Loading...
HomeMy WebLinkAboutResolution No. 4231 Change Order No. 2 for 2009 Water Renovations Project.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: 2009 Water Renovations – Change Order No. 2 MEETING DATE: January 11, 2010 AGENDA ITEM TYPE: Consent RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign change order number 2 for the 2009 Water Renovations Project. BACKGROUND: Attached is a copy of change order number 2 for the above referenced project. This change order includes 7 items. Three of the items are for sewer services that were not found where they were located and as a result were broken and had to be repaired. One was to replace backfill material that was to wet to be used. One was to remove concrete that was discovered at the tie in location at Main and Willson. One was to raise a hydrant that was lower than the plans had shown, and the final was for additional supervisor time associated with all of the changes. A detailed breakdown of the cost information for each item is attached to the change order. This change also includes an increase of 4 days for the Substantial and Final Completion Contract Times. The final recommended increase in cost and time extension for this change is reasonable and commensurate with the work involved. FISCAL EFFECTS: Overall this change order increases the contract amount by $12,427.45 from $726,285.00 to $738,712.45. The project budget was $1,000,000.00. ALTERNATIVES: As suggested by the City Commission. Attachments: Change Order 2 Commission Resolution 4231 Report compiled on: 1/5/10 17 1 of 2 COMMISSION RESOLUTION NO. 4231 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH EDSTROM CONSTRUCTION, INC., REXBURG, IDAHO. WHEREAS, the City Commission did, on the 1st day of June 2009, authorize award of the bid for the 2009 Water Renovations project, to Edstrom Construction, Inc., Rexburg, Idaho; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Edstrom Construction, Inc., as contained in Change Order No. 2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 18 Resolution No. 4231 2 of 2 PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 11th day of January 2010. _____________________________________________ JEFF K. KRAUSS Mayor ATTEST: ________________________________________ AIMEE KISSEL Acting City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 19 20 21 22 23 24 25 26 27 28