Loading...
HomeMy WebLinkAboutMemorandum of Understaning iwth the Downtown Bozeman Partnership.pdf COMMISSION MEMORANDUM REPORT TO: Honorable Mayor and City Commission FROM: Anna Rosenberry, Finance Director Chris Kukulski, City Manager SUBJECT: Authorize City Manager’s Signature on Memorandum Of Understanding with the Downtown Bozeman Partnership for Payment of Impact Fees on Blast Damaged Properties by the Bozeman Downtown Tax Increment (TIF) District. MEETING DATE: March 1, 2010 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize City Manager’s Signature on Memorandum of Understanding. BACKGROUND: Re-construction of buildings on the site of the March 5, 2009 explosion may result in an impact fee charge to the property owner. If the owners rebuild essentially the same buildings as existed before the incident, there would be no impact fees due. If they expand water or sewer services, or change uses, impact fees may be owed. In the interest of encouraging urban redevelopment and rehabilitation (statutorily authorized activities for Increment Districts,) the Downtown Tax Increment District Board has approved paying such fees from District funds, for the following locations that were severely impacted by the incident: · 209, 211 East Main Street (Pickle Barrel, Rockin’ R Bar) · 215 East Main Street (Boodles) · 219 East Main Street (Montana Trails Gallery) · 221, 223 East Main Street (Lilly Lu, Toltsted Architects) · 225 East Main Street (American Legion) · 229, 231, 233 East Main Street (Starky’s Deli, 2nd floor apartments, RM Toy Co.) Attached is a schedule of the value of the impact-fee related service connections before the explosion. The TIF will pay any impact fee amounts above these “credit” amounts. The amount already calculated for the reconstruction of the Legion Building, above the credit amount, is $12,000 and the estimated cost above the credit amount for the F&H Building is $50,000. 33 The Memorandum instructs the City’s Planning and Finance Departments to arrange the payment (if any) out of the District’s Fund with the City. FISCAL EFFECTS: The FY10 work-plan and budget for the Downtown Tax Increment District identified a non-allocated reserve of $250,000. The impact fees would be paid from this line item in FY10. Additional dollars will be budgeted in FY11 if necessary, as the remaining re-development information becomes available. ALTERNATIVES: As suggested by the City Commission. Attachments: FY10 Work-plan and Budget for Downtown Tax Increment District Blast Site Impact Fee “Credit” Amounts Memorandum of Understanding 34 Downtown Bozeman Tax Increment Finance (TIF) Improvement District Board 2009 Annual Report On November 6, 1995, the City Commission passed Ordinance No 1409 adopting the Urban Renewal Plan for downtown Bozeman. The intent and purpose of the Urban Renewal Plan emphasizes: 1. Bozeman’s historical character as a “working” downtown shall be maintained. 2. Traffic movement and access shall be designed with the emphasis on the downtown as a designation rather than improving the flow of through traffic. 3. The facilitation of private/public partnerships is encouraged in the implementation of the Plan. 4. Objectives shall be accomplished by incentives whenever possible. 5. Private property rights will be respected. 6. Administrative practices shall be conducted in a constructive manner which fosters cooperation. The Urban Renewal Plan established nine “Guiding Principles” to provide direction for improving Bozeman’s historic downtown. The Urban Renewal Study Committee considered the first three principles more important than the next three with the last three the least important. However, the Committee deemed all nine principles to be vital to achieving the vision for downtown. Key implementation actions were identified for each principle (may apply to multiple principles, but are only listed once below). 1. Strengthen downtown’s economic vitality · Provide more, better managed parking; retain public offices and anchor businesses; facilitate commercial development; eliminate unnecessary regulatory barriers to reinvestment; enable high density housing; eliminate through truck traffic and restore Main Street as pedestrian- friendly 2. Improve the safety, security and health of the district · Improve traffic flow emphasizing downtown as a destination; improve public works; improve night-time lighting; improve sidewalks; increase police presence; improve alley and parking lot appearance and safety 3. The image of downtown shall be continuously improved · Improve streetscape aesthetics and amenities; enhance appearance of and accessibility to Bozeman Creek; improve trash removal 4. Downtown’s accessibility shall be improved · Provide effective public