HomeMy WebLinkAboutChange Order 09, City Shops/HRDC Bus BarnProject:
To Contractor:
The Contract is changed as foliows:
Increase Contract Sum.
Attachment(s):
CP# 20
CP# 23
dowling
JOINT OWNER CHANGE ORDER
City Shops HRDC Bus Barn
1821 N. Rouse Ave
Bozeman, MT 59715
BN Builders, Inc
2066 Stadium Dr., Ste 102
Bozeman, MT 59715
sandholm architects
Total Coritract Sum Adjustment:
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Surn prior to this Change Order was
The Contract Sum will be increased by this Change Order by the amount of
The new Contract Sum including this Change Order will be
City of Bozeman Contrac Sum Adjustment:
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this Change Order by the amount of
(5OY4of Total Change Order)
The new Contract Sum incIuding this Change Orderwill be
C.O. #09
Date: May 26, 2010 Owner 11111
Architect
Architect's Projec No: 08-266 Contractor
Field O
Contract Date: November 4, 2009 Other
Contract For: General Construction
11111„
Reason for change:
Change in fault current rating for electrical panel. During bidding, the MEP consultant identified some
omissions in their drawings and could not issue an addendum in time to revise the bid amount. An estimate for
this work was given to the owner with items identified as "Pre-Construction Change Orders." This item falls
under that scope and is within the budgeted amount. (CP #20)
Heat tape boxes for drain lines were originally shown penetrating the roofing membrane. At the direction of the
architect and mechanical subcontractor, the boxes were moved to parapet walls to avoid any roof
penetrations. This resulted in an increase of heat tape wire to reach the drains. (CP #23)
1.807.600.00
44.745.00
1.952345.00
2,738.21
1.955.08321
1,049.281,41
22,64 .91
1.071,873.32
1,369.10
HRDC Contract Sum Adjustment:
The original Contrac Sum was 858.368.59
The net change by previously authorized Change Orders 22.103.08
The Contract Sum prior to this Change Order was 880.471.67
The Contract Sum will be increased by this Change Order by the amount of 1.369.11
(5Q%of Total Change Order)
The new Contract Sum including this Change Orderwill be 881.840.77
Contract Time Adjustment:
The Contrac Time will be increased by zero (])days.
The date of Substantial Completion as of the date of this Change Order therefore is: August 15, 2010
JOINT OWNER CHANGE ORDER
Not valid until signed by Architect, Contractor, and Owners.
Signatures:
Architect: Dowling Sandholm Architects By: vt, Date:
15 West 14 Street Suite 103
Helena, Mt 59601
Place Architecture
118 E. Main St
Bozeman, MT, 59715
Contractor: BN Builders, Inc
2066 Stadium Dr., Ste 102
Bozeman, MT 59715
Owner: City of Bozeman
P.O. Box 1230
Bozeman, MT 59771
Human Resource
Development Council
32 South Tracy
Bozeman, MT 59715
By:
By:
Mike Wiseman
Sash Kazeminejad
Chris Kukulski
Lee HazeV.ker
Page 2 of 2
File 21f
CO-1709 Joint.doc
Date:
C.O. #09
Date:
Date:
Date:
BNBuilders, Inc.
Wednesday, April 28, 2010
Mike Wiseman
Dowling Sardholm Architects
55 West 14th Street
Helena, MT 59601
RE: Change Proposal CP# 20
Bozeman City Bus Barn 509012
Dear Mike Wiseman,
This letter is to request authorization to proceed with the foliowing extra work:
CP Number: 20
Description: Electrical Panel Fault Curren
Proposed Amt: 1,474.56
Days Requested: 0 days
'rig Adjusted (AST #1)
Scope of Work (see attached for detailed cost summary):
Provide labor, material, and equipment for complete installation of electrical panel as described in ASI #1,
item #6.
Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
price for this wort. Additional costs may apply if authorization is received after
BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal repr eseril
the final price for this work.
o BNBuiPders has proceeded with this work based on owner approval via email (see attached) or verbal direction.
This change proposal represents the final price for this work.
Submitted by: Accepted by: Date:
r")
Mike Wiseman
r, Inc Dowling Sandholm Architect
CHA
GE ROPOSAL DETAIL BACKUP
Contractor
Description
Ee ctri
Amount
$1,340.51
BNBuilders, Inc.
BNBuilders, Inc.
Project 509012
Bozeman City Bus Barn
1812 N. Rouse Avenue
Bozeman, MT 59715
Phone: 106-582-7412
Fax: 406-582-7436
Overhead Be Profit
OH Profite Subcontractors
$0,00
$134.05
Total: $1,474.56
Phone
Fax
E-mail
406
406-388-2186
rick@galiatinele tri ervice.com
Gallatin Electric, Inc
101 Bartz Lane
Belgrade, MT 59714
Name Address
BN Builders Inc.
