HomeMy WebLinkAboutChange Order 03, City Shops/HRDC Bus Barn, BN Builders h„ dowting I sandhotm I architects JOINT OWNER CHANGE ORDER C.O. #03 Project: City Shops/ HRDC Bus Barn Date: January 8, 2010 Owner 1821 N. Rouse Ave Architect Bozeman, MT 59715 Architect's Project No: 08 -265 Contractor Field To Contractor: BN Builders, Inc Contract Date: November 4, 2009 Other 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Contract For: General Construction The Contract is changed as follows: Increase Contract Sum. Reason for change: Removal of City's dirt stockpile to construct stormwater detention pond (CP #09: $1,306.80) Removal of fencing and placement of temporary fencing to accommodate storm drain construction. This portion of the fence was mis- located on site plan. (CP #10: $1,334.03) The gas line running through the property was not as deep as anticipated, and the storm drain had to be modified at the intersection and a manhole added. (CP #11: $2,083.77) Attachment(s): CP# 09 CP #10 CP #11 Total Contract Sum Adjustment: The original Contract Sum was 1,907,600.00 The net change by previously authorized Change Orders 14,585.64 The Contract Sum prior to this Change Order was 1,922,185.64 The Contract Sum will be increased by this Change Order by the amount of 4,724.60 The new Contract Sum including this Change Order will be 1,926,910.24 City of Bozeman Contract Sum Adjustment: The original Contract Sum was 1,049,231.41 The net change by previously authorized Change Orders 3,294.32 The Contract Sum prior to this Change Order was 1,052,525.73 The Contract Sum will be increased by this Change Order by the amount of 2,362.30 (50% of Total Change Order) The new Contract Sum including this Change Order will be 1,054,888.03 HRDC Contract Sum Adjustment: The original Contract Sum was 858,368.59 The net change by previously authorized Change Orders 11,291.32 The Contract Sum prior to this Change Order was 869,659.91 The Contract Sum will be increased by this Change Order by the amount of 2,362.30 (50% of Total Change Order) The new Contract Sum including this Change Order will be 872,022.21 Contract Time Adjustment: The Contract Time will be increased by zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is: July 28, 2010 JOINT OWNER CHANGE ORDER C.O. #03 Not valid until signed by Architect, Contractor, and Owners. Signatures: Architect: Dowling Sandholm Architects By:_�(,,1,n7 Date: t heVia 15 West 14 Street Suite 103 Mike Wiseman Helena, Mt 59601 Place Architecture By: Date: l�¢l 118 E. Main St Sa Kazemine'ad Bozeman, MT, 59715 Contractor: BN Builders, Inc By: I/ Date: I c(//6 2066 Stadium Dr., Ste 102 Scott Jay r3,rarij 4M Bozeman, MT 59715 Owner: City of Bozeman By /`4 Date: I/ i'I/Ip P.O. Box 1230 Chris Kukulski Bozeman, MT 59771 Human Resource Date: Oil /J Development Council Lee Hazel 32 South Tracy Bozeman, MT 59715 Page 2 of 2 File 21f CO #03 Joint.doc B N B BNBuilders, Inc. Thursday, December 17; 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal CP# 9 Bozeman City Bus Barn 509012 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 9 Description: Removed City stockpiled material at Bus Barn Det. Pond Proposed Amt: 1,306.80 Days Requested: 0 days Scope of Work (see attached for detailed cost summary): Provide labor, equipment, materials to remove .a berm and extra misc. material that had been stockpiled over the detention pond location. 