HomeMy WebLinkAboutDRAFT Street Impact Fee CIP Project Name: Right of Way Acquisition (on-going) Estimated Cost: $100,000 each year Street Impact Fees – SIF FY11 – Project Number: Date 01Scheduled: FY15 Purpose: New Replacement Facility Equipment Project Annual allocation available for right-of-way purchases as they become available. Purchasing additional right-of-way is critical to expanding the Description: capacity of streets in the city. This is deemed to be 100% impact fee eligible – as additional right-of-way is not required if we are not expanding the capacity of the street. Alternatives 1. Condemn property for right-of-way; pay court costs as well as appraised value of property. Time consuming for city staff and a relatively Considered: expensive process. 2. Wait for land to develop and acquire additional right-of-way through annexation or subdivision. Advantages of Provides dollars for the purchase of necessary right-of-way as it becomes available on the market. Avoids the expensive, antagonistic Approving this condemnation process where possible. Project: Estimated New Annual Operating & Maintenance Costs: Street Impact Fees can not be spent on operating and maintaining facilities. There is expected to be a Future Recurring very minimal, incremental cost to the Street Maintenance District from this Costs: expenditure. Funding 100% Street Impact Fees Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: TH Baxter (19 to Cottonwood) Estimated Cost: Total Project: $3,350,000; $2,000,000 from Street Impact Fees Street Impact Fees –Design – FY12 Project Number: Date Const. – FY13 SIF 02 Scheduled: Purpose: New Replacement Facility Equipment th Project Reconstruct Baxter Lane (from 19 Avenue to Cottonwood) to a Minor Arterial standard as shown in the Transportation Plan. Description: Continued development in the northwest quadrant of the City insures that this improvement will be needed in the not too distant future. It is estimated that approximately 60% of this project will be eligible for impact fees. The remainder of project costs would need to come from Special Improvement District assessments on property in the area. Construction is expected to occur in FY12. Alternatives Full payment by SID, or developer constructed. Considered: Advantages of Improved capacity and safety in this corridor; Approving this Project: Estimated New Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate Future Recurring of $8,725 per street mile maintained annually. Costs: Funding 60% - Street Impact Fees = $2,000,000 40% - Special Improvement District (SID) or Other = $1,350,000 Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: Church Estimated Cost: Total Project: $9,600,000; Street Impact Fees $5,800,000 Street Impact Fees –Unscheduled Project Number: Date SIF 04 Scheduled: Purpose: New Replacement Facility Equipment Project Reconstruct ChurchAvenueto the collector standard identified in the Transportation plan from Main Street to Kagy Boulevard. Description: The need for this project comes from increased traffic due to growth in the South Bozeman area as well as the county area south of Bozeman– making this project eligible for impact fee funds. While this improvement is identified in the transportation plan as recommended major improvement 26, Right-of-Way issues will likely make this one of the most difficult and expensive street projects in the City’s future. Church is designated an Urban Route, and would be eligible for the expenditure of Urban Funds. Alternatives Use of Urban Funds, or creation of an SID for full financing. Considered: Advantages of Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians. The use of street impact fee funds enables the Approving this community to leverage the available State Urban transportation funds to Project: complete other projects and address more of the city’s pressing transportation needs. Estimated New Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate Future of $8,725 per street mile maintained annually. Recurring Costs: Funding 60% - Street Impact Fees = $5,800,000 40% - Urban Funds, SID, or other sources = $3,800,000 Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: thth College (8 to 19) Estimated Cost: Total Project: $3,350,000; Street Impact Fees $2,000,000 Street Impact Fees –Unscheduled Project Number: Date SIF 05 Scheduled: Purpose: New Replacement Facility Equipment thth Project Reconstruct West College Street (from 8 Avenue to 19 Avenue) to a minor arterial standard as shown in the Transportation Plan. Description: This section of West College has already exceeded the volume of traffic it was projected to carry in 2020 according to the Transportation Plan. th Planned improvements to South 19 and increased development in the th South 19 corridor will only further increase traffic demand on this facility. Additionally this facility lacks pedestrian and bicycle facilities. Alternatives Use of Urban funds for full financing, CTEP grants if available. Considered: Advantages of Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians. Approving this Project: The use of street impact fee funds enables the community to leverage the available State Urban transportation funds to complete other projects and address more of the city’s pressing transportation needs. Estimated New Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate Future of $8,725 per street mile maintained annually. Recurring Costs: Funding 60% - Street Impact Fees = $2,000,000 40% - State Urban Funds = $1,350,000 Sources: Photo #1 City of Bozeman Capital Improvements Plan FY11-15 Project Name: th College (Main to 19) Estimated Cost: Total Project: $6,160,000; Street Impact Fees $3,696,000 Street Impact Fees –FY13 - FY15 Project Number: Date SIF 06 Scheduled: Purpose: New Replacement Facility Equipment th Project Reconstruct West College Street from Main Street (Huffine Lane) to 19 Avenue to a principal arterial standard as shown in the