HomeMy WebLinkAbout09- Amendment 2 to services agreement for Great West Engineering for 2008 Sewer Rehabilitation Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer epA Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: Amendment No. 2 To Professional Services Agreement For Great West Engineering for the 2008 Sewer Rehabilitation Project. MEETING DATE: December, 14, 2009 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign Amendment No. 2 To Professional Services Agreement For Great West Engineering for the 2008 Sewer Rehabilitation Project. BACKGROUND: The 2008 Sewer Rehabilitation Project was awarded on October 20, 2008. One component of the original project was to pipe burst the main on Lincoln, but the bids that came in on that portion of the project were too hiP and were not included in the award. We still wanted to get that main replaced ahead of the 19 project, so we had Great West design a few different open cut alternatives to get pricing on. This redesign work amounted to $3,673.00 that was not part of the original scope of work. Additionally, during the course of construction a significantly higher number of service line connections required excavation for reinstatement than was expected due to infiltration. Connections that appear to be sound are reinstated remotely by cutting from inside the main with no excavation required. Only problem services were planned to be excavated and repaired with new fittings. In this case, we found many services that appeared to be sound, but leaked after cutting out and subsequently required excavation for complete repair. The additional excavation is a much more time consuming process, and as a result the increased numbers caused the project to go through a winter shut down and take much longer to complete than anticipated. The extra inspection time amounted to $22,000.00 that was not included in the original PSA. FISCAL EFFECTS: The project was originally budgeted at $750,000, while the construction award and engineering totaled $606,945.00. With this amendment, the total will now be $632,618.00 ALTERNATIVES: As suggested by the City Commission. Attachments: Amendment No. 1 Report compiled on: 12/9/09 AMENDMENT NO.2 TO PROFESSIONAL SERVICES AGREEMENT FOR GREAT WEST ENGINEERING THIS AGREEMENT is made as of this I' L day of 2009, between THE CITY OF BOZEMAN, Municipal Corporation, Bozeman, Montana, herein referred to as OWNER and GREAT WEST ENGINEERING, INC, an Engineering Consulting Firm of Helena, Montana, herein referred to as ENGINEER. WHEREAS, the parties have entered into a Professional Services Agreement dated April 21, 2008, herein referred to as Original Agreement for professional engineering services; and WHEREAS, the parties desire to further amend the provisions of this Agreement. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: Revise Paragraph 1.1 as follows: 1.1 The detailed description of the specific project components is described as follows: The project consists of pipe bursting and designing two open cut options for sewer main replacement for approximately 1,400 lineal feet of existing 8 inch pipe to 15 inch pipe in Lincoln Street. The project also includes approximately 16,000 lineal feet of CIPP pipe replacement in the R2 project area and the alley between Bogert Place and Story from Church to the end (E0515- 130516). Consideration will be given to pipe bursting the 6 inch pipe in the R2 area to 8 inch pipe. Revise Paragraph 6.l .1 as follows: 6. 1.1 Payment. The OWNER shall pay for design phase services performed as Basic Engineering Services under sections 4.1 through 4.3 of this agreement a total lump sum in the amount of $97,153 for such services. Revise Paragraph 6.2.1. as follows: 6.2.1 The OWNER shall pay for Bidding or Negotiating Phase under section 4.4 an amount not to exceed $5,550 and Construction Phase and Project Documentation Services under sections 4.5 through 4.6 an amount not to exceed $94,675, except as provided under 6.2.1.2 and 6.2.4. Revise the following Engineering Fee Estimate Worksheets, attached to this Amendment, to EXHIBIT C: 4.5.1 General Administration of the Construction Contract 4.5.2 Resident Project Representative Except as specifically amended herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. IN WITNESS WHEREOF, the parties hereto do make and execute this Agreement on the day and year first above written. CITY OFBOZEMAN GREAT WEST ENGINEERING, INC. By: J+vV•+q By: Daniel M. McCauley, PE President A,TTI�s$ D ATTEST l By: C�y•Clerk= APPRO T 7� FORM B ity Attorney