293 Rodeo Drive #2
Florence MT 59833
escription
ncrease MDP AIC Rating to 65K per AST #1
hange MDP from 22K to 65K
Signature
Qty
Ship To
HRDC CITY SHOP/BUS BARN
181.2 N Rouse Ave
Brian Cell 406-396-0664
Office 582-7412
Gallatin Electric CO#
BNB CO #1
C
1,165.66
Total
Client CO
Date
4/13/2010
Tracking
2488C,Order
Markup
15.00%
Project
ASI #1
Total
1,340,51
$1,340,51
BNBuilders, Inc.
Monday, May 10, 2010
Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
RE; Change Proposal CP* 23
Bozeman City Bus Barn 509012
Dear Mike Wiseman,
This letter is to request authorization to proceed with the following extra work:
CP Number: 23
Description: Electrical Boxes for Heat Tape RFI #17
Proposed Amt: 1,263.65
Days R. 4 uested: 0 days
Scope of Work (see attached for detailed cost summary):
Provide equipment, labor, and materials for complete installation to move the electrical boxes for the heat
tape and the compents laid out in RFI #17.
O BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents
the final price for this work.
O BNBuilders has proceeded with this wark based on owner approval via email (see attached) or verbal direction.
This change proposal represents the final price for this work.
Submitted by: Accepted by: Date:
ae u�n
ikleis„
Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
price for this work, Additional costs may apply if authorization is received after.
Mike Wiseman
Dowling Sandholm Architects
Contractor
Description
Amount
Electrical
$998.77
F ashing an. Seant
.150.00
13 Bn ders,
BNBuilders, Inc.
BNBuilders, Inc.
Project 509012
Bozeman City Bus Barn
1812 N. Reuse Avenue
Bozeman, MT 59715
Phone; 406-582-7412
Fax: 406-582-7436
CHANGE PROPOSAL DETAIL BACKUP
Overhead Profit
OH Profite Subcontractors
CP 23
$0.00
$114.88
Total: $1,263.65
Phone
Fax
E-mail
406-388-2126
406-388-2186
rick@gallatinelectricservic com
Date
Tracking
4/29/2010
2501C Order
Gallatin Electric, Inc
101 Bartz Lane
Belgrade, MT 59714
Name Address
BN Builders Inc.
293 Rodeo Drive #2
Florence MT 59833
Signature
11 ,1 A
*IOW IV IP IV
0
Ship To
HRDC CITY SHOP/BUS BARN
1812N Rouse Ave
Brian Cell 406-396-0664
Office 582-7412
Gallatin Electric CO#
Client CO
Project
BNB CO #3
RH #17 CO#3
Description
Qty
Cost
Markup
Total
RF1# 7
revised 5/6/2010
Re-locate HT tape 1-Box on roof
H612 Heat Tape
150
556.50
15,00%
639.98
Box 50 Roof Clips 11914
1
44.55
15.00%
51.23
THQB1120 Breaker
1
14.26
1 5.00%
16.40
1-1921 GFEP Protection
1
111.56
15.00%
128.29
Wire #12 TI1HN CU Wire
150
15.00
1500%
17.25
Rick Labor Commercial
3
126.63
15,00%
145 62
Total $998.77
Gallatin Electric, Inc
101 Bartz Lane
Belgrade, MT 59714
Name Address
BN Builders Inc.
293 Rodeo Drive #2
Florence MT 59833
Signature
11 ,1 A
*IOW IV IP IV
0
Ship To
HRDC CITY SHOP/BUS BARN
1812N Rouse Ave
Brian Cell 406-396-0664
Office 582-7412
Jenae Benner
From:
Sent:
To:
Co:
Subject:
Categories: To Do
Greg PachI
McLees, Inc.
Thursday, April 29, 2010 :09 AM
Brian Nostrant
Jenae Benner
RE: RF|#17'RESPONSE
Brian,
To furnish and install a 24 ga galvanized drip metal (and seal the flashing into the membrane
roof system wall flashing)over the junction box would be an add of $150 total ($75 per
junction box each x 2). We still would have to work around a penetration whether it is on
the wall or on the roof deck (so we are not eliminating a penetration for us to work and seal
around). Please contact me with questions/clarifications/etc. Thank You.
On Thu 22/84/10 3:06 PM "Brian Nostrant" brian^nostrantPbmbuiIders,com sent:
Greg,
Z see your concern for the location on the box being on the sidewall
rather than the roof deck. The architect is concerned about mass snow
ice slides wiping out anything sticking up through the roof. He has
reconfigured (Z think, drawings forthcoming) the HVAC penetrations as well.
The thinking is that the new location will present the lesser of two evils.
We would like for McLees to provide pricing for the flashing and caulk
lap sealant to seal the box at the wall.
