Loading...
HomeMy WebLinkAboutResolution No. 4258, Change Order 8 for Lower Yard Vehicle Maintenance - HRDC Bus Barn.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: James Goehrung, Director of Facility Services Chuck Winn, Assistant City Manager SUBJECT: Approval of Change Order #8 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn to revise the foundation sub-grade preparation, (CP#03); Replace the fill in the old clarifiers due to wet conditions, (CP#04); Add additional conduit under the slab for phone and data service, (CP#21). MEETING DATE: May 24, 2010 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manger to sign Change Order #8 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn to revise the foundation sub-grade preparation, (CP#03); Replace the fill in the old clarifiers due to wet conditions, (CP#04); Add additional conduit under the slab for phone and data service, (CP#21), for a total of $4,897.27 for the city. BACKGROUND: The site of the Lower Yard Vehicle Maintenance Building and HRDC Bus Barn is where the old city waste water treatment plant was located. When the operation was abandoned a good deal of the plant infrastructure was left in place. The locations of the known equipment were incorporated into the existing site condition pages on the bid and construction documents. Prior to bidding there was some site investigation done by the engineers to assess the types and condition of the soils on the site. The test pits that were dug showed diverse soil conditions and a variety of soil layers that confirmed a good deal of past site disturbance. Once the excavation for the footing and foundation was complete, an assessment of the sub-base showed quite a degree of inconsistency. The sub-grade preparation in CB#03 includes the importation of fill material and the addition of Geogrid Fabric to establish a solid solid sub-base for the building. Cost for this material and installation for the city is $2,531.38. The large concrete clarifier tanks from the old plant are still buried on the site. During excavation the accumulate groundwater was pumped from the tanks. In the areas on site where the tanks are located under areas were stable soils are necessary the material in the tanks was 63 replaced with the appropriate they of fill that can be compacted, CP#04. Cost for this work for the city is $2,200.00. The phone and data systems for the building will be separated because the city has its own phone system and HRDC will need to be connected to Qwest for its phone system. The city is served from Bresnan for its phone and data connection. During the site visit with the utilities we discussed service lines into the building. The original plans show a 2 inch conduit running under the building slab from the termination box on the exterior of the building to the IT closet. The utilities have requested that there be separate conduits for each of the services entering the building to avoid problems in service down the road. The solution involves the installation of a second parallel conduit so that the services can be segregated. CP#18 is for the material and installation of the conduit for the city is $165.89. UNRESOLVED ISSUES: The original change request included consideration of some weather days and a contract extension for the removal of the asbestos containing materials. This approval has been removed from this change and will be dealt with separately. No others related to this proposed Change Order. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: The modifications to the work area are owner initiated changes and would be covered in the 12% Project Contingency. Activity to date under the contingency includes: Project Contingency $128,501.70 Change Order #1 HRDC $0 Change Order #2 Asbestos Remediation ($3,294.32) Asbestos Disposal ($1,545.50) ($4,839.82) Chance Order #3 Added Site Work ($2,362.30) Change Order #4 Costs above estimate for Welding Hood (revised) Included in the Pre-Const COs ($2,560.23) Change Order #5 Hose Bibs and Utility Separation costs addressed in Pre-Construction Change Order budget $0 64 Change Order #6 HRDC $0 Change Order #7 Modify the height of the parts counter and install a sliding glass window between the two work areas. ($1,097.80) Change Order #8 Revise foundation sub-grade preparation due to discover of unstable soils; Replace fill material in clarifiers; Add a second conduit run for phone and data. ($4,897.26) Non-budgeted items charged to contingency ($3,310.93) Contingency Balance Remaining $109,433.36 Attachments: Change Order Form #8 Change Order Resolution # 4258 Report compiled on: May 18, 2010 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 1 of 2 COMMISSION RESOLUTION NO. 4258 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #8, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 83 Resolution No. 4258, Change order #8 Page 2 of 2 PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 8th day of March, 2010. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: __________________________________________ GREG SULLIVAN City Attorney 84