HomeMy WebLinkAboutChange Order No. 4, Water Reclamation Facility Phase 1, Williams Brother Construction s 1 1 MORRISON CHANGE ORDER s e lai MAIERLE. ht. No. 4 DATE OF ISSUANCE January 28, 2010 EFFECTIVE DATE October 30, 2009 OWNER City of Bozeman CONTRACTOR Williams Brother Construction LLC Contract: Bozeman WRF Phase 1 Improvements Project: Bozeman Water Reclamation Facility OWNER's Contract No. SRF C303105-01 ENGINEER HDR/MMI ENGINEER's Contract No. 00.40746 You are directed to make the followin g changes m the Contract Documents: Description: Implement revised wage rates. Reason for Change Order: Required for Owner to obtain adequate funding for project. Attachments: Change Order No. 4 Summary with referenced attachment. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times: Substantial Completion: October 5, 2011 36,362,233.00 Ready for final payment: January 8, 2012 (days or dates) Net Increase (Decrease) from previous Change Net change from previous Change Orders No. JL to Orders No. 0 to 3 No. 3 Substantial Completion: 0 (209,295.24) Ready for final payment: 0 (days) Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: October 5, 2011 36,152,937.7 6 Ready for final payment: January 8, 2012 (days or dates) Net increase (decrease) of this Change Order: Net increase (decrease) this Change Order: Substantial Completion: 0 300,000.00 Ready for final payment: 0 (days) Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion: October 5, 2011 36,452,937.76 Ready for final payment: January 8, 2012 (days or dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and n -ss expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein represents t o and value for the subject work performed and the materials supplied under the terms of the contract a 1p. vork quantities and value were properly determined and are correct. a l i CTOR (Authorized Signature) Date RECOMMENDED BY 0 tO BY: 41" 2 0 2 -1040 (EN EER Signature) Date OWNER (Authorized Signature) Date EJCDC 1910-8-B (1996 Edition Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute. Change Order No. 4 Bozeman Water Reclamation Facility, Phase 1 Improvements Summary This change order consists of modifying wage rates for the project as required by the funding agency in order for the Owner to obtain adequate funding for the project. Wage Rates Bids for the project were opened on October 1, 2008 and bid with Montana Prevailing Wage Rates. The rates in place for the Contract are Montana Statewide Prevailing Heavy Construction Wage Rates with an Effective Date of July 18, 2008. This change implements Federal Davis Bacon Rates Heavy Construction Projects, General Decision MT080001, Modification 5, published on August 15, 2008. The revised wage rates are attached to this change order. Effective Date The effective date for implementation of the new wage rates is October 30, 2009. Ending Date The wage rates implemented by this change shall stay in place for the remainder of the Contract unless the Owner notifies the Contractor otherwise as the funding agency may modify this wage rate requirement in the future. If the Owner notifies the Contractor to re- implement` the original wage rates, the Owner will continue to pay the wage differential for two one week long pay periods following notification in order