Loading...
HomeMy WebLinkAboutResolution 4197A, Modification of Contract with BN Builders for Bozeman Landfill Addition S COMMISSION RESOLUTION NO. 4197A A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH BN BUILDERS, INC., BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 27th day of May 2009, authorize award of the bid for the Construction of the Bozeman Landfill Addition to BN Builders, Inc., Bozeman, Montana; and WHEREAS, Section 7 -5 -4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and /or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and /or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and /or alterations to the contract between the City of Bozeman, a municipal corporation, and BN Builders, Inc., Bozeman, Montana, as contained in Change Order #1 and Change Order #2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 31 st day of August, 2009. KAAREN JAC SON, Ma or Page 1 of 2 STAC EN, M City Cler APPROVED AS TO FORM: ULLIVAN Attorney Page 2 of 2 dowling I sandholm l architects CHANGE ORDER C.O. #1 Project: Bozeman Landfill Addition Date: August 18, 2009 Owner Great Northern Town Center Architect Helena, MT 59601 Architect's Project No: 08 -263 Contractor Field To Contractor: BN Builders, Inc Contract Date: June 1, 2009 Other 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Contract For: General Construction The Contract is changed as follows: Decrease Contract Sum. Reason for change: Owner requested change of outlets to accommodate charging equipment (CP# 5001) Contractor recommendation and Owner request for alternate sidewalk configuration (CP# 5003) Contractor recommendation for additional water protection at roof (CP# 5004) Contractor recommendation for cabinet substitution to save cost (CP# 5009) Attachment(s): CP# 5001 CP# 5003 CP# 5004 CP# 5009 Contract Sum Adjustment: The original Contract Sum was 271,648.00 The net change by previously authorized Change Orders <0> The Contract Sum prior to this Change Order was 271,648.00 The Contract Sum will be decreased by this Change Order by the amount of 186.05 The new Contract Sum including this Change Order will be 271,461.95 Contract Time Adiustment: The Contract Time will be increased by zero Q days. The date of Substantial Completion as of the date of this Change Order therefore is: September 28, 2009 Not valid until signed by Architect, Contractor, and Owner. Signatures: Architect: Dowling Sandholm Architects By: /L'- Date: 6121 15 West 14 Street Suite 103 Mike Wiseman Helena, Mt 59601 Contractor: BN Builders, Inc By: Date: B_ Z, -'d 2066 Stadium Dr., Ste 102 Jay Bozeman, MT 59715 Owner: City of Bozeman By: Date P.O. Box 1230 Chris Kukulski Bozeman, MT 59771 i B'N B BNBuilders, Inc. Tuesday, August 4, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal CP# 5001 City of Bozeman Landfill Add, 509004 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 5001 Description: Change to Quad Receptacles Proposed Amt: 45.58 Days Requested: 0 days Scope of Work (see attached for detailed cost summary): Change duplex receptacles to quad receptacles, one location in each office. [Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the price for this work. Additional costs may apply if authorization is received after E) BNBullders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work. BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Submitted by: Accepted by: Date: 6 456o Iay Mike Wiseman BNBuilders, Inc Dowling Sandho/m Architects II CHANGE PROPOSAL DETAIL BACKUP Project 509004 CP 5001 City of Bozeman Land B N B 2143 Story Mill Road fl{ Add. V Bozeman, M7 59715 BNBullders, Inc. Phone: 206-382 -3443 Fax: 206 382 -3440 