Loading...
HomeMy WebLinkAboutResolution No. 4257, Change Order 7 for Lower Yard Vehicle Maintenance - HRDC Bus Barn.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: James Goehrung, Director of Facility Services Chuck Winn, Assistant City Manager SUBJECT: Approval of Change Order #7 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn to modify the height of the parts counter and install a counter window in the parts office. MEETING DATE: May 24, 2010 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manger to sign Change Order #7 for the Lower Yard Vehicle Maintenance and HRDC Bus Barn to modify the height of the parts counter, (CP#14), and install a counter window in the parts office, (CP#15), for a total of $1,097.80. BACKGROUND: The city side of the new facility will have the garage bay area where the actual repair of the vehicles will occur. Next to the bay area is a secured parts and equipment area. The areas will be separated by a partial wall. After reviewing the plans with vehicle maintenance staff they identified some minor changes to the layout that would improve the safety, comfort, and efficiency of their operations. The changes include raising the height of the parts counter from sitting height to standing height and the installation of a sliding parts counter window between the two work areas. The counter height was specified and bid as a 36 inch high counter. After reviewing the way this counter will be staffed and the kind of transactions that will occur, the crews are requesting an adjustment to the height of the counter to 42 inches. This height would be more ergonomic for people conducting business on both sides of the counter in a standing position. Cost for the substitution of a higher counter is $550.00. The separation wall between the two work areas is open. The proposed change would install a sliding window between the two areas. The window would moderate the noise from the shop, and improve the comfort level in the parts area. Cost for the window and installation is $547.80. 51 UNRESOLVED ISSUES: None related to this proposed Change Order. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: The modifications to the work area are owner initiated changes and would be covered in the 12% Project Contingency. Activity to date under the contingency includes: Project Contingency $128,501.70 Change Order #1 HRDC $0 Change Order #2 Asbestos Remediation ($3,294.32) Asbestos Disposal ($1,545.50) ($4,839.82) Chance Order #3 Added Site Work ($2,362.30) Change Order #4 Costs above estimate for Welding Hood (revised) Included in the Pre-Const COs ($2,560.23) Change Order #5 Hose Bibs and Utility Separation costs addressed in Pre-Construction Change Order budget $0 Change Order #6 HRDC $0 Change Order #7 Modify the height of the parts counter and install a sliding glass window between the two work areas. ($1,097.80) Non-budgeted items charged to contingency ($3,310.93) Contingency Balance Remaining $114,330.62 Attachments: Change Order Form #7 Change Order Resolution # 4257 Report compiled on: May 18, 2010 52 53 54 55 56 57 58 59 60 1 of 2 COMMISSION RESOLUTION NO. 4257 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #7, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 61 Resolution No. 4257, Change order #7 Page 2 of 2 PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 8th day of March, 2010. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 62