Loading...
HomeMy WebLinkAboutSouth 11th Ave and Kagy Blvd Intersection Signal Improvements Site Demolition Material Group Length Area Remarks Totals Sawcut Concrete 68 Includes sidewalk and curb and gutter Sawcut Asphalt 918 916 Demo Curb and Gutter 573 579 Demo Asphalt 4138 4011 Demo Concrete 875 928 Includes existing ramps too Notes: Areas are from AutoCAD. New Site Work Material Group Length Base Width Area Depth Volume Weight Remarks lf lf sf ft cy tons Totals Excavation 7940.0 2.25 661.7 Includes area under Curb (4-width) and Asphalt Subbase 7940.0 1.25 367.6 Includes area under Curb (4-width) and Asphalt Crushed Top Surf 7940.0 0.5 147.0 Includes area under Curb (4-width) and Asphalt Curb and Gutter 827 4 3308.0 N/A N/A Area for base calculations only Asphalt 4632.0 0.33 56.6 110.8 assumes 145 lb/cf Concrete Base Gravel 1589.0 0.25 14.7 Includes Ramps and Sidewalks Concrete Ramp Landing 1447.0 0.5 26.8 6" Concrete Concrete Sidewalk 142.0 0.33 1.7 4" Concrete Notes: Areas are from AutoCAD where no length and width are shown. Areas of subbase and CTS are equal. (Based on slope of existing base materials under inside edge of demo equaling slope on new outside edge)