to allow time for the Contractor to notify its employees. Method of Determining Compensation Compensation shall be based on actual cost incurred by the Contractor along with applicable cost allowances allowed by the Contract. The Contractor shall submit with each pay request, or on a regular routine basis, a summary of each employee that is impacted by the rate change. The summary shall show for each impacted employee the total hours worked, the employee's classification and the wage differential being paid. A detailed summary shall also be provided for each subcontractor. The wage differential will only be paid on employees whose pay rate is impacted by implementation of the revised rates, for employees who have historically, based on the record of certified payrolls, been paid at a rate equal to or higher than the revised rates no compensation will be provided the Contractor. In cases where the revised rates result in a lower cost for the Contractor, the Owner will be entitled to these savings if the Contractor incurs these saving by paying employees at the lower rate. Estimate Cost of Change For the sole purpose of estimating the impact of this change on the Cost of the work, the estimated cost of the Change is $300,000.00. Actual costs will be based on actual costs to the Contractor as stated in the method of determining compensation. End N:\2105\054\Construction Docs \Change Orders \GO 4 \Change Order 4 Summary .docx MT080001 MOD 5 REVISED 10/03/08 MT1 THIS WAGE DETERMINATION WAS REPLACED ON 10/03/08******** General Decision Number: MT080001 08/15/2008 Superseded General Decision Number; MT20070001 State: Montana Construction Type: Heavy Counties: Montana Statewide. HEAVY CONSTRUCTION PROJECTS ZONE DEFINITIONS CARPENTERS, *CEMENT MASONS, LABORERS, AND TRUCK DRIVERS The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court House of the folowing listed towns to the center of the job: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HAVRE, HELENA, KALISPELL, LEWISTOWN, MILES CITY, MISSOULA Zone 1: 0 to 30 miles Base Pay Zone 2: 30 to 60 miles Base Pay $2.95 Zone 3: Over 60 miles Base Pay $4.70 *CEMENT MASONS ZONES: The above cities plus DILLON, GLASGOW, GLENDIVE, SIDNEY Modification Number Publication Date 0 02/08/2008 1 03/28/2008 2 05/16/2008 3 06/20/2008 4 07/11/2008 5 08/ CARP0028-002 05/01/2007 Rates Fringes Carpenters: (Zone 1) Carpenter Pilebuck... 22.00 8.40 MILLWRIGHT 24.00 8.40 CARP0028-004 06/01/2006 Rates Fringes Diver Tender 27.2 7.80 Diver 56.54 7.80 DEPTH PAY (Surface Diving) 050 to 100 feet $2.00 per foot 101 to 150 feet $3.00 per foot 151 to 220 feet $4.00 per foot 221 ft deeper $5.00 ELEC0044-001 09/01/2007 BEAVERHEAD, BIG HORN, BLAINE, BROADWATER, CARBON, CARTER, CASCADE, CHOUTEAU, CUSTER, DANIELS, DAWSON, DEER LODGE, FALLON, FERGUS, GALLATIN, GARFIELD, GLACIER, GOLDEN VALLEY, GRANITE, HILL, JEFFERSON, JUDITH, BASIN, LEWIS AND CLARK, LIBERTY, MADISON, MCCONE, MEAGHER, MINERAL, MISSOULA, MUSSELSHELL, PARK, PETROLEUM, PHILLIPS, PONDERA, POWDER RIVER, POWELL, PRAIRIE, RAVALLI, RICHLAND, ROOSEVELT, ROSEBUD, SHERIDAN, SILVER BOW, STILWATER, SWEET GRASS, TETON, TOOLE, TREASURE, VALLEY, WHEATLAND, WIBAUX, AND YELLOWSTONE COUNTIES Rates Fringes Line Construction (1) Lineman 32.12 11.88 (2) EgnipMent Operator....-.