transportation; better accommodate bicycles; reduce reliance on private automobiles 5. “Community Partnership” is fundamental to downtown’s success · Encourage growth of cultural activities; preserve historic character 6. Downtown’s diversity shall be facilitated 7. The cost of projects and programs shall be weighed against their benefits 8. Downtown shall become more user friendly 9. Cultural activities shall be nurtured and expanded downtown TIF-IDB Mission Statement The Downtown Bozeman Tax Increment Finance board (TIF) will foster an economically thriving district that: 1) attracts investment; 2) stabilizes and strengthens the tax base; and 3) supports the vitality and diversity of the Gallatin Valley as its social and cultural center. 18035 Tax Increment Finance-Improvement District Board (TIF) FY2009 Program Evaluation Downtown Parking Garage $428,915 invested The TIF Board continued to support the construction of the Parking Garage by making the first bond payment of $416,225. Finally, the TIF purchased $12,690 of trash receptacles for the facility that match those placed by the TIF throughout downtown. Chris Naumann, TIF Executive Director, has continued to play an active role in the following components of the parking garage project: facility signage design, facility opening logistics, and construction completion. Downtown Partnership Management Fee $73,000 invested The TIF is a member of the Downtown Bozeman Partnership, LLC which serves as the incorporated management agency for all of the downtown organizations. This management fee pays for a portion of the operating costs of the Downtown Partnership office in addition to a portion of the payroll costs of Chris Naumann, who serves as the Executive Director of the TIF. Streetscape Element Purchases $26,610 invested The TIF purchased additional streetscape elements to augment those already located in the downtown district. This year’s purchases included: 6 pedestrian benches, 10 trash receptacles, and 12 bicycle racks. Downtown Parking Signage Project $40,000 invested The TIF contributed to this Downtown Partnership project for the design, permitting, fabrication, and installation of a comprehensive parking signage plan. The project will include wayfinding signs directing people to the various public parking facilities. The project will also include substantial signs identifying the surface lots. The branding developed has been incorporated in the signs at Bridger Park. Hawthorne School Improvement Plan $9,530 invested The TIF Board funded the purchase of two SpeedSentry units. These units use radar technology to display oncoming vehicle’s speed and incorporate a 25 mph speed limit signs. These radar speed limit signs were identified as safety improvements by Hawthorne’s Safe Routes to School Plan. Streetscape and Park Maintenance $6075 invested The TIF invested in powder coating the downtown bike racks as the original paint had failed and the steel was beginning to corrode. The TIF also pays for the replacement of the street lamp light bulbs. For several years the TIF has taken responsibility for the seasonal maintenance of the landscaping, amenities, and irrigation system at Soroptomist Park. To date this work has been coordinated with Greenspace Landscaping. Side Street Streetscape Project $4,540 invested The TIF Board completed the planning of the downtown side street streetscape design with TD&H Engineering. The Project would implement pedestrian improvements along 31 block faces in the downtown district. The proposed streetscape improvements included: new patterned sidewalks and curbs; new historic street lamps, trash receptacles, pedestrian benches and bike racks; plus the addition of dozens of trees. 18136 Tax Increment Finance-Improvement District Board (TIF) FY2010 Work Plan TIF Continuing Programs Downtown Parking Garage $424,290 budgeted The TIF will make the annual bond payment for the construction of Bridger Park, the downtown parking garage. Downtown Partnership Management Fee $74,000 budgeted The TIF is a member of the Downtown Bozeman Partnership, LLC which serves as the incorporated management agency for all of the downtown organizations. This management fee pays for a portion of the operating costs of the downtown office at 224 East Main Street in addition to a portion of the payroll costs of Chris Naumann, who serves as the Executive Director of the TIF. Downtown Improvement Plan Implementation $50,000 budgeted The TIF board has allocated funds to be invested in a high-priority project identified by the Downtown Improvement Plan. These funds could be used for further planning or design projects or for implementation of a particular project. Redevelopment Assistance Grant Program $50,000 budgeted The TIF