)ject, RE: Cabinet Questions
Dear Jenae,
1 read you email to Mike. 4 fw as changing the counre heicth 35" to 40" or 42' she said it would be custom and
the depth of the cabinets be decreased.
We can do the cabinets the same 24" depth for th
They won't need to be decreased in depth after ail,
We wifi build tne boxes to the same spec and use the same mater als as Merillat and we will get the cabinetry door and
drawer fronts from them.
This drawer and glides will also come from them.
Cal if you have any questions!
Constance
F Constance Wagner
Sent: Thursbay, February 11, 2010 11:25 AM
'Jenae Benner'
S..n3ect: RE: Cabinet Questions
$500.00.
He Jenae,
We can do the cabinets at 40.5 tall (with Countertop that wil be 42" finished heignt) tor $500,00 more.
Let us know if you would like that change.
Best to you,
Constance
BN Builders, Inc.
Wednesday, April 7, 2010
Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
RE: Change Proposal CP# 15
Bozeman Cty Bus Barn 509012
Dear Mike Wiseman,
This letter is to request authorization to proceed with the following extra work:
CP Number: 15
Description: ASI #06 Additional Window
Proposed Amt: 547.80
Days Reauested: 0 days
Scope of Work (see attached for detailed cost summary):
Provide labor, equipment, and material for (1) additional window "B" in WI! Office #121 for complete
installation as per details provided in ASI #06.
0 Please sign below and return a copy of tnis letter to indicate your acceptance of this extra work and approve the
price for this work. Additional costs may am* if authorization is received after
BNIBuilders has proceeded with this work per previous ROM approval (attadied). This change proposal represents
the final price for this work,
BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction.
This change proposal represents the final price for tnis work.
Submitted by:
ott Jay
Tiri Builders, Inc
Accepted by: Date:
q/Vc)
ke Wiseman
Dowling Sandholm Architects
BNBuilders, Inc.
�4tar t:ra
BNBuilders, Inc.
BNBuilders, Inc.
Project 509012
Bozeman City Bus Barn
1812 N. Rouse Avenue
Bozeman, MT 59715
Phone 406. 582 7412
Fax 906 582 -7436
C ANGE PROPOSAL DETAIL BACKUP
Description
Glazing
Overhead Profit
OH Profit Subcontractors
Tota!
Arnount
$498.00
$0.00
$49.80
$547.80
ez'aep Benner
Czr:pwries; Follow Up
Tot& cost for Window B is as follows.
Passthru window (Window B) erial cos $289
$289 x 10% markup $318
Labor to install =4hox$45/hr=$18O
Total cost: $3I8+$180 =5498
Let me know if you need anything ese on this window.
Also, will you be sending out a new work schedule? I'm wondering when we need to be ready with the glass.
Regards,
Loren
From: knae Benner [naibmjenoe.bemner@bnbui|der .com]
5emt
Monday, April O5,201O4:23PM
To: Andy Glass
Loren,
1 aiso need labor for the additional window install.
Thanks,
Jenae Benner
F-mrr: Andy's Glass hmmDto:info@ .net
Sent: Monday, April 05, 2010 3:05 PM
]cnaaMemner
|enae,
Amoy'u Glass [info@a laaa.net]
Tuesday April 06 2010 10.02AK8
Jenae Benner
RE: CP#15
/maga0O1jpg
That is absolutely correct. I should have caught it when I typed up the change order for Window C. Anyhow, we can
disregard the Window C change order and, instead, add on the additional cost for the Window B pass thru window.
Pass-thru window (Window B) material cost $289
1
Total cost: $289 x 1O% markup $318
Will that work for a change order or do you want me to type up a separate form and fax it to you?
Loren Buettner
166 Briar Place
Beigrade, MT 59714
Phone 406-388 1487
Fax 406-388-2566
Wen: ndsIa5
Email: info@andvsglass,net
From Jenae Benner [mailto:jenae.benner@bnbuilders.com]
Sent: Friday, April 02, 2010 9:51 AM
Andy's Glass
sot FW: CP 15
Loren,
Please see the comment below from the Architect, Can you please email with a response.
Can you provide a cost for the change from the Gerkin window at window B to the pass thru window? I would have
thought that the pass thru would be cheaper than the Gerkin, and that is essentially what the change proposal should be,
since the original Gerkin for B moved to C It may not end up being cheaper, but 1 wanted to track the cost change
appropriately."
Thanks,
Jel oe Benner
Information from ESET N0D32 Antivirus. version of virus signature database 4995 (20100402)
The message was checked h ESET N0D32 Antivirus.
httn://www,eset.com
Information from ESET N0D32 Antivirus, version of virus signature database 5002 (20100405)
The message was checked by ESET N0D32 Antivirus,
COMMISSION RESOLUTION NO. 4257
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION /MODIFICATION OF CONTRACT
WITH BN BUILDERS, BOZEMAN, MONTANA.
WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid
for the Construction of the Vehicle Maintenance Building and HRDC Bus Bari? to BN Builders, Bozeman,
Montana; and
WHEREAS, Section 7 -5 -4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and /or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and /or alterations to the contract between the City of Bozeman, a
municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #7, attached
hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to
execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed
to attest such signature.
1 of 2
Resoluiroo Ao 425 Change order
PASSED AND ADOPTED by the City Commission of the City of Bozeman. Montana, at a regular
session thereof held on the 24th day of May, 2010.
ATTE''SZT.!.
4
s R.
City
APPROVED AS TO FORM:
G
Cit
Page 2 of 2
SULLIVAN
ttomey