$ 23.82 10.95 (3) Experienced Groundman...$ 19.36 10.33 ELECO233-001 06/01/2008 Blaine, Broadwater, Cascade, Chouteau, Fergus, Glacier, Hill, Judith Basin, Lewis Clark, Liberty, Meagher, Petroleum, Phillips, Pondera, Teton, Valley, and Wheatland Counties Rates Fringes ELECTRICIAN........ 27.26 4.25%+8.55 ELECO233-002 08/01/200 BEAVERHEAD, DEER LODGE,GRANITE, JEFFERSON, MADISON, POWELL, AND SILVER BOW COUNTIES Rates Fringes ELECTRICIAN 25.50 4.25%+9.20 ELECO532-001 06/01/2008 GALLATIN, PARK, AND SWEET GRASS COUNTIES Rates Fringes ELECTRICIAN 26 4.25%+8.40 ELECO532-003 06/01/2008 BIG HORN, CARBON, CARTER, CUSTER, DANIELS, DAWSON, FALLON, GARFIELD, GOLDEN VALLEY, McCONE, MUSSELSHELL, POWDER RIVER, PRAIRIE, RICHLAND, ROOSEVELT, ROSEBUD, SHERIDAN, STILLWATER, TREASURE, WIBAUX AND YELLOWSTONE COUNTIES Rates Fringes ELECTRICIAN 26.83 4.25%+9.39 ELEC0768 03/01/2008 FLATHEAD, LAKE, LINCOLN, MINERAL, MISSOULA, RAVALLI, AND SANDERS COUNTIES Rates Fringes ELECTRICIAN 27.10 10.71 ELEC0768-003 07/02/2007 FLATHEAD, LAKE, AND LINCOLN COUNTIES Rates Fringes Line Construction (1) Lineman.................$ 32.60 12.01 (2) Groundman 19.49 11.01 (3) Line Equipment OPerator.$ 24.16 11.41 (4) Tree Trimmer 26.11 11.58 ENG10400-001 05/01/2008 Rates Fringes Power Equipment Operator (Zone 1) Group 1 22.47 9.05 Group 2 22.94 9.05 Group 3......,.. 23.34 9.05 Group 4 24.00 9.05 Group 5......... 24,50 9.05 Group 6... 25.60 9.05 Group 26.10 9.05 ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court House of the folowing listed towns to the center of the job: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA Zone 1: 0 to 30 miles Base Pay Zone 2: 30 to 60 miles Base Pay $3.50 Zone 3: Over 60 miles Base Pay $5.50 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Air Compressor; Auto Fine Grader; Belt Finishing Machine; Boring Machine, small; Cement Silo; Crane, A-Frame Truck Crane; Crusher Conveyor; DW-10, 15, and 20 Tractor Roller; Farm Tractor; Forklift; Form Grader; Front-end Loader under 1 cu yd; Heavy Duty Drills; Herman Nelson Heater; Mulching Machine; Oiler, all except Cranes. Shovels; Pumpman. GROUP 2: Air Doctor; Backhoe/Excavator/Shovel to and including 3 cu yd; Bit Grinder; Bituminous Paving Travel Plant; Boring Machine, large; Broom, self-propelled; Concrete Travel Batcher; Concrete Float Spreader; Concrete Bucket Dispatcher; Concrete Finish Machine; Concrete Conveyor; Distributor; Dozer, Rubber- Tired, Push Side Boom; Elevating Grader/Gradall; Field Equipment Serviceman; Front-end Loader 1 cu yd to including 5 cu yd; Grade Setter; Heavy Duty Drills, all types; Hoist/Tugger, all; Hydralift similar; Industrial Locomotive; Motor Patrol, except Finish; Mountain Skidder; Oiler Cranes Shovels; Pavement Breaker, EMSCO; Power Saw, self-propelled; Pugmill; PumPcrete/Grout Machine; Punch Truck; Roller, other than Asphalt; Roller, Sheepsfoot, self- propelled; Roller, 25 tons and over; Ross Carrier; Rotomill under 6 ft; Trenching Machine; Washing/Screening Plant. GROUP 3: Asphalt Paving Machine; Asphalt Screed; Backhoe/Excavator/Shovel over 3 cu yd; Cableway Highline; Concrete Batch Plant; Concrete Curing Machine; Concrete Pump; Cranes, Creter; Cranes, Electric Overhead; Cranes, 24 tons and under; Curb Machine/Slip Form Paver; Finish Dozer; Front Loader over 5 cu yd; Mechanic/Welder; Pioneer