Contractor Description Amount Electrical 43.00 131\113uilders Inc. Overhead Profit $0.00 BNBuilders, Inc. OH Profit on Subcontractors $2.58 Total; $45.58 LRN ���L MATZINGER ELECTRIC, INC. 907 Bridger Drive Bozeman, MT 59715 Phone: (406) 587 -7290 Fax: (406) 587 -7298 Proposal 6/10/2009 TO: BNBuilders Gaines Hall Bldg. on 11th and Grant St Room #108 Bozeman, MT 59715 JOB: City Landfill Shops Project: Change duplex receptacles to quad receptacles Change Order Number: 1000014353 WORK DESCRIPTION: Add one receptacle to one location in each office. The total amount of this Proposal is: $43.00. incerely, Jeff tzi Ma in er lectrie I i' 6/90/2009 11:37:18 AM CITY LANDFILL SHOPS Change duplex receptacles to quad receptacles Page 1 Totals (Detailed) Bid Summary: Default i Job Number r 1 000014353,.;. 7 i rr r Bid Date 4/2912009 s Btd Time 8 AM q ;w I. S ware Foota ge D 0 1 I b v L'sien Material Totals T o� E' d d O Raceway Flgs &jBoxe I 05 Wiring Devices Covers 666 000% 6 66 Total $5.31 Sales Tax (0.00 $0.00 Total Material s an Labor Hours 31 i Y 1 vi i s. nF ti S 0`abt �ti 01'Racewa 7 F s r &aBo 1.r x r r• v f 05 Wiring Devices Covers ti 1+ YO DD Q Oar C 'C 1M k t d 0tD0 a i d cl 77 l I Ct IT j t t rOt r 0 00 r D 75 0. Total I...' 5 ,i1 7 In y 0.7 pir k. �`.�,s'l... ryt SY l tit 8t�' ('L 0► W y 7 Cate ae� Cat o° of Total ti s y i i it cd C Hours 6 e a urden n° +r Burd x� {1 t+ -"Q E dad x �i 11't i td• I 1 I •3..aftS�i tlf tafi.:nh' '1ti2 S rY r r Journeyman 100-000 l a1 ys5 „t A 0.750 $49.60 D QD 1 X31 y t mvpltS t,. N i q mf R D 000 $37 12 tit 'C �'v ld t I+SlA:4t�'3 i�` <<�h� Total 100, 000 0.750 x $49-5.0 (average of labor rate w /burden) M'i .v5k $37 S S I t ktJr +mtc` i '•:Lea3,' pjo ftrtve -a ,�P D@SCltDtibn t s.,,.1w....., 1 Hours to ctor ded I i TotalY(Labar 0 00 u t1 i' S !u U r 5f 1 t+ `+1 �P 1�1 i'Y'♦.'f 't G�11 ++r• 'l w t'637 2 JDbr�SUb[ptall�P, �OSFt) 5 i $42 4 {I�4i0}:.. �vprhea�d, 1 r I X71 Ill n} t LLi4.vvk r, t isr ifs Sit, l 1, rr ,1 r t II1 iln i h'9�7 1t+1! r I -i t ,i •.!1 t t..:. l,l S, r., 7 +lia+; p5. 1 ,S 't.'sS I 1 I +i anti l4 r .7 Quoted Material (5.000 Dire`I t Lib (0 000 t $0,00 .0 c1. a 1 .'.f.,.`. ir�i:r:.t;��1 'y�ly #`:!S ikTti r1•.. 41 r r Non Productive Labor (0. 000%) I'9' i�J 1 ,'i�'ri'V,r lnry.,:n: il' n y $0.00 i�V1>;1uRSryi,.�,�5 1i C e ?.79t't ?s,�t� ��r 'Y., til ;11�:Qita'D' Tools and Misc. Materials (5 000 /o $0.00 4. 4, ;r t ,'i.,;.f ,if kt `(..,1 1 a. q '11rS t C.. ll Oi+erhear� �0.6rq /Q2. $n40D a ,;:4 •r r rC i Ic. ;P�; +.t ,r,,,± x.0'2• 611012()09 11:37:18 AM CITY LANDFILL SHOPS Change duplex receptacles to quad receptacles Page 2 Totals (Detailed) Bid Summary: Default I 1 Profit Non Quoted Material (5.000 S s uoked`Materlal t]rrect or (D, 000%) $0.28 NonuPraductivetLabpr (O 000 en $0.00 Job Expses (5.000 r 5 T,00 s at�d�Mfsc� „Materials (5 OD0; %a) Subcontracts (5.000 r s :r $0.00 Profit (0.65%) $0,00 u, Job Total 0.28 $42.98 M'ctuaj?Bid Price Mt�ria'11to Dlre�c Lab r ratio $43'0 A Q13 Prime Cost per square foot Jop Total (fie i Chsquare foot'. Actual Bid Price per square ft $0 00 1 b o6 �abpY$cQtst'p) rust)uare foot $0.00 ours per square foot 4 Labor h $0.00 f B N B BNBuilders, Inc. Tuesday, August 4, 2009 Mike Wiseman Cowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal CP# 5003 City of Bozeman Landfill Add. 509004 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 5003 Description: Additional Curb, Gutter Sidewalk Proposed Amt: 322.77 Days Requested: 0 days Scone of Work (see attached for detailed cost summary): Provide labor, equipment materials to install an additional 12LF of Curb /Gutter and 25SF of 4" Concrete Sidewalk. It was determined in the field that this proposed change will provide a more even and efficient path of travel from the garage area to the parking area along with presenting a slightly more aesthetic sidewalk. Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the price for this work. Additional costs may apply if authorization is received after BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work. BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. I Submitted by: Accepted by: Date: 41-� R-4-o'? ScattJay Mike Wiseman BNBuilders, Inc bowling Sandholm Architects CHANGE PROPOSAL DETAIL BACKUP ACKUP Project 509004 CP 5003 City of Bozeman Land B N B 2143 Story Mill Road Fill Add. Bozeman, MT 59715 BNBuilders, Inc. Phone: 206 382 -3443 Fax: 206- 382 -3440 Contractor Descri tion Amount Earthwork 304.50 BNBuilders Tnc: Overhead Profit BNBuilders, Inc. OH Profit on Subcontractors $18.27 Total: $522.77 I i 4 OFFICE 0S. PAX 4C76.582.9B41 406.582.9B43 simeconstfLa mantana.COm MAILI ADDRESS SMEET ADDRESS gp a 7720A 5hedhorn 140 BazemaIi, MT 59719 19D Remshorn Drive Bozeman, MT 59718 kl.� F1`061a p UCTOO N July 29, 2009 BNBuilders, Inc. 293 Rodeo Drive Suite 42 Florence, Montana 59833 Re: Bozeman. Landfill Additional Work. Dear Scott, As per our conversation 1 am providing pricing for the following. additional work: 12 LF Curb and Gutter 192.00 4 3OW.6 25 SF 4" Concrete Sidewallc 1.12.50 -R-ebw Total --5e- After reviewing.the project plans and our proposal. In our proposal it clearly states the item that were .included in the proposal for the additive .alternate. Additionally:if you look at sheet 5=1, figurel, it clearly shows.that the concrete apron and stoop-are outside the extent of additive alternate 01. I also want to .bring to your attention that additional work will be required on the north end of the new addition that is not shown on sheets A 2 -1 and A 2 -2. This work will include additional asphalt removal, gravel added for grade changes and additional pavement to be placed. We will price this additional work when it is the extent of work of the additional work is determined. In our proposal we priced the asphalt as a three-inch thick section, Since we are placing a four -:inch thick section on this project, we are requesting additional compensation for the increased asphalt quantity (approximately 50 ton). An alternative is to have the pavement section reduced to a 3" section, which is a more common thickness for parking areas. If there are -any questions please feel free to contact me at (406).592 -9841. Sincerely, Jeffrey T..Milesnick Sime Construction, Inc. J. L k 1 i i l B N B BNBuilders, Inc. Tuesday, August 4, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RP: Change Proposal CP# 5004 City of Bozeman Landfill Add. 509004 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 5004 Description: Additional Ice /Water Shield at Roof Proposed Amt: 789.60 Days Requested: 0 days Scone of Work (see attached for detailed cost summary): After review in the held, it was determined that-there may be a high probability of ice dams forming around the roof eves along with the seam at the parapet and roof joint. This proposal is to provide labor, equipment material to install (1) row of ice and water shield at the parapet /roof seam and (2) rows of ice and water shield at roof eves. e please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the price for this work, Additional costs may apply if authorization is received after BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work. BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Sub itted by: Accepted by: Date: Scott�7ay Mike Wiseman BNBuilders, Inc Dowling Sandholm