0 Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the price for this work. Additional costs may apply if authorization is received after BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work. BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Submitted by: Accepted by: Date: 1 /8/10 Scott Jay Mike Wiseman BNBuilders, Inc Dowling Sandholm Architects CHANGE PROPOSAL DETAIL BACKUP Project 509012 CP 9 B N B Bozeman City Bus Barn 1812 N. Rouse Avenue Bozeman, MT 59715 BN Builders, Inc. Phone: 406 582 -7412 Fax: 406 582 -7436 Contractor Description Amount Sime Material Removal $1,188.00 BNBuilders, Inc. Overhead Profit $0.00 BNBuilders, Inc. OH Profite Subcontractors $118.80 Total: $1,306.80 c .i. I 5inti6 Pg.tpo*L 501e,,,,,,of4 co IQ rs) 0 C 0 0 0 tra 0 .07 LO vi ex) 0 0 0 0 fa ft) i 5 .0. O CO Co Co I•r1= in g 5 0 m E. K m 0 .0 0 V1 a) a) 'CI ,-.1- -,-4- 01, i5 fp rD rD CU V) C1.1 CIJ 0 rr co rn -1-4 MI O fa -1 0 0 0 0 r) n f. X/ r. CO C C LSI (.11 "X Z Lf) ..1 0 0 O I.A 0 00 l''' 0 0 r- -i -I 0 0 '0 "V rn rn r- r.4-4 r.n x x 4 4 o 0 4.1 o III ID IL V frt ri O 0 I-A I-k N.I NI I.0 Ln 0 0 00 0 CO 0 QD 00 co Fo 0 1,,r1 tri p9 b b b 00 O 8 b o 00 00 B N B BNBuilders, Inc. Thursday, December 17, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal CP# 10 Bozeman City Bus Barn 509012 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 10 Description: RFI #6 Remove Approx. 200If of Fencing /Install Temp Fence Proposed Amt: 1,334.03 Days Requested: 0 days Scope of Work (see attached for detailed cost summary): Provide labor, equipment materials to remove approx. 200If of fencing and install temporary fencing so new sewer line installation could continue as detailed in RFI 6. 0 Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the price for this work. Additional costs may apply if authorization is received after BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work. 0 BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Sub red f ed by: Accepted by: Date: a r i� —O 1 /8/1 0 Cott Jay Wiseman BNBuilders, Inc 11 Dowling Sandholm Architects CHANGE PROPOSAL DETAIL BACKUP Project 509012 CP 10 B N B Bozeman City Bus Barn 1812 N. Rouse Avenue Bozeman, MT 59715 BNBuilders, Inc. Phone: 406 582 -7412 Fax: 406 -582 -7436 Contractor Description Amount Fence Removal /Reinstall $1,212.75 BNBuilders, Inc. Overhead Profit $0.00 BNBuilders, Inc. OH Profite Subcontractors $121.28 Total: $1,334.03 1 a§ 8 2 f 69 64 o o 69 CO 69. t9 t 6t sr 8 CO 0 0 0 oi 0 e j k J a c .2 c.:),, J 2 a i I-- g ti E E ƒ 3 03 o t 7 7 a (5 a o a o 9 a 7 r ƒ e Z t k k 0 U... u.9 f .0 -I -J -I 0 CI 0 0 7;...e.. 2 I 62 B.N g Request for Information BNBuiiders, Inc. RFI No: 6 Bozeman City Bus Barn BNB Project 509012 1812 N. Rouse Avenue Bozeman, MT 59715 Date: November 24, 2009 Submitted To: Mike Wiseman Submitted Sy: Jenae Benner Dowling Sandholm Architects BNBuilders, Inc 55 West 14th Street 293 Rodeo Drive Helena, MT 59601 Florence, MT 59833 Tel: 406-556-0113 Tel: 406-375-6920 Fax: 406-375-6921 Subject: East Property Line Fence Discipline: Architectural Document Re C1.0 Spec Section: Subcontractor.' Slme Construction Subcontractor RFI No: Question Date Required: 12/1/2009 On drawing C1.0, the east property line fence is shown running on the property line on the east.side of the Police Impound Lot, but this is not the case. The fence actually jogs and is about two feet off the property line when it•reaches the North East corner of the Impound Lot. The issue is that the new sewer line runs about 18" of the