Dozer; Roller, Asphalt (Breakdown Finish); Rotomill, over 6 ft; Scraper, single, twin, or pulling Belly Dump; Yo-Yo Cat. GROUP 4: Asphalt/Hot Plant Operator; Cranes, 25 tons to 44 tons; Crusher Operator; Finish Motor Patrol; Finish Scraper. GROUP 5: Cranes, 45 tons to including 74 tons; GROUP 6: Cranes, 75 tons to including 149 tons; Crane, Whirley (all). GROUP 7: Cranes, 150 tons to including 250 tons (add $1.00 for every 100 tons over 250 tons); Crane, Stiff or Derrick; Helicopter Hoist; Crane, Tower (all). IRON001 0 FLATHEAD, GLACIER, LAKE, LINCOLN, MINERAL, MISSOULA, AND SANDERS COUNTIES Rates Fringes IRONWORKER 23.17 14.70 IRON0841-002 07/01/2005 REMAINING COUNTIES Rates Fringes IRONWORKER....... 20.45 12.76 LAB00098-001 05/01/2005 Rates Fringes Laborers: (Zone 1) Group 1 15.17 5.90 Group 2 17.99 5.90 Group 3 18.13 5.90 Group 4 18.85 5.90 LABORERS CLASSIFICATIONS GROUP 1: Flagperson GROUP 2: All General Labor work; Burning Bar; Bucket man; Carpenter Tender; Caisson Worker; Cement Mason Tender; Cement Handler (dry); Chuck Tender; Choker Setter; Concrete worker; Curb Machine-Lay Down; Crusher and Batch worker; Fence Erector; Form Setter; Form Stripper; Heater Tender; Landscaper; Pipe Wrapper; Pot Tender; Powderman Tender; Rail and Truck Loaders and Unloaders; Riprapper; Sealants for concrete and other materials; Sign Erection, Guard Rail and Jersey Rail; Stake Jumper; Spike Driver; Signalman; Tail Hoseman; Tool Checker and Houseman; Traffic Control worker. GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment Handler; Geotextile and Liners; High-Pressure Nozzleman; Jackhammer (Pavement Breaker); Laser Equipment; Non-Riding Rollers; Pipelayer; Posthole Digger (Power); Power Driven Wheelbarrow; Rigger; Sandblaster; Sod Cutter Tampers; Creosote Handler GROUP 4: Asphalt Raker; Asbestos Laborer; Cutting Torch; Grade Setter; Hazmat Worker; High- Scaler; Power Saws (Faller Concrete); Powderman ($1.00 per hour above Group 4 rate); Rock Core Drill; Tank/Vessel Cleaner; Track or Truck mounted Wagon Drill; Welder including Air Arc PAINO260-001 07/01/2002 BLAINE, BROADWATER, CASCADE, CHOUTEAU, DANIELS, FERGUS, GARFIELD, GLACIER, GRANITE (South of a line running East West through the Southern city limits of Phillipsburg), HILL, JEFFERSON, JUDITH BASIN, LEWIS AND CLARK, LIBERTY, McCONE, MEAGHER, PETROLEUM, PHILLIPS, PONDERA, POWELL (South of a line running East West through the Southern City limits of Helmsville), RICHLAND, ROOSEVELT, SHERIDAN, TETON, TOOLE, VALLEY, AND WHEATLAND COUNTIES Rates Fringes PAINTER....... 13.85 1%+3.45 PAINO260-002 07/01/2002 FLATHEAD, GRANITE (North of a line running East West through the Southern city limits of Phillipsburg), LAKE, LINCOLN, MINERAL, MISSOULA, POWELL (North of a line running East West through the Southern city limits of Helmsville), RAVALLI, AND SANDERS COUNTIES Rates Fringes PAINTER 16.85 1%+3.45 PAIN1922-001 06/01/2001 BEAVERHEAD, BIG HORN, CARBON, CARTER, CUSTER, DAWSON, DEER LODGE, FALLON, GALLATIN, GOLDEN VALLEY, JEFFERSON, MADISON, MUSSELSHELL, PARK, POWDER RIVER, PRAIRIE, ROSEBUD, SILVER BOW, STILLWATER, SWEET GRASS, TREASURE, WIBAUX, AND YELLOWSTONE COUNTIES Rates Fringes PAINTER (Industrial, includes industrial plants, tanks, Pipes, bridges)..•. 