HomeMy WebLinkAboutApprove Resolution No_ 4260 authorizing the C65432_10 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: James Goehrung, Director of Facility Services Chuck Winn, Assistant City Manager SUBJECT: Approve Resolution 4260 authorizing the City Manager to sign Change Order #9 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn to add additional current rating to the electrical service, (CP#20), and add additional heat tape boxes for drain lines, (CP#23). MEETING DATE: June 21, 2010 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4260 authorizing the City Manger to sign Change Order #9 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn to add additional current rating to the electrical service, (CP#20), and add additional heat tape boxes for drain lines, (CP#23), for a total of $1,369.10 for the city. BACKGROUND: Prior to the award of bid for the Vehicle Maintenance Shop and HRDC Bus Barn, there were some items identified by the mechanical, electrical and plumbing consultants that needed to be modified but it was too late to address through the addendum process. A line item was added to the budget in the amount of $15,650.00 to cover the cost of the identified Pre-construction Change Orders. To date the items charged against this portion of the budget include: Fire alarm design, $1,994.50; Welding vent hood, $5,000.00 to Pre-construction COs ($5,000 budgeted, overage applied to Contingency- $2,560.23); Hose bibs, $913.00; and a Utility separation for the water and sewer line, $522.50. The two items in Change Order #9 are electrical related. The addition of the fault current rating for the electrical panel is to address some code related electrical requirements. The relocation of the electrical outlet boxes that will feed the heat tape for the roof drains are to be moved to avoid any roof penetrations and potential leaks in the future. The relocation of the boxes also increases the length of the heat tape wire needed to reach the drains. 128 UNRESOLVED ISSUES: No others related to this proposed Change Order. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: The two items on this change order were identified by the project consultants during the bidding process. The bidding schedule did not allow enough time to include these items in a formal addendum. Instead a budget category identified as Pre- Construction Change Orders was added to the project budget as a placeholder for these mechanical, electrical and plumbing items. The electrical panel modifications and the heat tape relocation will be charged against the Pre- Construction Change Order budget. The balance remaining for this budget category after the cost for Change Order #9 is $5,850.90. Pre-Construction Change Orders $15,650.00 CO #4 Fire Alarm Design ($1,994.50) CO#4 Welding Vent Hood ($5,000.00) CO#5 Hose Bibs ($913.00) CO#5 Utility Separation ($522.50) CO#9 Electrical Panel and Heat Tape ($1,369.10) TOTAL Pre–Const CO Balance Remaining $5,850.90 Project Contingency $128,501.70 Change Order #1 HRDC $0 Change Order #2 Asbestos Remediation ($3,294.32) Asbestos Disposal ($1,545.50) ($4,839.82) Chance Order #3 Added Site Work ($2,362.30) Change Order #4 Costs above estimate for Welding Hood (revised) Included in the Pre-Const COs ($2,560.23) Change Order #5 Hose Bibs and Utility Separation costs addressed in Pre-Construction Change Order budget $0 Change Order #6 HRDC $0 129 Change Order #7 Modify the height of the parts counter and install a sliding glass window between the two work areas. ($1,097.80) Change Order #8 Revise foundation sub-grade preparation due to discover of unstable soils; Replace fill material in clarifiers; Add a second conduit run for phone and data. ($4,897.26) Change Order #9 Electrical panel and heat tape Addressed in the Pre-Construction Change Order budget $0 Contingency Balance Remaining $112,744.29 Attachments: Change Order Form #9 Change Order Resolution # 4260 Report compiled on: June 8, 2010 130 1 of 2 COMMISSION RESOLUTION NO. 4260 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #8, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 131 Resolution No. 4260 Change order #9 Page 2 of 2 PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 21st day of June, 2010. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: __________________________________________ GREG SULLIVAN City Attorney 132 133 134 135 136 137 138 139 140 141 142 143 144