existing fence and is about 3.5 feet deep which will undermine the fence and cause it to collapse. Approximately 200 feet of fence to the east of the.impound lot will need to come down during construction of the sewer line. Does the Owner want a fencing contractor to directly do this work to reinstall the fence or have BNB do It at our cost plus rates? Also, should the fence be reinstalled at its original location or on the propert line as the existing plans show? *Approximately -31- 25' of fence section has been removed so She can continue work without delays. Answer The Owner has Indicated that BN can remove the fence during construction. The existing fence material may be used as a temporary fence at BN's discretion for site security and to maintain a horse fence for the adjoining property. The City will install a permanent fence at a future date, or make arrangements for the work to be done. Answered by: Mike Wiseman, Dowling Sandholm Architects Date Answered: 12/3/09 Copes To: Company Contact Fax Notes Page 1 of 1 BNBuilders, Inc. Thursday, December 17, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal CP# 11 Bozeman City Bus Barn 509012 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 11 Description: ASI 3 Revised Storm Sewer Manhole Proposed Amt: 2,083.77 Days Requested: 0 days Scope of Work (see attached for detailed cost summary): Provide labor, equipment material to complete additional work associated with ASI 3. o Please sign below and return a copy of this letter to Indicate your acceptance of thls extra work and approve the price for this work. Additional costs may apply if authorization is received after BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work. BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Sub fitted by: Accepted by: Date: c r (2, 1/8/10 Scott Jay Mike Wiseman BNBuilders, Inc Dowling Sandholm Architects I CHANGE PROPOSAL DETAIL BACKUP Project 509012 CP 11 B N B Bozeman City Bus Barn 1812 N. Rouse Avenue Bozeman, MT 59715 BNBuilders, Inc. Phone: 406 582 -7412 Fax: 406- 582 -7436 Contractor Description Amount Sime- Revised Sewer /MH $1,89434 BNBuilders, Inc. Overhead Profit $0.00 BNBuilders, Inc. OH Profite Subcontractors $189.43 Total: $2,083.77 Oo p p ifi" N O O CIO Q O 2 O O' O O. 0 0 O O Q O ry 0 to P O N N! M T to C O C O r-: 21Y 2A to to O: O V d' C' m O. O o VD 4 Ill c i N N. i 4 t us 1A IA 2D C' 20 C' I. n N 20 211 e-1 N. ri'N N. C -l' -4 F VI. ii,. VI. •I. V, V, VI. VS tn. 1 tn. VI. VI. VI.. VI. N VI. V? VI. VI. VI. y V1 V}. O O 8 O 0 0 0 0 O. O O O 8 O O O O N O to 1: Cl �1 C1 2A O c1 Q C7 2A 2A d ci 6 C 6 O 21Y C O tD CO 4 of C) 0 2D to IA N1 a 4 a 211 LA tom N o V C' Q1 O O l0 1/1 VI -.O.)-• N. N N C D t/I. VI. 14 VI. .VI. VI. t/I. VI. VS 1/T in VI. Vl tn. VI. 'VI. VI. K. i4 V? tit. VI. e-1 ri el ri VI e-1 211 ri h V1 i1/ N CA 1•'1 t-•I e-I el .-I I-4 ri r.i C. N ey. ■-1 N p F l co a tea e'rWz ce u a cc Z 1 w u., o Z z to U U M M cc cc oZ 3 1- o 1 a W C ZZ; m h c CL N el ri el 1-1 N N N V C t C: C C C 0000 L. a 7 d a 11.1 y a 0 u St 2 2 2 Z to "r) H 2g22 v w it to J J to ui to vs en cc Z IX 10 VI CA VI IA Q. a0 L 2 O I L 14 Y CC 3; ea L c c k.7 Lue N v v Z ti0 U. a ,:u icu c r0: R, CC m a 4 4 Y y 5 Q c DI E E U m g, v a 2 2 a a w c p 0 a' a a. a to E s i s o a a c c 3 a o: d Y t7: V. O. O O O' Q u .0 y' h Q +1. h VI 2A N CC CV u. r R to u. u a. D q d. N TO.. to w 114 L L c C 0 o m a� C y it N L C L G g a a a a a o o H i l 76 X J J: J A 2 C 2 C 2 z m u ‘u a a W W -4 J J J. 0 U.' 0 W Sc G 2 N y yy 00 C c 210 00 00" tfii 2 L O o H G Ly u 6 0 O 0 5. W O o o o O j r. 0 1... n ,-1 0 co 0 0 0' 1 O p ..