Thanks,
Brian Nostrant
BNBuilders, Inc
406.398.0664 cell
v
408'582.7436 fax
www.bnbuiIders^com
-----Original Message-----
From: Jenae Benner
Sent: Thursday, April 22, 2010 1;18 PM
To: Brian Nostrant
Subject: FW: RFI #17 RESPONSE
Did you respond to these guys yet..-,
Jenae Benner
Original Message-----
From: mcleesincWowestmffice-net [mcI
eesinc@qwestoffice.net]
Sent: Tuesday, April 20 2010 10:50 AN
To: Jenae Benner
Subject: Re: RFI #17 RESPONSE
x
Who is to supply the drip edge flashing over the top of the junction boxes?
This detail (from a roofing and
weather tight perspective) should be that the conduit comes straight
up through the roof with an O" clearance that can be properly booted
or field flashed into the membrane roof system.
When a box is placed on the wall,
per the detail, caulk is the only thing being relied upon for
weatherproofing, and that's not necessarily a good thing over the long
term,
Greg Pachl
McLees, Inc.
Information from ESET NOD32 Antivirus, version of virus
signature database 505I (20100422)
The message was checked by ESET N0032 Antivirus-
bttp://mww.eset
Builders, Inc.
ozeman City Bus Barn
1812 N. Rouse Avenue
Bozeman, MT 59715
Date:
Submitted To: Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
Tel: 406-556-0113
Subject: Roof Drams
Discipline: Architectural
Document Reference: E2.2/A2.5
Subcontractor:
Question
Answer
ee a ached drawing, AS #1 1, for the response
Answered by:
March 05, 2010
Copies To: Company Contact
Request for Inform tion
RFI No: 17
BNB Project 509012
Submitted By: Jenae Benner
BNBuilders, Inc
293 Rodeo Drive
Florence, MT 59833
Tel: 406-375-6920 Fax: 406-375-6921
Per discussions between Sash (Place) and Brian (BNB), it was discussed to move the electrical boxes for the heat tape on the
middle office portion of the building. Please indicate where electrical boxes are to be moved.
this question. Thanks
Digitally signed by Sash Kazemlnelad
cn.Sash Hazemnejad, o- Architecture,
PLLC, ou, email—sashkplaarch.com, c =US
Date: 2010.04.19 145544 -0600'
Fax
Spec Section:
Subcontractor RFI No:
Date Required: 3/1212010
Data Answered:
Notes
Page 1 of 1
L'D
/7
PROJECT NAME: CITY SHOPS HRDC BUS BARN FACILITY
PROJECT NUMBER: 08-265
SCALE: 3"
SHEET DATE: 04/19/10
SHEET NAME: HEAT TAPE OUTLET
LOCATIONS
tinging
WARNING' IF MARKS DO NOT MEASURE 3. FROM END TO END AI1D 1' DI BETWEEN. THEN
DRAWING IS NOT 10 SCALE. 00 NOT SCALE DRAWINGS. USE ONLY PROVIDED DIMENSIONS
10"
I1 12"
sandholm
architect
2042 SiadItula Dr Ruirc 2 Bon. man, MT 5973 5
406 556-0113 .406 556-0114 (r ronvw dowlivaundhulm,wm
PROVIDE FLASHING w/ DRIP
EDGE OVER JUNCTION BOX,
MATCH PARAPET FLASHING
SEAM SEAL FOR WATERPROOF FIT
CONDUIT
HEAT TAPE WIRING(S)
PLACE
ARCVIITECIURE
405 58 6 00 SI
PLACEARCH.COM
118 EAST MAIN ST
BOZEMAN, MT 597E5
CLARITY
FOR CONDITIONS SHOWN
BUT NOT NOTED, SEE
_T.O.P 2
115 On
WEATHERPROOF JUNCTION BOX. PROVIDE
SIZING FOR 4 WIRES ON ONE SIDE OF BUILDING
AND TWO WIRES ON THE OTHER SIDE OF BUILDING.
SEE ROOF AND ELECTRICAL PLAN FOR DRAIN AND
HEAT TAPE REQUIREMENTS. LOCATE ON BOTH
PARAPETS ALONG THE CENTERLINE OFTHE ROOF
AND OVERFLOW DRAINS,
SHEET NUMBER
AS111
COMMISSION RESOLUTION NO. 4260
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
BOZEMAN, MONTANA, APPROVING ALTERATION /MODIFICATION OF
CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA.
WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the
bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders,
Bozeman, Montana; and
WHEREAS, Section 7 -5 -4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and/or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and /or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and /or alterations to the contract between the City of Bozeman,
a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #8, attached
hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to
execute the contract change order for and on behalf of the City; and the City Clerk is authorized and
directed to attest such signature.
1 of 2
Rcsolunon \o 4260 Change' orde r
PASSED AND ADOPTED by the City Commission of the City of Bozeman. Montana, at a
regular session thereof held on the 21st day of June, 2010.
ATTE& :13 o..,
City
C
Page 2 of 2
APPROVED AS TO FORM:
GREG SULLIVAN
Ci't Attorney