board is finalizing a program to support current or potential developers, owners, and tenants with technical assistance during the preliminary phases of possible redevelopment projects in the downtown tax increment district. This program is intended to encourage a higher level of quality and design in the downtown environment. The following services are eligible for Technical Assistance funds: · Redevelopment feasibility studies · Preliminary development review assistance · Preliminary building condition assessment studies · Renovation, restoration and/or reuse analysis Streetscape Assistance Program $25,000 budgeted This TIF program will provide property owners with partial reimbursement for the installation of historic street lamps in accordance with the Downtown Streetscape Plan. The program is designed to stimulate private investment, redevelopment of property and the improvement of public areas in the downtown urban renewal district. Streetscape Element Purchases $20,000 budgeted The TIF will continue to supplement the existing streetscape inventory by purchasing additional historic street lamps, trash receptacles, pedestrian benches, tree guards and bike racks. Streetscape and Park Maintenance $10,000 budgeted The TIF will continue to maintain the large number of streetscape elements in the downtown district, all of which were originally purchased with TIF funds, including: historic street lamps, pedestrian benches, trash receptacles, tree guards, and bicycle racks. Depending on the recent adoption of Soroptomist Park as an official City of Bozeman park, the TIF will consider park maintenance expenditure this fiscal year. 18237 Downtown Tax Increment District FY2010 Budget Approved Proposed Category FY2009 Budget FY2010 Budget Income Starting Cash Balance 537,870$ 357,771$ Income from TIF (estimated)552,891$ 692,075$ Entitlement Share State of Montana 34,620$ 34,620$ Interest Income (estimated)15,000$ 10,000$ Other Income (sold Library 12 benches)-$ -$ Total Income 1,140,381$ 1,094,466$ Expense Operations Management Fee and Admin.71,500$ 74,000$ Fee for tenant improvements Total Operations 71,500$ 74,000$ Street Improvement New Public Parking Signage/branding 40,000$ -$ Engineering for Streetscapes 10,000$ -$ Street Furniture and Park Maintenance 10,000$ 10,000$ Sidestreet Streetscape amenities 50,000$ -$ Streetscape--new purchases 37,000$ 20,000$ Streetscape Assistance Program 25,000$ Total Street Improvements 147,000$ 55,000$ Planning Downtown Neighborhood Plan 40,000$ -$ Safe Routes to School-Hawthorne 53,975$ -$ Redevelopment Assistance Grants -$ 50,000$ DBIP Implementation Funds 50,000$ Total Planning 93,975$ 100,000$ Parking Structure Garage Cash Contribution 230,000$ -$ Garage Bond Payment 425,790$ 424,287$ Garage trash receptacle purchase -$ Total Parking Garage Payments 655,790$ 424,287$ Total Expenses 968,265$ 653,287$ Non-Allocated Reserve -$ 250,000$ Year-End Balance 172,116$ 191,179$ 7/16/2009 TIF Budget 2010 Approved.xls 18338 March 2009 Main Street Gas Explosion Impact Fee Credit from Destroyed Buildings EstimatePrepared Nov. 20, 2009 by Chris SaundersPrepared Nov. 20, 2009 by Chris Saunders225EMainAmericanLegion$358594$320134$72747$1249226$2000701Pre‐explosion ConditionAddressBusiness NameWater Meter SewerFire Area*Street Area* Site Use 211‐215 E MainRockin R Bar/Boodles2@0.75 inch 2@0.75 inch10,8009,180 Quality Restaurant219 E MainMontana Trails Gallery0.75 inch 0.75 inch3,9003,315Retail223 E MainLilly Lu0.75 inch 0.75 inch4,0503,443Retail225 E MainAmerican Legion0.75 inch 0.75 inch3,9003,315 Quality Restaurant229 E MainStarky's Delicatessen0.75 inch 0.75 inch4,2003,570Quality Restaurant /2 ApartmentsSame owner233 E MainRocky Mountain Toy Company 0.75 inch 0.75 inch4,3503,698 Retail/2 ApartmentsSame ownerEstimated Credit ‐ Fees based upon 2009 adopted fees and fee percentagesAddressBusiness NameWater SewerFireStreetTotal Estimated Credit211‐215 E MainRockin R Bar/Boodles$7,171.88$6,402.68$2,014.52$34,594.92$50,184.00219 E MainMontana Trails Gallery$3,585.94$3,201.34$727.47$10,985.35$18,500.10223 E MainLilly Lu$3,585.94$3,201.34$755.45$11,409.52$18,952.25225EMain   AmericanLegion $358594, .$320134, .$72747.$1249226$2000701, ., .229 E MainStarky's Delicatessen$3,585.94$3,201.34$1,759.95$10,914.85$19,462.08233 E MainRocky Mountain Toy Company $3,585.94$3,201.34$1,773.94$10,315.33$18,876.55*Building area information taken from MT CAMAS data set. Credit may differ if alternative information becomes availableMeter size and numbers taken from the service cards in the Engineering Plat Room39 March 2009 Main Street Gas Explosion Impact Fee Credit from Destroyed Buildings EstimatePrepared Nov. 20, 2009 by Chris SaundersPrepared Nov. 20, 2009 by Chris Saunders40 41 42 43