17.80 7.63 PLAS0119-001 05/01/2008 STATEWIDE (except Deer Lodge, Jefferson, Powell, and Silver Bow Counties) Rates Fringes Cement Masons: (Zone 1) Area 18.83 6.96 Area 2 20.24 6.86 AREA 1: STATEWIDE (except Deer Lodge, Jefferson, Powell, and Silver Bow Counties) AREA 2: DEER LODGE, JEFFERSON, POWELL, AND SILVER BOW COUNTIES PLUM0030-003 09/01/2007 BIGHORN, BLAINE, CARBON, CARTER, CASCADE, CHOUTEAU, CUSTER, DANIELS, DAWSON, FALLON, FERGUS, GARFIELD, GLACIER, GOLDEN VALLEY, HILL, JUDITH BASIN, LIBERTY, McCONE, MEAGHER, MUSSELSHELL, PETROLEUM, PHILLIPS, PONDERA, POWDER RIVER, PRAIRIE. RICHLAND, ROOSEVELT, ROSEBUD, SHERIDAN, STILLWATER, TETON, TOOLE, TREASURE, VALLEY, WHEATLAND, WIBAUX AND YELLOWSTONE COUNTIES Rates Fringes PLUMBER Commercial 26.05 12.65 Industrial Power Generating Plants. 28.40 12.65 PLUM0041-001 07/01/2008 BEAVERHEAD, BROADWATER, DEER LODGE, GALLATIN, GRANITE, JEFFERSON, LEWIS AND CLARK, MADISON, PARK, POWELL, SILVER BOW, AND SWEET GRASS COUNTIES Rates Fringes PLUMBER 28.00 10.75 PLUM0459-001 05/01/2008 FLATHEAD, GLACIER, LAKE, LINCOLN, MINERAL, MISSOULA, RAVALLI, AND SANDERS Rates Fringes PLUMBER...... 26.36 11.05 TEAM0002-001 06/01/2004 Rates Fringes Truck drivers: (Zone 1) Group 1 14.14 5.92 Group 2 18.84 5.92 TRUCK DRIVERS CLASSIFICATIONS: GROUP 1: Pilot Car GROUP 2: All Combination Trucks and Concrete Mixers; Distributor Driver; All Dry Batch Trucks; Dumpman, Gravel Spreader Box Operator; All Dump Trucks and similar equipment including DW 20, DW 21, or Euclid Tractor: Dumpsters; Flat Trucks; Servicemen; Lowboys, Four-Wheel Trailers; Float Semi-Trailer; Lumber Carriers, Lift Trucks Fork Lifts; Pick-up Driver hauling material; Powder Truck (Bulk Unloader type); Power Boom; Service Truck Dirvers, Fuel Truck Drivers, Tiremen; All Water Tank Drivers; Petroleum Products Drivers; Trucks with Power Equipment such as Winch, A-Frame Truck, Crane, Hydralift, Gout-Crete Truck, and Combination Mulching, Seeding Fertilizing Truck; Truck Mechanic WELDERS Receive rate prescribed for craft performing aperation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: an existing published wage determination a survey underlying a wage determination a Wage and Hour Division letter setting forth a position on a wage determination matter a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) if the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator d t9. v CO. COMMISSION RESOLUTION NO. 4241 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION /MODIFICATION OF CONTRACT WITH WILLIAMS BROTHER CONSTRUCTION, LLC., BILLINGS, MONTANA. WHEREAS, the City Commission did, on the 10th day of November 2008, authorize award of the bid for the Bozeman Water Reclamation Facility Phase I Improvements project, to Williams Brother Construction, LLC., Billings, Montana; and WHEREAS, Section 7 -5 -4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and /or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and /or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Williams Brother Construction, LLC., as contained in Change Order No. 4, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 1 of 2 Resolution No. 4241, Change Order 4 for WRF PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 8th day of February 2010. Jr pi r SUSS or ATE City 9r *(0 APPROVED AS TO FORM: I■Ow, GRE •l. LIVAN City Attorney 2 of 2