Transportation Description: Plan. This section of West College has already exceeded the volume of traffic it was projected to carry in 2010 according to the Transportation th Plan. In the peak AM hour traffic is backed up from 19 to Huffine and beyond. th Planned improvements to South 19 and increased development in the Huffine Lane corridor will only further increase traffic demand on this facility. In addition this facility lacks pedestrian and bicycle facilities. Alternatives Use of Urban funds for full financing, CTEP grants if available. Considered: Advantages of Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians. Approving this Project: The use of street impact fee funds enables the community to leverage the available State Urban transportation funds to complete other projects and address more of the city’s pressing transportation needs. Estimated New Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate Future Recurring of $8,725 per street mile maintained annually. Costs: Funding 60% - Street Impact Fees = $3,696,000 40% - State Urban Funds = $2,464,000 Sources: Photo #1 City of Bozeman Capital Improvements Plan FY11-15 Project Name: Durston (Fowler to Cottonwood) Estimated Cost: Total Project: $5,500,000; Street Impact Fees $3,300,000 Street Impact Fees –FY11 & FY12 Project Number: Date SIF 08 Scheduled: Purpose: New Replacement Facility Equipment Project While this section of Durston Road was not anticipated in the 1993 Transportation Plan to carry significant traffic volumes, it is apparent from Description: recent development activity that the areas served by this collector roadway may cause the predicted volumes to be exceeded. Incremental improvement of Durston Road with development projects may be possible, thus preventing a severe drop in service level similar to that experienced on West Babcock Street. Alternatives SID for full financing, or incremental construction by developers. Considered: Advantages of Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians. Approving this Project: The use of street impact fee funds enables the community to leverage the available State Urban transportation funds to complete other projects and address more of the city’s pressing transportation needs. Estimated New Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate Future Recurring of $8,725 per street mile maintained annually. Costs: Funding 60% - Street Impact Fees = $3,300,000 40% - Special Improvement District = $2,200,000 Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: th Kagy (Willson to 19) Estimated Cost: Total Project: $6,650,000; Street Impact Fees $4,000,000 Street Impact Fees – SIF Unscheduled Project Number: Date 09Scheduled: Purpose: New Replacement Facility Equipment Project Widen Kagy Boulevard and add turning lanes at key intersections. This portion of Kagy currently carries about 9,000 vehicles per day. Description: The capacity this two lane street can reasonably carry is about 12,000 vehicles per day. Expansion of capacity will be needed in the foreseeable future to handle current and future traffic loads. Kagy serves as an important element of Bozeman's perimeter street system connecting Highland Blvd., Willson Ave. and S.19th. It also serves as the primary access to Montana State University and the University's major athletic facilities. Alternatives Pursue the use of Urban Funds. Considered: Advantages of Kagy is a State Urban Route and is eligible for expenditure of State urban funds designated annually for the City of Bozeman; however, the Approving this availability of urban funds cannot match the pace of the City's Project: transportation improvement needs. The need for this project comes from increased traffic due to growth in the Bozeman area and the project is eligible for Impact Fee Funds. Use of Street Impact Funds enables the community to leverage the available State Urban transportation funds to complete projects and address more of its pressing transportation needs. Estimated New Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate Future of $8,725 per street mile maintained annually. Recurring Costs: Funding 60% - Street Impact Fees = $4,000,000 40% - State Urban Funds = $2,650,000 Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: Oak (Cedar to Main) Estimated Cost: Total Project: UNKNOWN Street Impact Fees –Unscheduled Project Number: Date SIF 10 Scheduled: Purpose: New Replacement Facility Equipment Project Construct OakStreet from Rouse to Cedar to a collector standard as identified in the Transportation Plan. Description: This would make development of an important and underutilized portion of the City possible, including reclamation of what was a superfund site (Idaho Pole). Because of the complicated right-of-way, superfund, and wetland issues, it is very difficult to estimate the costs of this project. It is included in this schedule with costs “Unknown” because it has been identified as a project that could significantly improve travel, if it could be built. Alternatives SID or Developer Contributions for full construction. Considered: Advantages of The need for this project comes from increased traffic due to growth in the Bozeman area and the project is eligible for Impact Fee Funds. Approving this Project: Use of Street Impact Funds enables the community to leverage the available State Urban transportation funds to complete projects and address more of its pressing transportation needs. Estimated New Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate Future of $8,725 per street mile maintained annually. Recurring Costs: Funding Given the fact that this portion of street does not currently exist, the project will likely be eligible for Street Impact Fees. However, given the scope of Sources: the project, costs are unknown. City of Bozeman Capital Improvements Plan FY11-15 City of Bozeman Capital Improvements Plan FY11-15 Project Name: Oak (Rouse to Cedar) Estimated Cost: Total Project: $8,900,000; Street Impact Fees $5,340,000 Street Impact Fees –Unscheduled Project Number: Date SIF 11 Scheduled: Purpose: New Replacement Facility Equipment Project Construct OakStreet from Rouse to Cedar to a collector standard as identified in the Transportation Plan. Description: This would make development of an important and underutilized portion of the City possible, including reclamation of what was a superfund site (Idaho Pole). Alternatives SID or Developer Contributions for full construction. Considered: Advantages of Kagy is a State Urban Route and is eligible for expenditure of State urban funds designated annually for the City of Bozeman; however, the Approving this availability of urban funds cannot match the pace of the City's Project: transportation improvement needs. The need for this project comes from increased traffic due to growth in the Bozeman area and the project is eligible for Impact Fee Funds. Use of Street Impact Funds enables the community to leverage the available State Urban transportation funds to complete projects and address more of its pressing transportation needs. Estimated New Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate Future Recurring of $8,725 per street mile maintained annually. Costs: Funding 60% - Street Impact Fees = $5,340,000 40% - Other Sources (Developer Contribution, SID, TIF) = $3,560,000 Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: th Intersection Control: 27 & Oak Estimated Cost: $500,000 Street Impact Fees –Unscheduled Project Number: Date SIF 19 Scheduled: Purpose: New Replacement Facility Equipment th Project Control of the intersection of 27 Avenue and Oak Street, a collector and an arterial. Recent development proposals indicate that the need for this Description: improvement will soon be warranted. If a signal is chosen, there may be someemergency maintenance/repair events should the signal fail per an existing agreement with MDT, but in general this will be an MDT maintained signal. . Alternatives Do nothing or consider other alternatives as suggested by the Montana Department of Transportation. Create an SID or identify and apply for other Considered: potential sources of funding (CMAQ…) Advantages of Improved traffic flow and safety at this intersection. Approving this Project: Estimated New Annual Operating Costs: Future Annual Maintenance Costs: Recurring Costs: Other Non-Capital Costs: Total: none Funding 100% Street Impact Fees Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: th Intersection Control: 7 & Kagy Estimated Cost: $540,000 Street Impact Fees –FY13 Project Number: Date SIF 20 Scheduled: Purpose: New Replacement Facility Equipment th Project Control of the intersection of 7 Avenue and Kagy, a collector and an arterial. Recent development proposals indicate that the need for this Description: improvement will soon be warranted. If a signal is chosen, there may be someemergency maintenance/repair events should the signal fail per an existing agreement with MDT, but in general this will be an MDT maintained signal. Alternatives Do nothing or consider other alternatives as suggested by the Montana Department of Transportation. Create an SID or identify and apply for Considered: other potential sources of funding (CMAQ…) Advantages of Improved traffic flow and safety at this intersection. Approving this Project: Estimated New Annual Operating Costs: Future Recurring Annual Maintenance Costs: Costs: Other Non-Capital Costs: Total: none Funding 100% Street Impact Fees Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: Graf Street Extension/Connection Estimated Cost: $1,000,000 Street Impact Fees –Unscheduled Project Number: Date SIF 21 Scheduled: Purpose: New Replacement Facility Equipment Project This project is to extend Graf Street approximately ¼ mile in order to th connect the street to allow through traffic to flow east from 19 Avenue. Description: This is an important connection for public safety purposes – allowing fire service to meet their response time requirements in areas where they currently cannot. Alternatives Do nothing and wait for development to connect the street. Considered: Advantages of Improved traffic flow and better emergency response to the local area. Approving this Project: Estimated New Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost estimate Future of $8,725 per street mile maintained annually. Recurring Costs: Funding 100% Street Impact Fee – to be recovered by developer payback. Sources: City of Bozeman Capital Improvements Plan FY11-15 Project Name: Intersection Control: West College Street /8th Avenue Intersection Improvements Estimated Cost: $500,000 Street Impact Fees –FY12 Project Number: Date SIF 22 Scheduled: Purpose: New Replacement Facility Equipment Project Install improved control (roundabout or signal) at the intersection of West College Street and 8th Avenue, a minor arterial and a collector. This Description: intersection has seen steadily increasing demand with the growth of MSU. The Draft 2007 Transportation Plan Update indicates that LOS issues are beginning to appear at this intersection. If a signal is chosen as the improvement, there may be some emergency maintenance/repair events should it fail per an existing agreement with MDT, but in general this would be an MDT maintained signal. This intersection improvement project will be identified as TSM 18 in the 2007 Greater Bozeman Area Transportation Plan Update. Alternatives Do nothing or consider other alternatives as suggested by the Montana Department of Transportation. Create an SID or identify and apply for Considered: other potential sources of funding (CMAQ…) Advantages of Improved traffic flow and safety at this intersection. Approving this Project: Estimated New Annual Operating Costs: Future Recurring Annual Maintenance Costs: Costs: Other Non-Capital Costs: Total: none Funding 100% Street Impact Fees Sources: City of Bozeman Capital Improvements Plan FY11-15