-.1 p ci N O p r1 co V ry O O OI C cO m N co F W r ma y co N GO est 0 M N ti H M N t O ri Q CO CC dowting I sandhoim 1 architects ARCHITECT'S SUPPLEMENTAL INSTRUCTION ASI #03 Date: November 30, 2009 Job Number: #08 -265 Project: City of Bozeman/ HRDC Issued To: Scott Jay City Shops/ Bus Barn BN Builders 1812 N. Rouse Ave. 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Bozeman, MT 59715 Regarding: Revised storm sewer and manhole Information: Please see the attached information from Cordell. This info has already been supplied to Sime. Pleaes notify of any changes to cost. Attachments: Manhole shop drawing 04-1 GRADING AND DRAINAGE DETAILS. Issued By: i n Dowling Sandholm Architects By: Date: 11/30/09 Michael Wiseman End of Architect's Supplemental Instructions m zg o a 1 o xz y Mal DRAWG IN PROJECT Zoo o r --.1p m Cn Cn En o Z i n 0 D m m n N m cA Np Sill T) N i 7 Z 0 0 0 go m F z N tt I c b Z ill y lJ 0 CONTRACTOR ENGINEER M N d CO CI) al Cn 0 0 c '-3 rn r t- z n 2` ro �r t a) 0 4 0 2 p a o d 0 E o cp Z p y Y N n, n, t z cn trl r v, n cn o 0 0 x n Z 03 r NA O y Er cn t- z nB 4 y i oo c w p C b 0 CI) 6 e >•r� d "gr T•1-3 1w'LIe�.•••1311 -3 eW swum ONeleeM 68 -61 -11 B I O 6J l..d .4 6P•w�e SGLBS IW'NtlW3Z09 a., 10986 L eOMOFI 9 IA •xowozeL OD-M-9 m9 BD -00-11i, 1 -e qQ r0 I9luegvq [9 0f •wa lue4Wx5 SSSL doa rumens a, ee --9 3AV 3S110a 1 SLSG i IS e03 198 Duna 6N11 -9 C o sioAemns v eca ,3 MB 63-1x -9 z A11113V4 Nays sna paaH Sd U ONS ALTO 0 Z: siasul6u3 lsuolsss;oid AO 1•1331•133003 a N MSn9 age 60 -61-• "maw' a9 319 a! 571V130 ROVNIvtia ONv ONIOvue 3 1 N �S31dI00SSV 'd pNIH33NION3 Alms 3r� g g a ij 1i I tJ3J w Y:? Bh5 I e 1 Of t i 1411 1 1 j 1 iiv! r s NI), ,4� r i ii i k 1 �11� 1 1Y e% e$ 50 1011 ae w a6 r 6 e i l 1 1 1 1 l i a z N db e i E I i ill I kit, t r i a,a ig; n �e 43 E6 N Z�� •Y: B b NDr H08 i�� yys �u 8 111 it! 1@ 1 :r ;C11`'$ wge I. m 1 l i i 1 1i gig 1 1 r n WP V 1 9 8 n I! l I s 6 b o I 1 I 1 I I P l' ar th I 14 L 111 H 1 s u l. I 1 I 1 I I I I i I I I I I I I I 8 1 i 1 1 Iii 1 1 r, z 1. II r s L J t W g k j!!J I 1 I 4 4 �1k i ,c 5 4110 1_ I 1 10�a1 w I I I I I I a 11._1 W p II _a E gg s 1 I ir— 11 -4m IA MINF a. z .�i W g,____ •I e ewe ,u�� v� R Y r s. i +io I l i H 8 I 111 1 L j litt 1 kl I II g, -1.., 1 r 1 A: ivb.-- .,..4 IhacipmmItro!,i, yp r. i R L 7- llll I I 1 1 1 I I g. t 1 I 1 1 1 1 B wb Yo-- WOC.--- .lva'GGlfd--- VJVw-e WAW \Y--mu.uC9RWtUBe\91 J Cr 0 COMMISSION RESOLUTION NO. 4239 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BN BUILDERS, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of October 2009, authorize award of the bid for the Construction of the Vehicle Maintenance Building and HRDC Bus Barn to BN Builders, Bozeman, Montana; and WHEREAS, Section 7 -5 -4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and /or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and /or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and /or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Bozeman, Montana, as contained in Change Order #3, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 1 of 2 Resolution No. 4239, Change Order 3 PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 1st day of February, 2010. lik KRAUSS "it r ATTFT` �F B2 e s ep t ic T IN Co. 0 APPROVED AS TO FORM: TR G SULLIVA City Attorney Page 2 of 2