HomeMy WebLinkAboutResolution No. 4255, Change Order 6 for WRF.pdf Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Bob Murray, Project Engineer
Rick Hixson, City Engineer
Chuck Winn, Assistant City Manager
SUBJECT: Bozeman Water Reclamation Facility, Phase 1 Improvements – Change
Order No. 6.
MEETING DATE: May 17, 2010
AGENDA ITEM TYPE: Consent.
RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign
Bozeman Water Reclamation Facility, Phase 1 Improvements – Change Order No. 6.
BACKGROUND: Attached is a copy, of change order number 6 for the above referenced
project. This change order includes 19 items. Four of the items are credits while the other
fifteen are additions. Pages two through four of the document titled “Change Order No. 6
Summary” provides a short description of each of the items involved with this change.
Additionally, the remainder of the document contains the detailed backup cost information for
each item. No change in contract time is being provided with this change.
The Substantial and Final Completion Contract Times are not changed. The final recommended
decrease in cost and time extension for this change is reasonable and commensurate with the
work involved.
UNRESOLVED ISSUES: None
ALTERNATIVES: As suggested by the City Commission.
FISCAL EFFECTS: Overall this change order decreases the contract amount by $2,122.86
from $36,452,937.76 to $36,450,814.90. This will increase the contingency on the project from
$1,804,504.15 to $1,806,627.01.
Attachments: Change Order No. 6
Resolution 4255
Report compiled on: May 4, 2010
167
1 of 2
COMMISSION RESOLUTION NO. 4255
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT
WITH WILLIAMS BROTHER CONSTRUCTION, LLC., BILLINGS,
MONTANA.
WHEREAS, the City Commission did, on the 10th day of November 2008, authorize award of the
bid for the Bozeman Water Reclamation Facility Phase I Improvements project, to Williams Brother
Construction, LLC., Billings, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and/or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a
municipal corporation, and Williams Brother Construction, LLC., as contained in Change Order No. 6,
attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed
to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and
directed to attest such signature.
168
Resolution No. 4255, Change Order 6 for WRF
2 of 2
PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a
regular session thereof held on the 17th day of May 2010.
__________________________________________
JEFFREY K. KRAUSS
Mayor
ATTEST:
________________________________________
STACY ULMEN, CMC
City Clerk
APPROVED AS TO FORM:
_____________________________________________
GREG SULLIVAN
City Attorney
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275