HomeMy WebLinkAbout Resolution No. 4247, Change Order 5 for Lower YardCommission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: James Goehrung, Director of Facility Services Chuck Winn, Assistant City Manager SUBJECT: Approval of Change Order #5 for the Lower Yard Vehicle Maintenance and HRDC bus Barn for the addition of hose bibs in the City Shop area and separation of the water and sewer lines. MEETING DATE: March 8, 2010 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign Change Order #5 for the City’s share of the cost of for the addition of hose bibs in the City Shop area, (CP#7), and separation of the water and sewer lines as required by the Department of Environmental Quality, (CP#12), for a total of $1,435.50. BACKGROUND: During the bidding process staff identified the need for hose bibs in the garage area for washing the facility. It was too late in the bidding process to include the hose bibs in an addendum prior to bid. Money was added to the project budget prior to award in the amount of $1,200.00. Cost for the hose bibs are now being added as a change order in the amount of $913.00. This figure is under the estimated amount and will stay in the project budget. During the plan review process that was done concurrent with the bidding, the Department of Environmental Quality specified that the domestic water and sewer line had to be separated by a distance greater than was shown on the bidding plans. Money for this item was added to the budget in the amount of $300.00. Cost for the utility separation is now being added as a change order in the amount of $522.50. This figure is under the estimated amount and will stay in the project budget. FISCAL EFFECTS: The addition of the hose bibs and the utility separation are listed in the budget under pre-construction change orders. The costs in Change Order #5 will be charged out to this portion of the budget. The dollar amount in the budget is $15,650.00. To date the items charged against this portion of the budget include: Fire alarm design, $1,994.50; Welding vent hood, $5,000.00 to Pre-construction COs ($5,000 budgeted, overage applied to Contingency- $2,560.23); Hose bibs, $913.00; Utility separation, $522.50. 31 Pre-Construction Change Orders $15,650.00 CO #4 Fire Alarm Design ($1,994.50) CO#4 Welding Vent Hood ($5,000.00) CO#5 Hose Bibs ($913.00) CO#5 Utility Separation ($522.50) TOTAL Pre–Const CO Balance Remaining $7,220.00 Project Contingency $128,501.70 Change Order #1 HRDC $0 Change Order #2 Asbestos Remediation ($3,294.32) Asbestos Disposal ($1,545.50) ($4,839.82) Chance Order #3 Added Site Work ($2,362.30) Change Order #4 Costs above estimate for Welding Hood (revised) Included in the Pre-Const COs ($2,560.23) Change Order #5 Hose Bibs and Utility Separation costs addressed in Pre-Construction Change Orders above ____________ Contingency Balance Remaining $118,739.35 ALTERNATIVES: As suggested by the City Commission. Attachments: Change Order Form #5 Change Order Resolution # 4247 Report compiled on: February 25, 2010 32 1 of 2 COMMISSION RESOLUTION NO. 4247 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #5, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 33 Resolution No. 4247, Change order #5 Page 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 8th day of March, 2010. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 34 35 36 37 38 39 40 41 42 43 44 45 46