HomeMy WebLinkAboutResolution No. 4255, Change Order 6 for WRF.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: Bozeman Water Reclamation Facility, Phase 1 Improvements – Change Order No. 6. MEETING DATE: May 17, 2010 AGENDA ITEM TYPE: Consent. RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign Bozeman Water Reclamation Facility, Phase 1 Improvements – Change Order No. 6. BACKGROUND: Attached is a copy, of change order number 6 for the above referenced project. This change order includes 19 items. Four of the items are credits while the other fifteen are additions. Pages two through four of the document titled “Change Order No. 6 Summary” provides a short description of each of the items involved with this change. Additionally, the remainder of the document contains the detailed backup cost information for each item. No change in contract time is being provided with this change. The Substantial and Final Completion Contract Times are not changed. The final recommended decrease in cost and time extension for this change is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Overall this change order decreases the contract amount by $2,122.86 from $36,452,937.76 to $36,450,814.90. This will increase the contingency on the project from $1,804,504.15 to $1,806,627.01. Attachments: Change Order No. 6 Resolution 4255 Report compiled on: May 4, 2010 167 1 of 2 COMMISSION RESOLUTION NO. 4255 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH WILLIAMS BROTHER CONSTRUCTION, LLC., BILLINGS, MONTANA. WHEREAS, the City Commission did, on the 10th day of November 2008, authorize award of the bid for the Bozeman Water Reclamation Facility Phase I Improvements project, to Williams Brother Construction, LLC., Billings, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Williams Brother Construction, LLC., as contained in Change Order No. 6, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 168 Resolution No. 4255, Change Order 6 for WRF 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 17th day of May 2010. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275