Architects CHANGE PROPOSAL DETAIL BACKUP Project 509004 CP 5004 B N B City of Bozeman Landfill Add. 2143 Story Mill Road Bozeman, MT 59715 ON Builders, Inc. Phone: 206.382 -3443 Fax: 206- 362 -3440 Contractor Descriotion Amount Vapor Retarders $525.00 4 Man Hours $160.00 BNBuiiders Inc. Overhead Profit $84.60 i BNBuilders, Inc. OH Profit on Subcontractors $0.02 Total: $789.60 B N B BNBuilders, Inc. Tuesday, August 18, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal CP# 5009 City of Bozeman Landfill Add. 509004 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 5009 Description. Cabinetry Change Proposed Amt: $(1,344..00) Days Requested: 0 days Scope of Work (see attached for detailed cost summary): The specifications call for a laminate -faced residential cabinet. The attached credit is to provide Golden Oak, in lieu of the specified laminate- faced. Please sign below and return a copy ol"this letter to indicate your acceptance of this extra work and approve the price for this work., Additional costs may apply If authorization is received after BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work. BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Sub N A�__3 Accepted by: Date: Scott Jay Mike Wiseman BNBuilders, Inc Dowling Sandholm Architects CHANGE PROPOSAL DETAIL BACKUP Project 509004 CP 5009 City of Bozeman B N B 2143 Story Mill Road Landfill Add. Bozeman, MT 59715 9N8uilders, Inc. Phone: 206- 382 -3443 F 2 06 -3440 Contractor Description Amount Golden Oak Cabinets in lieu of Specified $(1,200.00 BNBuilders Inc. Overhead Profit 144,00 BNBuilders, Inc. OH Profit on Subcontractors $0,00 Total: $(1,344.00) Bowling I sandholm f architects CHANGE ORDER C.O. #2 Project: Bozeman Landfill Addition Date: August 18, 2009 Owner Great Northern Town Center Architect Helena, MT 59601 Architect's Project No: 08 -263 Contractor Field To Contractor: BN Builders, Inc Contract Date: June 1, 2009 Other 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Contract For: General Construction The Contract is changed as follows: This is a modification to the contract to increase the scope of work to include fire protection of spray insulation in the existing vehicle storage space. This change is funded by an increase to the project budget from the Solid Waste Division enterprise fund Reason for change: Direction from building department to fire protect exposed spray foam insulation in existing garage prior to issuing Certificate of Occupancy (CP# 5006) Direction from building department to add fire rated construction between new garage and existing garage (CP# 5007) Additional work to remove existing plywood siding in preparation for spray foam insulation protection (CP# 5010) Attachment(s): CP# 5006 CP# 5007 CP# 5010 Contract Sum Adjustment: The original Contract Sum was 271.648.00 The net change by previously authorized Change Orders 186.05 The Contract Sum prior to this Change Order was 271,461.95 The Contract Sum will be increased by this Change Order by the amount of 29,799.02 The new Contract Sum including this Change Order will be 301.260.97 Contract Time Adiustment: The Contract Time will be increased by zero 0 days. The date of Substantial Completion as of the date of this Change Order therefore is: September 28, 2009 Not valid until signed by Architect, Contractor, and Owner. Signatures: Architect: Dowling Sandholm Architects By: Date; 15 West 14 Street Suite 103 3 Miki seman Helena, Mt 59601 Contractor: BN Builders, Inc By: Date: 6 •Z 57 o 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Owner: City of Bozeman BYC Date "7—' 09 P.O. Box 1230 Chris Kukulski Bozeman, MT 59771 B N B BNBuilders, Inc. Thursday, August 20, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal CP# 5010 City of Bozeman landfill Add. 509004 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 5010 Description: Removal/ Reinstall Existing Shop Plywood /Shelving Proposed Amt: 5,040.00 Days Requested: 0 days Scope of Work (see attached for detailed cost summary): Provide labor, equipment material to remove and reinstall existing plywood and fixed shelving at the Bozeman Landfill existing shop. This price does not include handling of landfill personnel tools, equipment, etc. Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the price for this work, Additional costs may apply if authorization is received after BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work, BNBullders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Sub ed by: Accepted by: Date: .p Scott Jay Mike Wiseman BNRuilders, Inc Dowling Sandholm Architects 4 CHANCE PROPOSAL DETAIL BACKUP I Project 509004 GP solo City of Bozeman Land B N B 2143 Story Mill Road fill Add, Bozeman, MT 59715 BNBuilders, Inc. Phone: 206 -382 -3443 Fax: 206- 382 -3440 Contractor Description Amount 80 Man Hours 45 /hr $3,600.00 Equipment and Tools $600.00 All Materials $300.00 BNBuilders Inc. rOH rhead Profit $540.00 BNBuilders, Inc. P rofit on Subcontractors $0.00 Total: $5,040.00 dowling I sandholm architects CHANGE ORDER C.O. #2 Project: Bozeman Landfill Addition Date: August 18, 2009 Owner Great Northern Town Center Architect Helena, MT 59601 Architect's Project No: 08 -263 Contractor Field To Contractor: BN Builders, Inc Contract Date: June 1, 2009 Other 2066 Stadium Dr., Ste 102 Bozeman, MT 59715 Contract For: General Construction The Contract is changed as follows: Increase Contract Sum. Reason for change: Direction from building department to fire protect exposed spray foam insulation in existing garage prior to issuing Certificate of Occupancy (CP# 5006) Direction from building department to add fire rated construction between new garage and existing garage (CP# 5007) Attachment(s): CP# 5006 CP# 5007 Contract Sum Adiustment: The original Contract Sum was 271,648.00_ The net change by previously authorized Change Orders 186.05 The Contract Sum prior to this Change Order was 271,461.95 The Contract Sum will be increased by this Change Order by the amount of 24,759.02 The new Contract Sum including this Change Order will be 296,220.97 Contract Time Adjustment: The Contract Time will be increased by zero 0 days. The date of Substantial Completion as of the date of this Change Order therefore is: September 28, 2009 Not valid until signed by Architect, Contractor, and Owner. Signatures: Architect: Dowling Sandholm Architects By: Date: 15 West 14` Street Suite 103 Mike Wiseman Helena, Mt 59601 Contractor: BN Builders, Inc By: Date: 2066 Stadium Dr., Ste 102 Scott Jay Bozeman, MT 59715 Owner: City of Bozeman By: Date: P.O. Box 1230 James Goehrung Bozeman, MT 59771 B N B BNBuilders, Inc. Tuesday, August 4, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal CP# 5006 City of Bozeman Landfill Add. S09004 Dear Mike Wiseman, This letter Is to request authorization to proceed with the following extra work: CP Number: 5006 Description: Fire Spray Installation at Remaining Shop (Excludes Shop West Wail) Proposed Amt: 21,067.50 Days Requested: 0 days Scgpe f+ f Work (see attached for detailed cost summary): Provide labor, equipment materials for Fire spray installation on all other areas of existing shop using factory recommended application with NYPS 1500 foam barrier. Price excludes furnish install of any wood protection boards. Price also excludes removal and replacement of existing shop shelving and equipment. Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the I price for this work. Addttional costs may apply if authorization is received after. BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the final price for this work, BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. i Submitted by: Accepted by: Date: i�—� ..y. J// Scott Jay Mike Wiseman BNBuilders, Inc Dowling Sandholm Architecty i I i I CHANGE PROPOSAL DETAIL BACKUP Project $09004 CP 5006 City of Bozeman B N B 2143 Story Mill Road Landfill Add. Bozeman, MT 59715 BNBuilders, Inc. Phone: 206- 382 -3443 Fax: 206 -382 -3440 Contractor tr ctor Description Amount Fire Sprav Furnish Install 19 875.00 BNBuilders Inc. Overhead Profit $0.00 BNBuilders, Inc, OH Profit on Subcontractors $1,192.50 Total: $21,067.50 I I P- O 'B OX 1 '1 012.3 BOZEM AN, M7:55715 PHONE /fiAX: 5$6 -8484 580 -5,271 WWW- PEAKPAI NTI N G h?T.COM JAM:ESCPF!.EAKPAI NTI NGMT.Com NMI rY I r a n� in s n ti+ D �Goaiing oS i.ttsulntivn•ott tac at wplJ:attatched;to additiof, using:lirptar °iccpt)tntendatl ta�p]icurinn With NYPS V- 500fbum'hurriar �Cnaur}e o1'attsulaLnn c,n a]I otilr uet4, in shnp not alversd: ihe.urc ris.listed..atbaae nsin_ c ItuLtorS r�v�mm4ndulttrpplluation wrtkt MrFS 1.5()(l fnara burr]ctr I hung: shcr t- ror:}� on westwall attetehed,taaddilion Tp"�;�v�L� J'�W�i":ytt�5�"i1 .Q!'/ t .:�Jit�lk"� "Nu r d k t Fi IIN B N B BNBuilders, Inc. Wednesday, August 12, 2009 Mike Wiseman Dowling Sandholm Architects 55 West 14th Street Helena, MT 59601 RE: Change Proposal CP# 5007 City of Bozeman Landfill Add. S09004 Dear Mike Wiseman, This letter is to request authorization to proceed with the following extra work: CP Number: 5007 Description: Fire Rated Wall: Between New Existing Shop (Framing Drywall) Proposed Amt: 3,691.52 Days Requested: 0 days Scone of Work (see attached for detailed cost summary): Provide labor, equipment materials to install framing drywall at the west wall of existing landfill shop. Price excludes removal and reinstallation of existing shop shelving and equipment currently placed along the west wall. Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the T� price for this work. Additional costs may apply if authorization is received after. BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents the Final price for this work. BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction. This change proposal represents the final price for this work. Sub ed by: Accepted by: Date: Scott -Yay U d Mike Wiseman BNBuilders, .Inc Dowling Sandholm Architects CHANGE PROPOSAL DETAIL BACKUP Project 509004 CP #5007 B N B City of Bozeman Landfill Add. 2143 Story Mill Road Bozeman, MT 59715 BNBuilders, Inc. Phone: 206 -382 -3443 Fax: 206 -382 -3440 Contractor Descrivtion Amount Superintendent $2,160.00 All Materials $726.00 Equipment and Tools 410.00 BNBuilders Inc. Overhead Profit $395.52 BNBuilders, Inc. ON Profit on Subcontractors $0.00 Total: $3,691.52 dowling I sandholm I architects Meld Report Project: Bozeman Landfill Addition, #08 -263 Date: 6 /p f dq Weather: Present at Site: The following was noted: Signed: cc: 55 West 14"' Street Suite 103 Helena, MT 59601 2054 Stadium Drive Suite C Bozeman, MT 59715 406 -457 -5470 ph 406 495.0063 fax 406 -556 -0113 ph 406 -556 -0114 fax www.dowlingsandholm.com dowling I sandholm I architects Field Report Project: Bozeman Landfill Addition, #08 -263 Date: Weather: Present at Site: The following was noted: Signed: cc: 55 West 14 Street Suite 103 Helena, MT 59601 2054 Stadium Drive Suite C Bozeman, MT 59715 406 457 -5470 ph 406 495 -0063 fax 406 556 -0113 ph 406 556 -0114 fax www.dowlingsandholm.com